Laserfiche WebLink
` <br />NDE VPLT COMPUTERIZED PRECISION TEST REPORT -PATENT PENDING <br />GENERAL REPORT FORM ~ KOPYR%BHT 1985 <br />P�B� 4 <br />" __- <br />1. TOTAL TEST CONDUCTION TIME - 02:46:06 hours <br />Leak rate calculation time : <br />a. start : 13:34:04 hours <br />b. end : 16:20:10 hours <br />2. Fluid level abowe grade 35 inches <br />Q. Height of water present in tank 0 inches <br />4. <br />Piping <br />pressure test conducted <br />NO <br />5. <br />Amount <br />of pressure applied to system <br />N/A psi <br />6. <br />Amount <br />of pressure drop <br />N/A psi <br />7. <br />Elapsed <br />time during test <br />N/A minutes <br />S. <br />System <br />pass br fail <br />N/A <br />9. Was turbine pump activated <br />N/A <br />10.If full system leakage rates are in excess of allowable <br />limits, were the owners notified of any additional testing <br />procedures necessary to isolate leakage to the tank or tank <br />piping. N/A <br />~ . , <br />� <br />11"Have these additional testing procedures been completed? <br />, N/A <br />12.Was helium leak pinpointing services recommended in <br />pinpointing location of leak. <br />NO -- <br />SNAVELY ENTERPR%SESv INCORPORATED - 133et S. HENDERSON <br />P"O.~BOX5- ��RUTHER�v CALIFORNIA 93G0� - ���~���-1G3� <br />`~. ` <br />^ ^ <br />