Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN _ a e 2 of 2 <br />;(Che:gcka1)V'I. <br />UNDER DISPENSER CONTAINMENT (UDC) MONITORING <br />UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br />El1. CONTINUOUS ELECTRONIC MONITORING Ef 2. FLOAT AND CHAIN ASSEMBLY Q 3, ELECTRONIC STAND-ALONE <br />490546 <br />❑ 4 NO DISPENSERS ❑ 99.OTHE Specify) <br />490.54b. <br />- - <br />490-56. <br />49oss MODEL <br />LEAK MON[TOR MANUFACTURER <br />49o-sa. <br />4905, MODEL JIM: <br />LEAK SENSOR MANUFACTURER - <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a. YES Cg -b. NO <br />49a s9 <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN P A[ a. YES g b. NO <br />d90-0 <br />FAILURFID[SCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 61f -a. YES 51 b, NO <br />49041 <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. 1Z a YES ❑ b. NO <br />-490a3 <br />490-61.- <br />UDC CONSTRUCTION [S St 1. SINGLE WALL ❑ 2. DOUBLE WALL <br />a90raL <br />IF DOUBLE WALL: <br />UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a. LIQUID ❑ b. PRESSURE ❑ c. VACUUM <br />TRIGGERS AUDIBLE AND VISUAL ALARMS. ©e. YES ❑ b. NO <br />490'e4b. <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC <br />VII.. PERIODIC SYSTEM TESTING <br />I. ELD TESTING: THIS FACILITY I4AS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED <br />daLD MUST BE PERFORMED. PERIODIC ELD 1S PERFORMED EVERY 36 MONT 4S AS REQUIRED. 23 cca 1x44.11 <br />a9rws <br />® 2. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. <br />4906,- <br />® 3. SPILL BUCKETS ARE TESTED ANNUALLY. <br />VIII. RECORD KEEPING <br />49rtbs. <br />The following monitoringIrmintenattce records aro kept for this facility, <br />® a. ALARM LOGS ❑ b VISUAL INSPECTION RECORDS ❑ c. TANK INTEGRITY TESTING RESULTS <br />documentation records) <br />❑ d SFR TESTING RESULTS (and supporting documentation records) ❑ e. TANK GAUGINGRESULTS(andsupporAY ting <br />P <br />[3f ATG TESTING RESULTS (and supporting documentation records) Q g. OE CTION <br />h. EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br />IX. TRAINING <br />Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their ph duties: <br />49aa9e <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Checkatl that applyj <br />49049b <br />® THIS UNDERGROUND STORAGE TANK MONITORING PIAN (Required) <br />49049G <br />($� OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) <br />4 <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />❑49ab9n <br />CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION- "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />490-W <br />STATISTICAL INVENTORY RECONCILIATION" <br />40"91 <br />❑ SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" <br />490.695 <br />❑ OTHER (Specify): <br />This facility has a "Designated UST who hes the California UST System Operator Exam administered by the tnumetionai Code Council <br />� passed <br />4904%. <br />x90fi0 <br />(ICC). The "Designated UST Operator" will train facility ctnploytes in the proper operation and maintenance of the UST systems annually, and within 30 <br />days of hire. This training wilt include, but is not limited to, the following <br />> Operation of the UST systems in a manner consistent with the facility's hest management practices. <br />> The facility employee's role with regard to the monitoring equipmem, as specified in this UST Monitoring Plan. <br />> The facility employee's role with mgt to spills and overfills as specified in ft fbQlitY`s UST Response Pian. <br />* Narne(s) of contact person(s) for emergencies and monitoring alarms. <br />X. COMMEN`t'S/ADDITIONAL INFORMATION <br />Provide additional oorrttrrems here or indicate how many with additional information on specific monitcuing procedures ate attached t0 this plan. <br />a9oa1 <br />95`x/0 oto • Vat„e Sh,,,,4 b�K-tem.... SP.tt t3�� <br />XI. PERSONNEL RESPONSIBILITIES <br />The UST OwnerlOperator is rospeptsible for ensuring that: 1.) the dailytrottiine UST monitoring activities and maintenance of UST leak detection equipment <br />are maintained property, <br />covered <br />by this plan occurs-).) all conditions that indicate apossible release ares investigated, and 3. all monitori records <br />THE FOLLOWING PERSON(S) ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br />NAME �t,� ("t_ Lu�2 490,1, TITLE: �%rcR rti�aGn� /CFa <br />490-73 <br />NAME' 49074 TME. <br />49045. <br />The Designated UST Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator. and infirm the ownedoperator oPnny <br />conditions that need follow -ug action. <br />XII. OWNER/OPERATOR SIGNATURE <br />CERTIFICATION: I cern that the information rovided betrein is tragi and accurate to the best of my knowledge, <br />490.77 <br />APPLICANT SIGNATURE <br />DATE: <br />REPItFSFNirF3(a. 1. TaricOtt>te* 2 F O 3. M�9ronmd woro+ner 494-76. <br />aria -79. <br />49tF,a <br />APPLICANT NAME(print): <br />APPLt ANT TITLE - <br />� � � `(` 1-rD <br />�E <br />UPCF IiST--D (1 212007) - V4 www.unklocLortl <br />