My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 11:20:58 AM
Creation date
6/23/2020 6:41:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COCOMPANY ONE WC)RLO. GIME S014-_ <br /> Raising The Standard in No Epoxy Sealants Required! <br /> Overfill Prevention The OPW 71 SO requires no epoxy sealants for installation. No sealants mean <br /> From the company that brought you the the quality and reliability of the installation is significantly improved, promot- <br /> industry standard OPW 61 SO, OPW raises ing the elimination of curing hassles during challenging applications,such <br /> the standard with the introduction of the as extreme temperature conditions. No delays, no mess. EVR compliance is <br /> New 71SO Overfill Prevention Valve— assured with no time-consuming, expensive return visits to re-epoxy the valve. <br /> breakthrough innovation that takes overfill <br /> Prevention to a whole new level of THE NEW 71 SO ELIMINATES <br /> THE MESS AND CURING <br /> overfill perfection. HASSLES OF EPDXY SEALANTS <br /> a Eliminates curing issues,due to <br /> hot or cold temperatures <br /> THE NEW NO EPDXY 71 SO <br /> e Easier,quicker, installation PROVIDES FOR AN EASIER, <br /> HIGHER QUALITY AND MORE <br /> e Higher quality,more reliable RELIABLE INSTALLATION <br /> installation <br /> e Lower costs <br /> *Greater <br /> protection California Air Resources Board <br /> against Phase 1 Vapor Recovery System <br /> fugitive ation(VR-102-H) <br /> emissions <br /> and pressure <br /> decay <br /> o Fastest flow rate in the industry <br /> The new 71 SO is a two-stage, positive <br /> shut-off valve, providing completely <br /> automatic operation with no pre-checks <br /> to perform, no resets, and no overrides <br /> to be broken or abused.The valve closes <br /> when the tank level rises to 95%capacity <br /> and provides a special by-pass valve so <br /> the tank can be filled to a maximum <br /> capacity of 98%.The 71 SO is available <br /> for direct-bury and remote applications. <br /> a The Only Vapor-Tight Overfill Valve In The Industry That Does Not <br /> Direct-Bury Remote-Fill Require Messy,Time-Consuming Epoxy Sealants <br /> 0 Robust Patent/Patent-Pending Design <br /> -Reduces installation time and costs <br /> -Improves quality of installation <br /> 9 Special Patented And Patent-Pending Design Features Enable <br /> Improved EVR Compliance By Eliminating 10 Of 17 Potential Leak Paths <br /> -Typical valves have 17-25 potential leak paths <br /> -Higher level of protection against fugitive emissions and pressure decay <br /> -Improves EVR compliance assurance by 60% <br /> -Reduces/eliminates future maintenance and/or valve replacement costs <br /> 2009 OPW Fueling Components <br />
The URL can be used to link to this page
Your browser does not support the video tag.