My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2021 9:10:26 AM
Creation date
6/23/2020 6:40:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231072
PE
2361
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
01
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231072_2705 COUNTRY CLUB_2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WALTON <br /> ENGINEERING, ;NC. �® <br /> Overffl Preventiontion-OPW 61 and 71 Series Devices <br /> Owner: Tesoro <br /> Facility: <br /> #68221 - 2705 Country Club, Stockton CA <br /> OPW Overfill Model Number: <br /> Part I - P 4e!VLt Setting Calculation <br /> Tank 1 Tank 2 Tank 3 Tank 4 <br /> Maximum Tank Volume Per: A Gallons 1?(:2 <br /> pa <br /> Max shut off requirement for flapper is 95% B"% ®/® <br /> Multiply Max tank volume by 95% o Gall -:76o-21 <br /> Use tank chart or ATG to determine height of D <br /> Inches <br /> calculated volume 8K51s' <br /> Measure tap of fill riser threads,orface <br /> 3, <br /> Tank diameter in Tank Chart) P Inelles <br /> aZL'' C <br /> Upper Tube in T (G)F-1?=G G Incbes 'x,01 <br /> Subtract 2"from upper tube in tank G-2 K K Inches <br /> Calculated minimum upper tube le (I) <br /> K+1-=I i <br /> luches <br /> Actual measured upper tube len (Without <br /> Inches <br /> fill�j ter} d <br /> Part 2-Device Certification Criteria Evaluation <br /> Does the overfiR prevention device meet the 93% <br /> requirement? <br /> Is the actual measured upper U&length 6.5 inches or <br /> more than the fill riser?(1 must be 6.5"or more thart B) <br /> Does the Overfill prevention device function asrequired? <br /> (Inspect the device for damage,contamination,freedom of <br /> movement, ting due to wear and 22mion <br /> Device Overfill Certification PASS/FAIL <br /> Tube TestiM PASS/FAIL <br /> Technician es that the device is operationally compliant. <br /> Signature of Technician: Date: <br /> T hnici 's c: <br />
The URL can be used to link to this page
Your browser does not support the video tag.