My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-1992
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2300 - Underground Storage Tank Program
>
PR0231094
>
COMPLIANCE INFO_1987-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2023 12:03:21 PM
Creation date
6/23/2020 6:42:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-1992
RECORD_ID
PR0231094
PE
2361
FACILITY_ID
FA0003632
FACILITY_NAME
AJS MINI MART INC
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
07935016
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231094_7906 N EL DORADO_1987-1992.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
495
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Beni By: 7ai7 and Associates; <br />1. GENERAL <br />925 880 7878; <br />Mar -1 -99 6 <br />2r:M; <br />Page 2 <br />This Health and Safety Placa has been designed to conform to <br />and/or exceed guidande standards promulgated 'cy EPA- and the <br />California Department of Health Services, Federal OSHA <br />regulations (29CF70.1910.120) and CALiOSHA regulations. Because <br />considerable experienced judgement must be applied to decisions <br />that will be made while actually working on site, it is the goal <br />of this plan to provide maximum work efficiency while <br />maintaining an uncompromisingly sa=e working environment. This <br />plan is not a substitute for experienced judgement and <br />direction, or for common sense dur®ng construction activities. <br />Gettler-Ryan Inc., will provyde services and equipment for the <br />completion of the scope of work. Gettler-Ryan Inc., (as well as <br />all subcontractors and independent contractor) will adhere to <br />the Site Work Health and Safety Flan. <br />2. WORK OBJECTIVE <br />The overall work objective is to provide fcr proper and safe <br />completion of scope �f work. <br />3. SAFETY MANAGEMENT <br />The field supervisor, Jim, hich.o_s, is the site and safety <br />officer and will ensure that all personnel comply with all <br />
The URL can be used to link to this page
Your browser does not support the video tag.