My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2320
>
2300 - Underground Storage Tank Program
>
PR0231084
>
COMPLIANCE INFO_2001-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 4:10:21 PM
Creation date
6/23/2020 6:41:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2011
RECORD_ID
PR0231084
PE
2361
FACILITY_ID
FA0006447
FACILITY_NAME
SHELL FOOD MART
STREET_NUMBER
2320
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12521030
CURRENT_STATUS
01
SITE_LOCATION
2320 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\2320\PR0231084\FINAL JUDGMENT 11-06-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
507
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />11 <br />Table of Contents <br />III NUNN <br />ISD Vapor Flow Meter Installation <br />Contractor Certification Requirements..............................................................................1 <br />RelatedManuals...............................................................................................................1 <br />SafetyPrecautions............................................................................................................1 <br />BeforeYou Begin..............................................................................................................2 <br />Veeder-Root Parts............................................................................................................3 <br />ToolsRequired.................................................................................................................3 <br />Installation Steps - Vacuum Assist System Above Shear Valve.......................................4 <br />Installation Steps - Vacuum Assist System Below Shear Valve...:...................................6 <br />Seal and Connect Field Wiring.........................................................................................9 <br />Figure 1. Example Vapor Flow Meter Installation Above Shear Valve ..................5 <br />Figure 2. Field wiring Vapor Flow Meter - Observe Polarity..................................5 <br />Figure 3. ' Example flow meter installations with approximate clearances ..............7 <br />Figure 4. Example Vapor Flow Meter Installation Below Shear Valve ...................8 <br />Figure 5. Epoxy sealing field wiring.......................................................................9 <br />Figure 6. Connecting Vapor Flow Meter to Smart Sensor Interface Module .......10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.