Laserfiche WebLink
NDE VFLT COMPUTERIZED PRECISION TEST REPORT -PATENT PENDING <br />GENERAL REPORT FORM - @COPYRIGHT 1985 <br />PAGE 4 <br />1. TOTAL TEST CONDUCTION TIME - 04:01:33 hours <br />Leak rate calculation time : <br />a. start : 09:08:23 hours <br />b. end : 13:09:56 hours <br />2. Fluid level above grade 30 <br />3. Height of water present in tank 0 <br />inches <br />inches <br />4. Piping pressure test conducted NO <br />5. Amount of'pressure applied to system N/A ` psi <br />' <br />6. Amount of pressure drop N/A psi ' <br />7. Elapsed time during test |N/A minutes <br />.` <br />S. System pass'or fail N/A � <br />9. Was turbine pump activated N/A <br />10"If full system leakage rates are in excess of allowable <br />limits, were the owners notified of any additional testing <br />procedures necessary to isolate leakage to the tank or tank <br />piping. N/A <br />. , <br />11.Have these additional testing procedures been completed? <br />N/A ' <br />12.Was heliud leak pinpointing services recommended in <br />pinpointing location of leak. <br />NO <br />SNAVELY ENTERpR%SESv INCORPORATED - 133S1 S. HENDERSON <br />p.O; BOX 5/~ CARUTHERSv CALIFORNIA 93609 - 800-345-1633 <br />`-- <br />-` <br />^ <br />` ' <br />