My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2057
>
2300 - Underground Storage Tank Program
>
PR0231083
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2020 11:55:06 AM
Creation date
6/23/2020 6:41:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231083
PE
2361
FACILITY_ID
FA0003735
FACILITY_NAME
QUICK N EASY MART
STREET_NUMBER
2057
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16515309
CURRENT_STATUS
01
SITE_LOCATION
2057 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231083_2057 S EL DORADO_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> National Gas 2057 EI Dorado Street, Stockton, CA SR0076121 f L E COPY <br /> b. Possess or work under the direct and personal supervision of an individual physically <br /> present at the work site who possesses a valid, current California UST Service <br /> Technician certificate issued by the International Code Council (ICC), and <br /> c. Possesses a valid, current certificate of training from the manufacturer(s) of the <br /> component(s) being tested, repaired, or serviced. <br /> 5. Individuals installing underground storage tank system components must possess or <br /> work under the direct and personal supervision of an individual physically present at the <br /> work site who possesses all of the following: <br /> a. A valid, current contractor's license issued by the Contractors State License Board, <br /> and <br /> b. A valid, current UST Installation/Retrofitting certificate issued by the International <br /> Code Council (ICC), and <br /> c. A valid, current certificate of training from the manufacturer(s) of the component(s) <br /> being installed. <br /> 6. The tank owner shall log into the California Environmental Reporting System (CERS) at <br /> http://cers.calepa.ca.gov/and ensure all UST information is correct. <br /> 7. All components must be certified by an independent testing organization and labeled as <br /> required by the organization (UL, ULC, ANSI, API, ASTM, etc.). See California Code of <br /> Regulations (CCR) Title 23, Chapter 16, Table B for a complete list. <br /> 8. Permit expires 180 days from the date of approval. If an extension to the expiration date <br /> is required, a written request must be submitted to this office prior to the expiration date. <br /> If you have any further questions, please contact me at (209) 468-9852. <br /> Thank you, <br /> Vicki McCartney, REHS 0 <br /> Senior Registered Environmental Health Specialist <br /> c: SM Horizon, 4360 Jessica Circle, Fremont, CA 94555 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.