My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1901
>
2300 - Underground Storage Tank Program
>
PR0231092
>
COMPLIANCE INFO_1998-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 2:53:38 PM
Creation date
6/23/2020 6:41:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2008
RECORD_ID
PR0231092
PE
2361
FACILITY_ID
FA0001946
FACILITY_NAME
El Dorado Food Mart
STREET_NUMBER
1901
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16508019
CURRENT_STATUS
01
SITE_LOCATION
1901 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231092_1901 S EL DORADO_1998-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NIFIEO PROGRAM CONSOLIDATED FORM <br /> SAN JOAQUIN COUNTY UNIFIED PROGRAM -TANKS <br /> UNDERGROUND STORAGE TANKS -INSTALLATION <br /> CERTIFICATE OF COMPLIANCE <br /> (one page per tank) <br /> Page _ of <br /> L,FACILITY IDE NTIFICAtION <br /> W BUSINESS NAME(Same as FACILITY NAME or DBA-Oo, g Business As) <br /> I <br /> ADDRESS(ForMcal use only) /� ``�� <br /> 490' <br /> �c- <br /> FAC[UTYID# 1 TANK <br /> IL INSTALLATION <br /> (Check aU that apply) <br /> The installer has been trained and certified by the tank and piping manufacturers. <br /> ❑ The installation has been inspected and certified by a registered professional engineer having education and <br /> experience with underground storage tank installations. <br /> The installation has been inspected and approved by the Unified Program Agency. <br /> All work listed on the manufacturer's installation checklist has been completed. <br /> The installer has been certified or licensed by the Contractors' State License Board. <br /> The underground storage tank,any primary piping,and secondary containment was installed according to <br /> applicable voluntary consensus standards and written manufacturer's installation procedures. Description of <br /> work being certified: <br /> III:TANK OWNERIAGENT SIGNATURE', <br /> th a in aeon ad herein is Gus to the best of my knowledge. <br /> N DATE <br /> NAME OF TANK 0AGENT(print) "w TITLE TANK UAGENT <br /> N c <br /> CUPAFORMS(4/99) Formerly SWRC13 Form C <br />
The URL can be used to link to this page
Your browser does not support the video tag.