My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2021 9:10:26 AM
Creation date
6/23/2020 6:40:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231072
PE
2361
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
01
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231072_2705 COUNTRY CLUB_2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification-Page 3 of 3 <br /> Site Address: 2705 Country Club Blvd. Date of Testing/Servicing: 617/18 <br /> F. In -Tank Gauging/SIR Equipment: N Check this box if tank gauging is used only for inventory control. <br /> 0 Check this box if no tank gauging or SIR equipment is installed. <br /> C, <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the folio ing checklist: <br /> 0 Yes [i No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> [I Yes 0 No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> 0 Yes 0 No* Was accuracy of system product level readings tested? <br /> 0 Yes 11 No* Was accuracy of system water level readings tested? <br /> 0 Yes 11 No* Were all probes reinstalled properly? <br /> 0 Yes I El No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): 0 Check this box if LLD's are not installed. <br /> Complete the folio ing checklist: <br /> 0 Yes 0 No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br /> 11 N/A (Check all that apply) Simulated leak rate: 19 3 g.p.h. (L); El 0.1 g.p.h.(2.); 0 0.2 g.p.h.(2.). <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> Im Yes 0 No* Were all LLD's confirmed operational and accurate within regulatory requirements? <br /> Do Yes 0 No* Was the testing apparatus properly calibrated? <br /> 0 Yes 0 No* For mechanical LLD's,does the LLD restrict product flow if it detects a leak? <br /> 0 N/A <br /> 0 Yes 0 No* For electronic LLD's,does the turbine automatically shut off if the LLD detects a leak? <br /> IM N/A <br /> 0 Yes 11 No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> H N/A or disconnected? <br /> 0 Yes 0 No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system <br /> 11 N/A malfunctions or fails a test? <br /> 0 Yes 0 No* For electronic LLD's,have all accessible wiring connections been visually inspected? <br /> im N/A <br /> N Yes 1 13 No* 1 Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H below,describe bow and when these deficiencies were or will be corrected. <br /> H. Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.