Laserfiche WebLink
SAN10A U I N Environmental Health Department <br /> Linda Turkatte, REHS, Director <br /> COUNTY <br /> 'cg41FGreatness grows here. <br /> Kasey Foley,REHS,Assistant Director <br /> oa� <br /> PROGRAM COORDINATORS <br /> Robert McClellon, REHS <br /> Jeff Carruesco, REHS,RDI <br /> Rodney Estrada, REHS <br /> Q Willy Ng, REHS <br /> Muniappa Naidu, REHS <br /> November 27, 2018 , <br /> `0 <br /> MICHAEL WALTON <br /> WALTON ENGINEERING, INC. <br /> PO BOX 1025 <br /> WEST SACRAMENTO, CA 95691 <br /> Re: TESORO(SHELL) 68221 SR0079823 <br /> 2705 COUNTRY CLUB BLVD <br /> STOCKTON, CA 95204 <br /> The San Joaquin County Environmental Health Department(EHD) has completed the review of the <br /> application for a permit to upgrade TLS software, upgrade ECPU board software,and replace <br /> audible/visual overfill with Map Plus 846390-xxx(including two 886100-010 float kits) on all three tanks on <br /> the underground storage tank(UST) system at the above noted address. The permit has been approved <br /> with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control District for any <br /> applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval prior to <br /> commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Stacy Rivera at(209)468-3440 to arrange the following appointments (a 48-hour notice is <br /> required for inspection appointments). <br /> • Sensor functionality: Functionality of the monitoring system must be verified to ensure that <br /> monitoring has been restored to meet the requirements of Title 23 California Code of Regulations <br /> and the Health & Safety Code. A copy of the alarm history shall be printed prior to performing <br /> the "cold start" of the monitoring system and made available at the time of EHD inspection. <br /> • Overfill prevention verification: Verify that external audible/visual alarm activates when tank is 90% <br /> fu I I. <br /> Please be aware that the facility cannot operate the UST system prior to the EHD inspection <br /> and approval. <br /> Please be aware that the facility cannot receive fuel in the tank prior to the EHD inspection <br /> and approval. <br /> 4. If concrete will be broken near the tank, a secondary containment test must be performed on the <br /> tank once concrete is poured in accordance with the manufacturer's guidelines. <br /> 1868 E. Hazelton Avenue I Stockton, California 952051 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />