Laserfiche WebLink
SITE PREPARATION AND SYSTEM DATA <br />THREE -TANK SYSTEM <br />DATE:'7�'- 19`�- <br />LOCATION NO.: Z O Y- 75' Z y� �U SYSTEM NO.: <br />CITY/STATE: S %TaGK %V/y C /t PRODUCT: <br />SITE PREPARATION <br />OTHER CONDITIONS <br />VAPOR RECOVERY u PLUGS 1-1 R15LRs ����u UTHLH <br />VENT 11 NO PREPARATION a-0PEN TO ATMOSPHERE ❑ P -V VALUE REMOVED ❑ OTHER _ <br />Page R <br />LJ REMOTE/SUBMERSIBLE (DEPTH 1 <br />❑ SUCTION ` (HEIGHT <br />CHECK VALVE <br />STRAINER <br />IMPACT VALVE <br />CHECK VALVE , <br />STRAINER <br />SUCTIO NNECTION <br />❑�/REMOVED & OPEN <br />❑ REMOVED <br />CLOSED <br />El BURIED e <br />❑ REMOVEDTCOVERD <br />❑ UNION <br />MIN PLACE <br />❑CLOSED <br />REMOVED &COVER <br />❑OTHER <br />QI-N PLACE <br />❑ REPLACED &COVER <br />❑OTHER <br />��� �PLLUUG OUT LOSED❑ <br />IIdOPEN <br />EXTRACTABLE, <br />❑ REMOVED <br />IN <br />IN Pt <br />CAP REPLA <br />❑ OT <br />❑ IN PLACE❑ <br />❑ REM ACED <br />OTHER <br />COUPLING <br />EN WITH FOIL <br />EN NO FOILREPLACED <br />PLACE <br />❑ OTHER <br />f- -1-0-1-0r- <br />le -C) <br />-1 1 'gc) <br />.� ej^ � <br />J <br />END <br />TEST 1 DATA <br />CALIBRATION` <br />TANK t TANK 2 TANK 3 <br />LOCATION <br />DROP TUBE" LOCATION DROP TUBE LOCATIO <br />DROP TUBE <br />FILL <br />Gauge <br />Other (Specify) <br />IN <br />OUT <br />None FILL Gauge Other (Specify) IN OUT <br />No <br />Gauge <br />Other (Specify) <br />IN <br />OUT <br />None <br />T. PROBE <br />,r <br />/ Sv <br />'- fe <br />f- -1-0-1-0r- <br />le -C) <br />-1 1 'gc) <br />.� ej^ � <br />J <br />END <br />41a7-0 <br />GT <br />A DIVISION <br />/ <br />BALANCE <br />AOF <br />iJ'3® <br />A*F <br />t Temp. Differential <br />TC= <br />CALIBRATION` <br />AVG. CC'S/DIV- -7J Y z <br />LEAK RATE (LRYCWL-CULATION <br />±Q -DIVISIONS - CC - _ CC IN .OUT <br />LR = X CALIBRATION, - <br />AMINUTE DlWstow MINUTE <br />LR_'�/�� <br />TEMPERATURE COMPENSATION (TC) CALCULATION <br />COEFFICIENT OF EXPANSION 1/ *Fo d <br />LOCATION <br />LEVELS /LL <br />METHOD <br />� soup Roo ❑ LIQUID <br />GRAVITY TEMPERATURE, F <br />Time,; <br />Tank 1 <br />Tank 2 ank 3 <br />2 <br />3 <br />4 <br />5 <br />6 <br />AVERAGE <br />START <br />t7o <br />/d t7 <br />CC'S <br />,r <br />/ Sv <br />'- fe <br />f- -1-0-1-0r- <br />le -C) <br />-1 1 'gc) <br />.� ej^ � <br />J <br />END <br />41a7-0 <br />GT <br />A DIVISION <br />/ <br />T <br />AOF <br />iJ'3® <br />A*F <br />AVG. CC'S/DIV- -7J Y z <br />LEAK RATE (LRYCWL-CULATION <br />±Q -DIVISIONS - CC - _ CC IN .OUT <br />LR = X CALIBRATION, - <br />AMINUTE DlWstow MINUTE <br />LR_'�/�� <br />TEMPERATURE COMPENSATION (TC) CALCULATION <br />COEFFICIENT OF EXPANSION 1/ *Fo d <br />A*F CC IN OUT <br />GRAVITY TEMPERATURE, F <br />3785 GT CE <br />TC = OR <br />❑T.159C <br />TIME'-: MINUTE (+) (-I. <br />SOURCE <br />❑ A ❑ D - ❑ CHART <br />❑ B ❑ E ❑ PUBLISHED DATA AT 600P <br />❑ <br />TC = _/ZP 9 <br />❑ C OTHER <br />TANK 1 TANK 2" <br />SYSTEM CAPACITY, GALLONS <br />!® g 4G <br />GT <br />TANK 1 <br />TANK 2 TANK d <br />T <br />AOF <br />iJ'3® <br />A*F <br />t Temp. Differential <br />TC= <br />T Time of Temp. <br />/ <br />ATime <br />Differential, Min. <br />(% <br />AtSbULU 1 #' CAIi'KA f It Iii Lrlf'UMI_A.ULM I IVIM , <br />ABSOLUTE LEAK RATE= �o6 <br />LEAK RATE TEMP. COMPENSATION CC/MIN <br />- <br />-Ir 406-7 X 0.015852 * 016 <br />CC/MIN GAL/HOUR <br />❑ IF ALR i t 0.05 GPH,,A CHECK TEST WAS CONDUCTED WHICH CONFIRMS THE ABOVE RESULTS (CALCULATIONS ON CHART) <br />❑ A CHECK TEST WAS NOT CONDUCTED. <br />* 60 MINUTES/HOUR T 3785 CC/GALLON - 0.015852 <br />