Laserfiche WebLink
10/24/2005 MON 11:19 FA% 0 <br /> 1@002/002 <br /> We are going to pull-%UDC purge lines back, remove sheer valves, install new penetrations and <br /> termination boots, reinstall sheer valves, retest secondarys,purge lines,get a precision line test. <br /> This scope is pending there are no other leaks in lines or underground once this is done. If <br /> anything changes from the above, you will be notified at that time. <br /> Re hydro test disp.I/< <br /> Possibly the same scope of work for disp.5/6. <br /> Thank you <br /> Jason Smith <br /> Operations Manager <br /> Wayne Perry Inc.[N] <br /> 30 Main Ave. Suite 5 <br /> Sacramento Ca. 95838 <br /> Office:916-646-9680 <br /> Fax:916-646-9683 <br /> Ce11:916-834-5712 <br />