My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2300 - Underground Storage Tank Program
>
PR0231094
>
COMPLIANCE INFO_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2023 1:39:29 PM
Creation date
6/23/2020 6:42:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2009
RECORD_ID
PR0231094
PE
2361
FACILITY_ID
FA0003632
FACILITY_NAME
AJS MINI MART INC
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
07935016
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231094_7906 N EL DORADO_2008-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
421
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alk ; RF.VnNDARV P1IPF. T1FgTTNC. <br />Test Method Developed By: <br />Miping Manufacturer <br />Q Other (Sped) <br />® Industry Standarc7VQ <br />Professional Engineer <br />Test Method Used: <br />® Pressure <br />Q Other (Spec) <br />Q Vacuum <br />❑ Hydrostatic <br />Test Equipment Used: DIAL GAUGE <br />Equipment Resolution: d to 15" PSI <br />Piping <br />Piping <br />Piping Piping <br />Piping Material: <br />Lt <br />Fiberglass <br />Piping Manufacturer: <br />� <br />S"�-- <br />f <br />y <br />Piping Diameter: <br />S , f <br />3. <br />Length of Piping Run: <br />-2 v 0Feet 4 <br />Feet <br />,Q <br />Feet <br />Feet <br />Product Stored: <br />- 7 <br />_ <br />1lfethod and location. of <br />piping -run isolation: <br />Test Boot in Sump <br />Test Boot in Sump <br />Test Boot in Sump <br />Wait time between applying <br />pressure/vacuum/water and <br />startin test: <br />15 Minutes <br />15 Minutes <br />_ <br />15 Minutes <br />—_--_-- <br />- <br />Test Start Time: <br />Z • 3 c.,0 <br />Initial Reading (R,): <br />5 PSI T ~ — <br />5 PSI <br />5 PSI <br />5 PSI <br />Test End Time: <br />3 : 3 C, <br />T <br />' :3C > <br />_ <br />Final Reading (RF): <br />�5 PSI <br />PSI <br />PSI <br />PSI <br />Test Duration: <br />1 Hour <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (Rx-Rr): <br />PSI <br />66 PSI <br />PSI <br />PSI <br />Pass/Fail Threshold or <br />Criteria: <br />Zero <br />Zero <br />Zero <br />Zero <br />Comments — inchide information on re aril made priot to testing, and recommended follow -rt for ailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.