My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1901
>
2300 - Underground Storage Tank Program
>
PR0231092
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 4:19:40 PM
Creation date
6/23/2020 6:41:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231092
PE
2361
FACILITY_ID
FA0001946
FACILITY_NAME
El Dorado Food Mart
STREET_NUMBER
1901
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16508019
CURRENT_STATUS
01
SITE_LOCATION
1901 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231092_1901 S EL DORADO_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 <br />Ll <br />minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />Site map enclos�d? YES [ ] NO <br />Submit copies f ICC Service Technician and/or installer's certificate and all manufacturer training certificates for each <br />person instailin or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is availabl on the jobsite as required by Title 8. <br />Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showin 3 location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, I JDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as n(cessary for a timely plan review): <br />4-4 RS OAS <br />1901 u EL ODRPD'.t. <br />S;TOCKTON CP <br />;2/22/2016 12.29 PM <br />SUMP LEAK TES' <br />UDC 3-4 <br />TEST STARTED <br />12a ai� <br />,,ST STArR70 <br />12/22/'2016 <br />BEGIN ..EVE_ <br />6.3247 Ih' <br />END TT:Mr <br />12.29 PM <br />END DATE <br />12/22/Z316 <br />;7ND 'LEVE;- <br />6.5245 iN <br />LEAK THRESHOLD <br />0.102 IN <br />TcST RESULT <br />'2ASSED <br />List of equipme6t to be used (Attach manufacturer's specification sheets showing third -party approval): <br />zJr, <br />r i <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.