My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1901
>
2300 - Underground Storage Tank Program
>
PR0231092
>
COMPLIANCE INFO_1985-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 3:05:25 PM
Creation date
6/23/2020 6:41:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1997
RECORD_ID
PR0231092
PE
2361
FACILITY_ID
FA0001946
FACILITY_NAME
El Dorado Food Mart
STREET_NUMBER
1901
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16508019
CURRENT_STATUS
01
SITE_LOCATION
1901 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231092_1901 S EL DORADO_1985-1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
't50URC.S C <br /> STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD 3 <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION -FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. C7 C,`I'ORH•' <br /> MARK ONLY ❑ 1 NEW PERMIT 3 RENEWAL PERMM' ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY C 7SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT A1BEB PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: 'g C e n <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.# B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAY/YEAR) D. TANK CAPACITY IN GALLON n <br /> II.TANK CONTENTS IF A-1 IS MARKED,COMPLETE ITEM C. v <br /> A. 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C ❑ to REGULAR UNLEADED ❑ 3 DIESEL ❑ 6 AVIATION GAS <br /> F__] 2 PETROLEUM ❑ 80 EMPTY ❑ 1 PRODUCT tb PREMIUM UNLEADED ❑ 4 GASAHOL ❑ 7 METHANOL <br /> 1c MIDGRADE UNLEADED ❑ 5 JET FUEL ❑ 8 M85 <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER(DESCRIBE IN ITEM D.BELOM <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.#: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B,AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM 2 SINGLE WALL ❑ 4 SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK <br /> 1;Z71 <br /> 1 BARE STEEL ❑ 2 STAINLESS STEEL F—] 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE F-] 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> LINING OR ❑ 5 GLASS LINING 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO— <br /> D.EXTERIOR ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE K95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL CtC. SPILL CONTAINMEN INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> + DROP TUBE YES NO STRIKER PLATE YES NO DISPENSER CONTAINMEN YES NO <br /> IV.PIPING INFORMATI N CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A&95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION 1 MECHANICAL LINE LEAK 2 LINE TIGHTNESS 3 CONTINUOUS INTERSTITIAL 4 ELECTRONIC LINE 5 AUTOMATIC PUMP <br /> DETECTOR ❑ TESTING ❑ MONITORING ❑ LEAK DETECTOR ❑ SHUTDOWN LK 99 OTHER <br /> V.TANK LEAK DETECTION (7:s 1 <br /> ANNUAL <br /> ❑ 1 VISUAL CHECK ❑ 2 MANUAL RECONCILIIATIONVENTORY ❑ 3 MONITORING VADOZE ❑ 4 GAUGING AUTOMATIC TANK E::] 5 MON TORINGGROUND WATER ❑6 TTEESTINGTANK <br /> ❑ 7 MONITORING INTERSTITIAL 8 SIR 1:19 WEEK LY MANUAL ❑10 MO T HLY TANK E] 95 UNKNOWN ❑99 OTHER <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PLACE) <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO ❑ <br /> SUBSTANCE REMAININGGALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT <br /> TANK OWNER'S NAMEn DATE <br /> (PRINTED 8 SIGNATURE) Z� K�f' ,� ) Iz_210 <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE OUR NUMBERS BELOW �S <br /> k6COUNTY# JURISDICTION# FACILITY#00 f?t f r'� TANK#on <br /> STATE I.D:# mI P I 3 I f o a I A 0 17 o .Z <br /> R PERMIT APPROVED BYIDATE PERMIT EXPIRATION DATE <br /> MPANIED BY A PERMIT APPLIC ON.FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS.THIS FORM <br /> COMPANIED BY A PLOT PILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE 0GROUND STORAGE TANK REGULATIONS <br /> FOR0034&R7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.