Laserfiche WebLink
' <br />` <br />NDE VPLT COMPUTERIZED PRECISION TEST REPORT -PATENT <br />~PENDING <br />GENERAL REPORT FORM - WOPYRIGHT 1985 <br />PAGE 4 <br />I. <br />TOTAL <br />TEST CONDUCTION TIME - <br />04:26:02 <br />hours <br />` <br />Leak rate calculation <br />time : <br />' <br />a. start : <br />02:58:18 <br />hours <br />.' <br />b. end : <br />07:24:19 <br />hours <br />2. <br />" <br />Fluid <br />level above grade <br />30 <br />inches <br />3. <br />Height <br />of water present in tank <br />0 <br />inches <br />PIPING <br />PRESSURE TEST ~ HYDROSTATI <br />C P : RESSURE <br />DATA <br />4. <br />Piping <br />pressure test conducted <br />NO ` <br />� <br />'`-- 5. <br />Amount <br />of pressure applied to system <br />N/A <br />psi <br />6. <br />Amount <br />of pressure drop <br />N/A <br />psi <br />7. <br />Elapsed time during test <br />N/A <br />minutes <br />S. <br />System <br />pass or fail <br />N/A <br />9. Was turbine pump activated <br />N/A <br />10.If full system leakage rates are in excess of allowable <br />limits, were the owners notified of any additional testing <br />procedures necessary to isolate leakage to the tank or tank <br />piping. N/A <br />--11.Have-these additional testing procedures been completed? <br />N/A <br />12.Was helium leak pinpointing services recommended in <br />pinpointing location of leak. <br />NO <br />