My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2057
>
2300 - Underground Storage Tank Program
>
PR0231083
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2020 11:55:06 AM
Creation date
6/23/2020 6:41:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231083
PE
2361
FACILITY_ID
FA0003735
FACILITY_NAME
QUICK N EASY MART
STREET_NUMBER
2057
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16515309
CURRENT_STATUS
01
SITE_LOCATION
2057 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231083_2057 S EL DORADO_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: Approx. 110' Approx.90' r ,r <br /> Product Stored: Super 91 Regular 87 <br /> Method and location of Test boot at Test boot at II <br /> i in -run isolation: STP Piping Sum #1 STP Piping Sum #2 <br /> Wait time between applying 5 Minutes 5 Minutes <br /> pressure and starting test: IV ° "."'.®i'NAL <br /> Test Start Time: 9:20 9:25 ' I RTS R NT <br /> Initial Reading(Ri): 3 Psi 3 Psi <br /> Test End Time. 10:20 10:25 <br /> Final Reading(RF): 3 Psi 3 Psi <br /> Test Duration: 1 Hour 1 Hour <br /> Change in Reading(RF-Ri): 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.