My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1990-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2320
>
2300 - Underground Storage Tank Program
>
PR0231084
>
COMPLIANCE INFO_1990-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 4:02:25 PM
Creation date
6/23/2020 6:41:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1990-2010
RECORD_ID
PR0231084
PE
2361
FACILITY_ID
FA0006447
FACILITY_NAME
SHELL FOOD MART
STREET_NUMBER
2320
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12521030
CURRENT_STATUS
01
SITE_LOCATION
2320 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\2320\PR0231084\EVR PHASE II PLAN 2008.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> ` Monitoring System Certification-Pagw <br /> f 3 is <br /> Site Address: 2320 N.El Dorado Date of Testing/Servicing: 5-30-01 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 119.02 <br /> Complete the following checklist: <br /> 0 Yes ❑ No* Is the audible alarm operational? <br /> 0 Yes ❑ No* Is the visual alarm operational? <br /> 0 Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirrmed operational? <br /> 0 Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> 0 Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> ❑ N/A operational? <br /> 0 Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) ®Sump/Trench Sensors; ❑Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? 0 Yes; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> 0 N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and o eratin ro erl ? If so,at what percent of tank capacity does the alarm trigger? % <br /> ❑ Yes* 0 No Was any monitoring equipment replaced? If yes,identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* 0 No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes,describe causes in Section E,below. <br /> ❑x Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings? Attach set-up reports, if a licable. <br /> 0 Yes ❑ No* Is all monitoring equipment oerational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> UN-036-3/6 hnp://www.unidocs.org Rev.08/22/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.