My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2057
>
2300 - Underground Storage Tank Program
>
PR0231083
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2020 11:55:06 AM
Creation date
6/23/2020 6:41:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231083
PE
2361
FACILITY_ID
FA0003735
FACILITY_NAME
QUICK N EASY MART
STREET_NUMBER
2057
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16515309
CURRENT_STATUS
01
SITE_LOCATION
2057 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231083_2057 S EL DORADO_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> D. Results of Testing/Servicing AIAR 2 7 2017 <br /> Software Version Installed: ENVIRONMENTAL HEALTH <br /> Com late the following checklist: PERMIT/SERVICES <br /> X Yes ❑ No* Is the audible alarm operational? <br /> X Yes C] No* Is the visual alarm operational? <br /> X Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> X Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> X N/A <br /> X Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br /> ❑ N/A detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate positive shutdown? (Check all that apply) <br /> ❑ Sump/Trench Sensors; ❑ Dispenser Containment Sensors. Did you confirm positive shut-down due to leaks and sensor <br /> failure/disconnection? X Yes; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill prevention <br /> X N/A valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating property? If so,at what percent <br /> of tank capacity does the alarm trigger? % <br /> ❑ Yes* X No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* X No Was liquid found inside any secondary,containment systems designed as dry systems? (Check all that apply)❑ Product; ❑Water. If <br /> yes,describe causes in Section E,below. <br /> X Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> X Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E Flow,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Monitoring System Certification Page 2 of 4 12/07 <br /> 2 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.