Laserfiche WebLink
t'"�'.�� K�rt �t' � .' t t .� +: ♦ c?'es +"� : e ,t¢ e ,..ter <br /> w e emee e.. r m. + t ent •' t.:a+.. zat; q' rk a t f t t e,tt of v .. <br /> - i ♦ y t• y i I s r y q �Y .r ± N f se N <br /> y 4 4 <br /> SWRCB,January 2002 <br /> t -1-Page r <br /> 6- PIPING SUW TESTING <br /> Test Method Developed By: D Sump Manufacturer dustry Standard O Professional Engineer <br /> O Other.(Spec) <br /> Test Method Used: D Pressure O Vacuum ydrostatic <br /> D Other(Speci,fy) <br /> Test Equipment Used: <br /> Equipment Resolution <br /> Sump Diameter: <br /> Sm-rp <br /> Sump:Materials SSS <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: Z q[OiNAOYes <br /> Height$om Tank Top to LowestElectrical Penetration:Condition of sump prior to testing:Portion of Sump Tested' !� °Does turbine shut down when <br /> sump sensor detectsliquid(both Ayes O No D NA M"Yes ❑Na O No DNA D Yes O No O NA <br /> roduct and,water?' <br /> Turbine shutdown response time <br /> F�shutdown?* <br /> programmed for fail-safe <br /> C�Yes O No DNA es 0 N DNA O Yes O No DNA O Yes O No O NA <br /> -safe verified to beal?` C Yes O No O NA As 11No O NA O Yes ONo DNA O Yes O No DNA <br /> Wait time between applying <br /> pressure/vacuum/water and starting .� <br /> test: <br /> Test Start Time: ® Q S <br /> Initial Reading W: �f <br /> Test End Time; r <br /> Final Reading(RF): 2!� <br /> Test Duration: <br /> Change in Reading <br /> Pass/Fail Threshold or Criteria: <br /> Y'to <br /> Was sensor removed for testing? Yes O No D NA KYes O No D NA O Yes 0 No DNA O Yes O No DNA <br /> Was sensor properly replaced and / <br /> verified functionalafter testis ? Yes O No O NA es O No DNA O Yes ONo DNA O Yes bNo DNA <br /> C _mm"', S—(iznclude i arm ' n on.r airs ade rior to testing, and recommended-ollowz u or ailed tests) <br /> O�1 S�� <br /> 'If the entire depth of the sum*)i",-n*'P010 c- r:-r.,x-••r., Ilk -r •.. <br />