Laserfiche WebLink
ISD Flow Meter Installation Guide Installation Steps - Vacuum Assist System Below Shear Valve <br />Installation.s - Vacuum Assist System Below <br />NOTE: The Vapor Flow Meter should be installed prior to setting the dispenser in place or prior to <br />installing any vacuum assist retrofit kits. If retrofitting the vacuum assist system, follow all <br />manufacturer's instructions. <br />1. Before installing this device, turn Off, tag/lock out power to the system, including console and submersible <br />pumps. <br />2. Remove the dispenser's lower sheet metal doors to access the vapor plumbing, if necessary. <br />3. If a retrofit vacuum assist kit will be installed, remove any hardware specified in the manufacturer's installation <br />instructions. Do not install the retrofit assembly at this time. <br />4. Remove any unneeded field installed plumbing between the vapor shear valve and the vapor return line fitting. <br />Figure 3 shows two example installations of the Vapor Flow Meter with the required lateral or wye fitting for <br />running the TP -201.4 back pressure test. Approximately 3 inches of clearance is required on both sides of the <br />piping to accommodate the width of the meter body. <br />5. Connect the lower flange to the pipe that is connected to the lateral or wye access fitting (see Figure 4). <br />6. Install the Vapor Flow Meter over the lower flange. <br />7. Connect the upper flange with serviceable screen above the Vapor Flow Meter. <br />8. Using a close nipple, thread the shear valve into the upper flange. <br />9. Install the vacuum assist retrofit kit, if required, following the retrofit kit manufacturer's installation instructions - <br />or fit the dispenser to its permanent mounting points. <br />10. Using nipples, unions, and other plumbing as required, connect the vacuum assist outlet to the shear valve. <br />11. Route the wiring into the junction box via the supplied cord grip assembly. Connect the wires from the Vapor <br />Flow Meter to the field wiring from the console and cap with wire nuts (see Figure 2). <br />12. After all other ISD Vapor Flow Meters and the ISD Pressure.Sensor are installed, pressurize the tank ullage <br />space and vapor piping to at least 2 inches WC and test for leaks using leak detection solution. <br />