My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1990-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2320
>
2300 - Underground Storage Tank Program
>
PR0231084
>
COMPLIANCE INFO_1990-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 4:02:25 PM
Creation date
6/23/2020 6:41:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1990-2010
RECORD_ID
PR0231084
PE
2361
FACILITY_ID
FA0006447
FACILITY_NAME
SHELL FOOD MART
STREET_NUMBER
2320
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12521030
CURRENT_STATUS
01
SITE_LOCATION
2320 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\2320\PR0231084\EVR PHASE II PLAN 2008.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W1 <br />PUBLIC HEALTH SERVICES®u, <br />-of,; 0\ <br />SAN JOAQUIN COUNTY <br />JOGI KHANNA M.D., M.P.H. <br />Health Officer <br />P.O. Box 2009 (1601 East Hazelton Avenue) * Stockton, California 95201 <br />(209) 468-3400 <br />Facility Address <br />Approved <br />Approved with changes: See remarks <br />Disapproved; see Remarks <br />Date By PL <br />Approvaloftheseplans extends only to that <br />which is shown and described hereon but does <br />not authorize or approve any omission or <br />deviation of requirements of State laws or <br />local ordinances. <br />1) Attached is the list of contractors previously <br />approved by Public Health Serv' �es, Environmental <br />Health Division (PHS-EHD). Any <br />deviation from <br />this * list requires approval by PHS-EHD- The <br />contractor selected from the above referenced <br />list shall notify PHS-EHD and shall provide a <br />completed tank tracking record before an <br />appointment will be scheduled. Any violation of <br />the above conditions shall render this approval <br />null and void. <br />Three inspections are required for the <br />installation, each with 48 hours advance notice. <br />One inspection is required for the removal, also <br />with 48 hours notice. <br />A Division of Son jn2quin Cuunty I-1valth CarcSrrvites 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.