My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1901
>
2300 - Underground Storage Tank Program
>
PR0231092
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 3:01:37 PM
Creation date
6/23/2020 6:41:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231092
PE
2361
FACILITY_ID
FA0001946
FACILITY_NAME
El Dorado Food Mart
STREET_NUMBER
1901
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16508019
CURRENT_STATUS
01
SITE_LOCATION
1901 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231092_1901 S EL DORADO_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
473
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WF UNIFIED PROGRAM CONSOLIDATED FORMW <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pae 1 of 2) <br /> TYPE OF ACTION ❑1.NEW PLAN 10 2.CHANGE OF INFORMATION 490.1 <br /> PLAN TYPE M 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(';)- <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) _ t <br /> BUSINESS NAME(Same as FACILITY NAME) &LuL,�_ /�r 3. <br /> BUSINESS SITE ADDRESS C1 r_ n��, S f� 103 CITY 104 <br /> �t"T ll'(� r <br /> H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 2632 2634 2638,2641 <br /> 490-38 <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): 490-3b <br /> M.MONITORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. Dr2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)49o.4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: Q a.DRY ❑ b.LIQUID FELLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490.6 <br /> PANEL MANUFACTURER: S L) Ct CC, 4�3MODEL#: �> _�_�� 490-8 <br /> LEAK SENSOR MANUFACTURER: V6;6 f)L:IW__ c ) 490.9. MODEL#(S): --1%-Z{1 490.10 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 0-90-1' MODEL#: 490-13 <br /> IN-TANK PROBE MANUFACTURER: 490.14. MODEL#(S): 490-15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> 490-18 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 490,19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-21 <br /> 490-22 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-24 <br /> 490-25 <br /> ❑99.OTHER (Specify): 490-26 <br /> 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 49528 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:®a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> PANEL MANUFACTURER: 1 CV17-1 Vr_ A,,-,7'" 490-30 MODEL#: j 490-31 <br /> LEAK SENSOR MANUFACTURER: ���� C-f" 12 MODEL#(S): 7,e)4 490-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. 13a.YES ❑b.NO 490-34 <br /> FAILUREMISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. R&YES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 26 490-36 <br /> MLLD MANUFACTURER(S): PC- rC-7'�-ti' 490-37 MODEL#(S): 5,if M C n 490-38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490.39 <br /> ELLD MANUFACTURER(S) 49oao. MODEL#(S): 490.41 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. [12.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490.43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49044 <br /> 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FREQUENCY a.ANNUALLY b.EVERY 3 YEARS c.OTHERS i 490-46 490.47 <br /> 5.VISUAL PIPE MONITORING. 49048 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 490-49 <br /> 'Allowed for monitoring of unburied enMency genendor fuel piping only per HSC§25281.5(b)(3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(ax3)1. 490-50 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490.51 <br /> ❑ 99.OTHER(Specify) 49052 <br /> 490.3 <br /> UPCF UST-D(12/2007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.