Laserfiche WebLink
OCT-1-2007 08:18A FROM: TO:4683433 P.2/3 <br /> Underground Storage Tank Monitoring Plan—Page 2 of 2 <br /> MONITORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METHODS)(Check all that apply) <br /> ❑ t CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) <br /> PANEL MANUFACTURER; MS1 MODEL N: M52. <br /> LEAK SENSOR MANUFACTURER: M" MODEL 4(Sy M54, <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ❑ a.YES ❑ b.NO Mss. <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M56. <br /> WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M57. <br /> 92.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAJN ASSEMBLY)IN'� TRIPS SHEAR VALVE IN CASE OF LEAK <br /> ASSEMBLY MANUFACTURER. J fflJD MS' MODEL#(S}: M59. <br /> ❑ 3.VISUALMONITORING DONE- Q a.DAILY [] h.WF..EKLY(Requires aaency,Mpvw)13D4' M60. <br /> ❑ 4.NO DISPENSERS <br /> ❑ 99.OTHER(Specify) M61. <br /> a' G E'mo <br /> Q 1.WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD TI-IAT WE MUST IMPLEMENT ENHANCED LEAK M7o. <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> a.. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) Mao. <br /> I' THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> 3. THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of January 1.2005) <br /> 4. CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEF..KLY MANUAL.TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> 99.❑ OTHER(Specify): Mai. <br /> Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their Job duties and can access those documents when needed. <br /> By January I,2005,this facility will have a"Designated UST Operator"who has passed the California UST Sytem Operator Exam administered by the International <br /> Code Council(ICC). By July 1,2005,and annually thereafter,the "Designated UST Operator"will train facility employees in the proper operation and maintenance <br /> i of the UST systems.This training will include,but is not limited to,the following: <br /> Operation of the UST systems in a manner consistent with the fltcility's best management practices. <br /> ➢ The facility employee's role with regard to the leak detection equipment. <br /> ➢ The facility employee's role with regard to spills and overfills. <br /> Y Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after July 1,2005,the initial training will be conducted within 30 days of the date of hire. <br /> : <br /> . . ... ., -rx. C...gm <br /> Please use this section to include any additional UST system monitoring-related information(e.g.,additional information required by your local agency): Mss <br /> Note regarding Section X.Pending certification of a Designated UST Operator,the following person has authority for performing the monitoring <br /> activities an ain fining pk detection equipment covered by this plan. NAME: JOB TITLE: <br /> IS910 vawe st".-A--cc si"O.0— <br /> 1 �jLett 14ta�Y-e.�4 <br /> RE rON-MRa. <br /> AS OF JANUARY 1, 2005, THE -DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT <br /> APPLICATION—FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING <br /> LEAK DETECTION EQUIPMENT COVERED BY T141S PLAN,AND WILL..PF,R.FORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS <br /> OF THE FACILITY'S UST SYSTEMS IN ACCORDANCE WITH 23 CCR§271 S(pl. <br /> XI; f:} R/®PERATOR SIGNATURE <br /> CEIMIFICATION:.I certify that the information provided herein is true and accurate to the best of ml knowledge. <br /> OWNER/OPERATOR SIGNATU 1L DATE: j rr q�cd M91. <br /> M. Onerator M9o. 5/)s�//4)J 6,t�> <br /> OWNER/OPERATOR NAME(print): M92. OWNER/OPERATJOR TITLE: M93 <br /> (Agency(Ise Only) This plan has been reviewed and: Approved ❑Approved With Conditions ®Disapproved <br /> Local Agency Signature: Date; 1 Uo I�!1 <br /> Comments/Special Conditions: <br /> UN-022A-3/5 www.unidoes.org Rev.10/14/03 <br />