Laserfiche WebLink
0 <br />° e <br />OPTION 2A <br />I'-- <br />ARTICLE 3, SECTYON 2633/2634 <br />MOTORVERCLE FUELS ONLY <br />9 MI <br />_..,..,_„i • R i cements : <br />.,,Approved tank construction material <br />Leak interception and detection system which complies with Article 3, <br />Section 2631(c). <br />Membrane liners must comply with Article 3, Section 2633(e), (1), (2)9 <br />(3)9 (4),( 5) and are only allowed for piping systems (Department Policy) <br />D. Demonstrate that the leak interception and detection systems protects <br />?4), <br />round water from contamination Article 3, Section 2633(f), (1), (2), (3), <br />Ms (6), (7).T <br />Pressurized piping syst — st insta led with a leak detector that is <br />capable of automatically shutting off the product pumps. <br />1. Any single wall component "tank or piping" requires daily inventory <br />reconci W ation and annual precision tests as part of the monitoring <br />program. <br />F Before covering, the tank(s) and system(s) must be tested to NFPA 30. <br />Standards. <br />Before use - the tank(s) and system(s) must be tested in accordance to <br />booNFPA 329. <br />Provide soil profile of vadose zone if membrane liners are used. <br />OPTION 2B <br />ARTICLE 3, SECTION 2634 <br />MOTOR VEHICLE FUELS ONLY <br />MONITORING <br />J. Requirements (leak interception and detection system(s)). <br />A. Floor must be constructed on a firm base and sloped to a <br />Access casings must be installed in accordance to Article <br />2634 (c) (1 thru 6), (d) (1). <br />C. Submit written monitoring and response plan as stated in <br />Section 2634 (d) 01 3), 2634(e) (1-5). <br />D Hard wiring of electronic monitoring systems is required. <br />E. Provide-manufacturer°s written installation instructions. <br />collection sump. <br />3. Section <br />Article 3, <br />