Laserfiche WebLink
• <br />MALLING A NEW DISPENSER <br />In some situations you may encounter existing conduits that are <br />located outside the existing UDC's opening / water splash. You may <br />be required to purchase additional components. Refer to the Conversion Frame Evaluation Form. <br />YOU ARE NOT AUTHORIZED TO MODIFY THE CONVERSION <br />FRAME IN ANY WAY !! Contact Bravo Systems immediately at 800 -AT -BRAVO to <br />begin a factory evaluation and to obtain compliant directions tailored to your specific application. <br />Al - Remove existing dispenser from its mounting points. <br />AZ - Align and secure conversion frame to the island / concrete with minimum 112"o diameter bolts. <br />For Non -Bravo Sumps - A minimum of four (4) anchor bolts must be secured directly to concrete. <br />Use provided plastic caps to plug all concrete anchoring bolt holes after they are fastened. <br />Concrete anchoring bolts must not be corroded or compromised and should be embedded adequately. <br />Follow your anchor bolt product manual or manufacturer's recommendations to install them properly. <br />A3 - Pre -plumb all product inlets and vapor recovery line with offsets and/or rigid pipe and elbows <br />as necessary. Adjust electrical conduits to line up with the new dispenser as necessary. <br />A4 - Position and bolt down the dispenser to the conversion frame with the anchor bolts provided. <br />lJ I I ' ' Im/ 101 W <br />Dispenser <br />Dispenser <br />Anchor Bolt <br />Concrete <br />Anchor <br />Plate — <br />Vdp <br />BRAVO BOX <br />e d � <br />" a 8 FOR OLD <br />4.. DISPENSER <br />II OVO FF ET II <br />OFFSET <br />Concrete Anchor <br />i Bolts <br />° 4 4A <br />° <br />Equipment shown is for <br />illustration purposes only <br />and is not a reference <br />for your layout within <br />the hydraulic cabinet <br />ii-CONV-82000-ConversionFrame-14A -8/20/2014 <br />