My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1990-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2320
>
2300 - Underground Storage Tank Program
>
PR0231084
>
COMPLIANCE INFO_1990-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 4:02:25 PM
Creation date
6/23/2020 6:41:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1990-2010
RECORD_ID
PR0231084
PE
2361
FACILITY_ID
FA0006447
FACILITY_NAME
SHELL FOOD MART
STREET_NUMBER
2320
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12521030
CURRENT_STATUS
01
SITE_LOCATION
2320 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\2320\PR0231084\EVR PHASE II PLAN 2008.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D 4-- <br />DIS <br />INSPECTOR'S <br />INITIAL INSPECTION �Gcf22iL <br />DATE <br />UNDERGROUND TANK INSPECTION RECORD <br />PPROVED <br />INITIALS <br />. UL numbers —3 1 3f2A tank size <br />NEW TANK INSTALLATION <br />K <br />SITE NAMES A <br />INSPECTOR'S <br />NAME G$> q <br />o <br />� <br />CITY <br />21P <br />QP. <br />1j <br />i� <br />6. Permit to operate application complete. <br />CONTRACTOR: NAME <br />b. Monitoring ports in place and brought to grade. (lockable weather proof covers) <br />PHONE <br />OWNER: NAME <br />�ry <br />(.-� r <br />PHONE <br />D 4-- <br />DIS <br />INSPECTOR'S <br />INITIAL INSPECTION �Gcf22iL <br />DATE <br />kPPROVED <br />PPROVED <br />INITIALS <br />. UL numbers —3 1 3f2A tank size <br />K <br />3. Overfill rotection installed, descri �5 <br />ITEM OR EQUIPMENT INSPECTED <br />t'to` <br />t <br />o <br />� <br />fees paid <br />QP. <br />1j <br />i� <br />6. Permit to operate application complete. <br />Plans Approved <br />D 4-- <br />7/ <br />S <br />�t <br />NG STAGE INSPECTION `'—� �'� <br />1. Pressure test of piping. [Primary and a ondary (NEPA 30)) <br />INITIAL INSPECTION �Gcf22iL <br />2. Spill protection at fill pipe. <br />2. Ball float valves installed. <br />. UL numbers —3 1 3f2A tank size <br />K <br />3. Overfill rotection installed, descri �5 <br />. Tank tested upon delivery (Holiday (plasteel) or lr_a PSI R I <br />t'to` <br />t <br />o <br />� <br />. Visual inspection of secondary containment. <br />. Tank appropriately placed with approved backfill. <br />1j <br />i� <br />6. Permit to operate application complete. <br />7/ <br />S <br />�t <br />NG STAGE INSPECTION `'—� �'� <br />1. Pressure test of piping. [Primary and a ondary (NEPA 30)) <br />2. Spill protection at fill pipe. <br />2. Ball float valves installed. <br />K <br />3. Overfill rotection installed, descri �5 <br />4. Performance test of product line leak detector. (Hard wired) <br />4. Unused tank opening sealed and cathodicatly protected. <br />5. Performance test of continuous monitoring system(s) on tank (s) <br />5. visual inspection of secondary containment on piping. <br />6. Permit to operate application complete. <br />b. Monitoring ports in place and brought to grade. (lockable weather proof covers) <br />7. Acceptable recordkeeping system. <br />7. Fill and vent piping brought to grade. <br />8. Product line leak detector in place. (Hard wired) <br />K <br />9. Approved tank leak monitoring device installed. <br />i <br />10. All galvanized piping and fittings properly wrapped. <br />3 <br />1. Pressure decay test on complete tank and product delivery system. <br />Comments: <br />FINAL INSPECTION <br />1. Precision test successfully completed and hard copies received. (NEPA 329) <br />2. Spill protection at fill pipe. <br />3. Performance test of overfill protection system. <br />$10 <br />4. Performance test of product line leak detector. (Hard wired) <br />5. Performance test of continuous monitoring system(s) on tank (s) <br />6. Permit to operate application complete. <br />7. Acceptable recordkeeping system. <br />Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.