My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-1992
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2300 - Underground Storage Tank Program
>
PR0231094
>
COMPLIANCE INFO_1987-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2023 12:03:21 PM
Creation date
6/23/2020 6:42:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-1992
RECORD_ID
PR0231094
PE
2361
FACILITY_ID
FA0003632
FACILITY_NAME
AJS MINI MART INC
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
07935016
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231094_7906 N EL DORADO_1987-1992.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
495
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ii. GENERAL INFORMATION: <br />Obtain an EPA Site Number from the Department of Toxic Substances Control (800) 61 -TOXIC for temporary <br />hazardous waste removal activities associated with underground storage tank (UST) removals. <br />2. Disposal Information: Public Health Services Underground Storage Tank Disposition Tracking Record (UST <br />Tracking Record, page 10) shall accompany each tank removed from site. Tank(s) will be issued an identification <br />number which PHS-EHD's representative will note on the UST Tracking Record. Contractor will affix same <br />identification number onto tank end using fluorescent spray paint. Contaminated tanks and/or piping are to be <br />transported under Hazardous Waste Manifest by a state registered hazardous waste hauler. <br />3. Contractor to Provide: Combustible/Flammable gas detector (to verify the Lower Explosive Limit (LEL) <br />atmosphere and oxygen level of tank prior to lifting from excavation), adequate number(s) and appropriate type(s) <br />of fire extinguisher(s), barriers to secure the area as necessary to minimize traffic and pedestrian interference, and <br />fluorescent spray paint to affix tank identification numbers. It shall be the project manager's responsibility for <br />compliance with all health & safety regulations and requirements, which shall be strictly adhered to at all times <br />during the course of the closure activities. <br />4 The PHS-EHD permit shall be on site during tank excavation and removal. <br />5. Any changes in this document shall be approved by PHS-EHD prior to initiating work. <br />6. Closure -in -Place: If Closure -in -Place is the suggested method of abandonment, complete form <br />EH 23 039 and submit written approval from the local Fire Department. <br />Temporary Closure: If Temporary Closure is the suggested method of abandonment, complete <br />and submit this form and a written approval from the local Fire Department. <br />The following oc a do shall be submitted within 30 days of the tank removal date: <br />a) Analytical results, mailed directly from laboratory to PHS-EHD, including a chain of custody and quality <br />assurance and quality control (QA & QC). <br />b) UST Tracking Record Sheet(s) and/or Tank Hazardous Waste Manifest(s). <br />C) Tank Closure Certification Form (DTSC form 1249). <br />d) Hazardous Waste Manifests for piping, rinsate, residual fuel, or waste oil receipt. <br />e) Submit the backfill excavation certificate as required by San Joaquin County and the incorporated City <br />Building Departments. This report will be referred to the appropriate agency for their review. <br />A site which has had UST(s) removed, shall not be considered for final closure until the above items are <br />submitted for review. <br />III. SITE MITIGATION: <br />1. In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is the <br />responsibility of the owner or operator to submit a workplan to PHS-EHD Site Mitigation Unit prior to initiating <br />any assessment or remediation activities. To minimize delays, a Corrective Action Plan may be submitted <br />concurrent with tank closure or installation plans. Address one copy of the Corrective Action Plan to the Site <br />Mitigation Unit for review. For further assistance contact the Site Mitigation Unit at (209) 468-3450. <br />EH 23 046 (Revisedl0/19/98) Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.