My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2021 9:10:26 AM
Creation date
6/23/2020 6:40:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231072
PE
2361
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
01
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231072_2705 COUNTRY CLUB_2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WALTON <br /> ENGINEERING, INC. � r® <br /> Overfill Preventiontion-OPW 61 and 71 Series Devices <br /> Owner.- <br /> Facility: <br /> r:Facility: <br /> OPW Overfill Model Number: <br /> Part 1-gr2per Heiculation <br /> Tank 1 Tank 2 Tank 3 Tank 4 <br /> Maximum Tank Volume Per: n <br /> pa <br /> Max shut off requirement for flapper is 95% B95% , <br /> .Multiply Max tank volume by 95% C Gallow <br /> Use tank chart or ATG to determine height of <br /> Indies <br /> cal volumeD <br /> Measure top of fill riser ds,or face sealE <br /> a <br /> Tank di m Tank Chart) r rl <br /> r <br /> zo <br /> Upper Tube in T (G)F-D=G G p <br /> Sub 2"from.upper tube in tank G-2"=K K <br /> Calculated tube l (I) I <br /> K+ I <br /> Acred upper tube length(Without <br /> fill ter jinches <br /> Part 2-Device Certification Criteria Evaluation <br /> Does the overfill prevention device meet the 0% <br /> requirement? <br /> Is the actual measured upper tu6e length 6.5 inches or <br /> more than the fill riser?(J must be 6.5"or more than E) <br /> Does the overfill prevention device furiction as ? <br /> (inspect the device for damage,contamination,fitedoin of <br /> movement, ing due to wear and corrosion) <br /> Device Overfill Certification PASS/FAIL <br /> Drop Tube Testing PASS/FAIL + <br /> Technician certifies that the device is operationally compliant. <br /> Signature of Technician: Date: <br /> T , hnici 's Name: <br />
The URL can be used to link to this page
Your browser does not support the video tag.