Laserfiche WebLink
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: Gaslo 7906 N EI Dorado Stockton 95210 <br /> . . . . . . . . . . . . <br /> . . . . . . . . . . . cas . . . . . . . . . . . . . . . . . . . . . . . <br /> 91 . TL F V <br /> TLS 350R--- . . P A <br /> M <br /> . . . . . . . . . . . . . . . . . . . . . M <br /> . . . . . . . . . . . . . . . . . . . . . E. <br /> . . . . . . . . . . . . . . . 87 Slave T F V R <br /> . . . . . . . . . . . . . . !1 <br /> X L. <br /> P <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A. <br /> 3 . . . . . . . . . . . .1 . . . . . . . . . . . . . . . . . . . . . N. <br /> . . . . . . . . . . . . . . . . E. <br /> . . . . . Snap Taps. . . . . . . . . . . . . . . . . . . )%v <br /> . . . . . 4 . . . . . . . . . . . . . . . . . . . . . . .87 Sypoon Pipe f�. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . X. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . x . . . . . . . . x . . . . . . . . . . . . . . . . . . . . . . <br /> 8 . . . . . . . . . . . .6 . . . . . . . . . . . . . . . . . . . <br /> TL F V A <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . X x P <br /> P <br /> KEY <br /> A=ANNULAR <br /> F=FILLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . *PIPING <br /> T=TURBINE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (ARROWS) <br /> P=PROBE Drawing of piping <br /> V=VAPOR exit of sump and <br /> X=SUMP SENSOR UDC's.No <br /> L=Leak Detector underground <br /> M=Manway -411.ftevr rm&rgrored thcr are nor eisible to Y)w eert6ing taehtidan o-s o drawing is <br /> B=Brine Sensor pokstwrvlop—onh,and—sda�fa- Drarrxg accurate,we <br /> I=Smart Sensor nmioscda cannot speculate <br /> S=STP blue prints. <br /> C=Floats&Chains <br /> E=E Stop r <br /> . . . . . . . . . . ELDORADO . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Date map was drawn03/28/18 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br />