Laserfiche WebLink
APPLICATION FOR UNDERGROUND STORAGE TANK <br />CLOSURE PERMIT <br />GENERAL INSTRUCTIONS <br />[ ] 1. Submit all information in triplicate. Answer all questions, leaving no blanks. One copy will be returned to the <br />applicant with comments. <br />[ ] 2. Include a detailed site map on a separate sheet of paper, showing the location of the tanks(s), piping, streets, <br />adjacent properties (north toward the top of the page), nearby septic tanks, leach fields, water wells, buildings, <br />underground public utility lines (including water, sanitary sewer and storm sewer), and distance of piping from tank to <br />dispensers. If underground utilities are not included on the site map, you must state in writing that USA Dig will be <br />contacted prior to excavation activities. <br />[ ] 3. Complete pages 3-5, "Application for Underground Storage Tank Closure Permit". Note: Sampling firm shall <br />be an independent third party from the contractor. <br />[ ] 4. Complete page 8, "Authorization to Release". This form must be signed and dated by the OWNER/OPERATOR <br />of the facility. <br />[ ] 5. Submit a "Service Request" form with the appropriate fees, submit completed UPC forms for Facility and Tanks <br />(formerly State A & B forms) and complete the "Underground Storage Tank Program Fee Worksheet". <br />[ J 6. Complete all questions on page 9, the Environmental Health Department (EHD) "Underground Storage Tank <br />Disposition Tracking Record", except those requiring a signature and date of tank removal. The holder of the <br />permit shall be responsible for ensuring that this form is completed and returned to EHD within 30 days of the tank <br />removal. <br />[ ] 7. Submit a "Site Health & Safety Plan" as an addendum to this application, to address all potential hazards for this <br />specific job site. Refer to the Site Safety Plan Guidance Document for specifics. <br />[ ] 8. If facility is located outside of the city limits, submit a "Backfill Excavation Certificate" as required by the County <br />of San Joaquin Building Department and the incorporated City Building Departments, pursuant to the Uniform <br />Building Code STD 70-11. <br />[ J 9. Obtain a "Grading and Excavation Permit" from the City of Tracy Building Division prior to the Environmental <br />Health Department (EHD) approval of the closure plan. <br />[ ] 10. The maximum review time for Closure Plans is 15 working days from receipt of the adequately completed plan. <br />If gross deficiencies are identified, an addendum will be required with a $152.00/hour fee and the review will begin <br />on the date of resubmittal. <br />11. Submit verification of the fire permit from the appropriate fire district at the removal inspection <br />12. Advance inspection notice of at least 48 hours is required by EHD. <br />13. If planning to over -excavate at time of UST removal, see "III. SITE MITIGATION" on Page 2. <br />1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />