Laserfiche WebLink
The following checked and/or underlined items are to be addressed on plans: <br />GENERAL <br />1 Provide the name and address of the facility. <br />Provide the name, address, and phone numbers of the contractor{s), facility <br />owner(s), and operator(s). <br />Provide four complete sets of. lanse <br />p (On to be retained by this office). <br />lrclude specification sheets, equipment brochures, monitoring. and response <br />plans. <br />4. Provide plans to scale in nonerasable blueprint. <br />CONSTRUC ON STANDARDS <br />1. Locations) and number of tanks. <br />:22. Type of tank(s) to be installed. �� O <br />A. Steel clad with fiberglass reinforced astir. <br />1. 35,000 to 40,000 volt Holiday Test required before "setting" tank(s) <br />in ground. <br />B. Fiberglass <br />1. Striker plae dimensions and materials. <br />2. Striker plates under a l accessible openings. ? <br />C. Nonclad steel <br />1. Cathodic protection provided (including nuts, bolts. washers, etc.). <br />a. Approved by a corrosion engineer or NACE ,technician. <br />b. Document stating inspection method and frequency (Minimum semi- <br />annual inspection required). <br />D. Other types of tanks <br />I. Construction specification standards for durability. <br />3 Tank Capacity (List specific gallonage). 1 0 <br />Z4. Contents to be stored in each tank (Be specific). <br />A. Verification of product compatibility with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. <br />1. List testing organization and approval. <br />o <br />5. Provide manufacturers written installation instruc o s.c ud 'piping, <br />monitors, tanks, etc. <br />Note - NFPA 30 Test required before covering tank and systems. NFPA 30 Test <br />is reqecTon BOTH the Primary and Secondary containment systems. <br />Double walled tanks using pressure or vacuum testing to monitor annular <br />space are exempt from testing secondary container. <br />Note - NFPA 329 "Precision Test" required upon completion of installations. <br />nne test result copy to be sent directly to tib i department from the <br />testing company. <br />?'-�tt - -1/ <br />