My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1901
>
2300 - Underground Storage Tank Program
>
PR0231092
>
COMPLIANCE INFO_1998-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 2:53:38 PM
Creation date
6/23/2020 6:41:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2008
RECORD_ID
PR0231092
PE
2361
FACILITY_ID
FA0001946
FACILITY_NAME
El Dorado Food Mart
STREET_NUMBER
1901
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16508019
CURRENT_STATUS
01
SITE_LOCATION
1901 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231092_1901 S EL DORADO_1998-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V <br /> PUBLIC HEALTH SERVICES aPQ•V�N.. <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DIVISION <br /> Karen Furst, M.D., M.P.H., Health Officer <br /> 304 East Weber Avenue, Third Floor • Stockton, CA 95202 <br /> 209/468-3420 <br /> MEMORANDUM <br /> Date: March 6, 2000 <br /> To: Mike Flores, Project Manager <br /> Stockton Service Station E ment Company, Inc. <br /> From: Alison Youngblood, EHS <br /> San Joaquin County, PHS-E D <br /> Re: Quick & Save, 1901 S. El Dorado St., Stockton <br /> The proposed plan and application for permit to install new underground storage tanks <br /> at the above referenced location, have been approved with the following conditions: <br /> 1. All new submittals supercede the previously submitted ones. <br /> 2. As builts of project must be provided before final permit to operate will be <br /> granted. <br /> 3. Submit state form C for each tank system to EHD upon job completion. <br /> 4. Automatic pump shutdown must satisfy all conditions listed in Title 23 2636(8) <br /> of CCR or annual line tightness testing will be required. <br /> 5. All inspections to be scheduled at least 48 hours in advance. <br /> 6. Please contact the local Fire Department for permitting requirements. <br /> 7. All metal fittings and piping in contact with backfill or soil must have corrosion <br /> protection. <br /> 8. Attachments are part of the plan and must accompany plans on site. <br /> 9. Any changes in the information provided must be submitted to EHD for approval <br /> prior to commencing work. <br /> 10.13ased on bouyancy calculations, 3'9" of pea gravel and the slab must be 3". <br /> According to the tank manufacturer's specifications, the tank shall not exceed a <br /> 5' burial depth. <br /> 11.The overfill prevention system will not allow for manual override and will alert <br /> the transfer operator at 90% full by restricting the flow into the tank or <br /> triggering an audible and visual alarm according to Title 23 2635(b)(2)(A). <br /> 12.This permit expires at the end of the calendar year. <br /> Please contact me at (209) 468-9848 to schedule inspections and with any questions. <br /> A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.