Z3
<br />MATiAW. AND WORKINIANSHIP
<br />L UNLESS OTWMM SPECIFICALLY #01111D N THESE DOC ME NT& ALL
<br />BOUIPPIENT MATERIAL AND AR tCLOi INCORPORATED N THE WOR,
<br />COVERED BY TESE DOCUMENTS AM TO BE NIBU ATO OF THE MOST SUITABLE
<br />GRACE FOR TTME PROCESS INTENC20.
<br />2. THE CONTRACTOR SHAT IBURNISH To THE AGEINT FOR H6
<br />APPROVAL "IJAIE OF TE MANUPACTURSK THE MODEL NUMINM AND
<br />OTHER IDENTIFY11,13, DATA AND INFORMATION RZSFUCIIIO THE
<br />CAPABL.TTY. NATURE , AND RATING OF THE MACHINERY AND
<br />MECHANICAL. AND OTHER 5511IP1'1BR WHK3H THE CONTRACTOR CMINPIPLATES
<br />114001111 -ORATING, N THE WORK WEEN WAIGIU1111120 BY THE OWN=R* AGSIT.
<br />3. U404 MMWAIM> BY THOSE DOCUM04M OR U44 N CALLED FOR BY THE
<br />OUNINTS AGENT, THE CONTRACTOR SHALL FURNISH ?OA AGSM FOR
<br />APPROVAL PULL INFORMATION CONCERNING THE MATERIAL OR ARTICLES
<br />UHCH HE CONTEMPLATES NDOA°ORATINO N THE U O K. UbW SO
<br />DIRECTED, SAMPLES MAY BE OUSIP111711110 FOR APPROVAL AT TF*
<br />CONTRACTOR'S WOMOMW WITH ALL PREPAID.
<br />4. MACHINERY, EdlUIPMENT, MATERIAL, AND ARTICLES NSTALLED OR USED
<br />WITHOUT RECAUIlOD AJTR7/AL SHALL BE AT THE RISK OF SIASECLIE NT
<br />5. ALL WORK TO oX DONE N ACCORDANCE WITH APPLICABLE COON$ AND
<br />REGULATIONS.
<br />6. ALL MATERIALS SHALL GE INSTALLED PER PIAHUFACTURER* MTRCTIOS
<br />AM THESE OCCU1119476. CONFLICTS SMALL 00 BROUGHT TO THE ATTENTION
<br />OF THE OUTER* "ll'am
<br />1. P ANY OF THEM DOCUMENTS INDICATE A CONLICT WITH THE STATE OR
<br />LOCAL ROMPARIENTS AS ARE CURRENTLY N BTECT AT THE TIME OF THIS
<br />T S MIMCTED THAT THE MOOT RESTRICTIVE CODITIOYS)
<br />WAD APPLY.
<br />L CONTRACTOR EMPLOYEES TO HAVE COMPIJITIND 40 HOURS OSHA TRANM
<br />COJM PRIOR TO THE START OF WRC CERTIFICATION OF THIS MAST IX
<br />TO ?HE CUM" ENGINEER PRIOR TO THE START CP LOW
<br />2. CONTRACTOR EMPLOYEES TO HAVE COMPUIFIND THA PIPlING MANUFACTURE"
<br />TRAINING F484XUFRMIDM N ACCORDANCE WITH 1844 CALFORNA LST
<br />REGULATIONS . CEMPICAIM SMALL. OR PROVIDED TO OU NWIL
<br />CONTRACTOR SHALL COMPLETE THE PIPING INSTALLATION CHlCKLST
<br />SUPPLIED PIPING MAMrACTUESR ANO SHALL A58NIS14 THE CHECKLIST TO
<br />OUNIM
<br />3. CONTRACTOR TO HAVE BEEN TRAINED AND CSRrrZD BY THE TANK
<br />"WAr-nMM N CORRECT TANK INSTALLATION N ACCOmANCO MTN 1954
<br />CALW'OWA LST RE4HLATIOS. TES SHALL RX PROVIDED TO
<br />OR SHALL COMPLETE THE TANG INSTALLATION CHECKLIST
<br />SUPPLIED TANK MANUFAC'4A UEl! A0 $HALL FURNSH THE CHECCLST TO
<br />CuNm
<br />4. CONTRACTOR TO DEVELOP A SPECIFIC 617E SAFETY PLAN FOR TANK
<br />REMOVAL AND TANK WTALLAMN PRIOR TO THE START OF W RK.
<br />CONTRACTOR WILL CONDUCT Y919CLY JOD GRE SAFETY MEETINGS WITH ITS
<br />E'FLMMO ANO THE MEETING MHz" UULL BE SUPPLIED TO cuam
<br />5. CONTRACTOR SHALT. HAVE THE FOLLOWNM LIC21,0E6,
<br />A GENERAL W430MMM'A'
<br />B MAZARDOUS MATERIAL LNESTANTE HAMOLNG (RAZ•)
<br />6. CONTRACTOR $HALL HAVE THE FOLLOWING Imo. CONTRACTOR SHALL
<br />HAVE PROOF OP SUCH INSURANCE OI IRLE WITW OWER BY NAMING OAR
<br />A6 'ADDITION_ L
<br />A STATUTORY LIABILITY
<br />IL COMPREHENSIVE GENERAL LASLITY, WITH A COMBINED SMAX
<br />LIMIT OF NOT LESS ROAN A3/D00AOo PER OccuRfamcs FOR ODDLY
<br />NNUCY AND PROPERTY DA IAM
<br />G ALTCMOSILE LIABILITY COVERING UDE OF ALL OWED WSW
<br />VEMICLE6 WITH A CCIMISINPID SINGLE LMT OF SINGLE WIT OF LIABLITY
<br />OF NOT LESS THAN WOO~ PER OCCURRENCE FOR BODLY INJURY AND
<br />PROPERTY DAMAGE:..
<br />1GENERAL CONTRACTOR TO PARNIGH A" LABOR, MATERIAL, RGIUIPMENT. AND
<br />SERVICES, NECESSARY FOR OR 1111546CHASLY 11,400ENTAL TO ?HE
<br />SATISFACTORY COMPLETION OF ALL LOW SHOWN ON. CALLED POR opt
<br />REQUIRED BY THE
<br />6.
<br />ALL WORK SMALL ES FSPWORPEP N ACCORDANCE WITH THE UNIFORM
<br />BUILDING CODE, UNIFOW FIRE CODE, NATIONAL ELECTRICAL CSE.
<br />CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS, OSHA
<br />CONSTRUCTION SAFETY ORDERS,, ANO ANY OTHER APPLICABLE STATE, CITY,
<br />OR COUNTY ORD
<br />4 P40WIM TORE SECURED BY OUTER AND SUPPLED TO CONTRACTOR
<br />OCNTRACT011% S FOR COMPLYING WITH ALL PERMIT
<br />CONDITIONS
<br />m GENERAL OMTRACTOR SMALL VST GTE A0 FAMILIARIZE WIPO P OF
<br />ALL BASTING PRIOR TO SUMMITTING HSE BD,.
<br />IL GENERAL CONTRACTOR SHALL PROTECT ALL 111)GSTNG FACILITIES TO
<br />REMAIN UNLESS NOTED OTHININIM CONTRACTOR SMALL REPAIR OR
<br />REPLACE TO THE SATISFACTION OF THE CUMMS PMPMSEWArNg ANY
<br />EXISTING FACILITIES THAT ARE DAMAGED BY THE CONTRACTOR'S
<br />OPE6RATION &
<br />E. ASL 07CAVATI" SMALL CE PERFORMED N COMPLIANCE WITH OSHA A0
<br />STATE INIQUILATIONS, THE CONTRACTORS PEFSPUMD TO THA 061"
<br />BOOKLET, WCAVATNM APD TRENCHING OPWMTICW, FOR A GAPS WOW
<br />FRACTIONS GLIDE FOR PINIPORMING IDCAVATIC4 WORK
<br />m UPON CavumCH OF PRM= CONTRACTOR SMALL PROVIDE OGSE4 WITH
<br />'AS B1Ar PRANINGS OF ALL TURAS INSTALLED FAY SAME. "AS OftI °
<br />SMALL GE COMPLETED ON -WE MTH INFORMATION NOW DIRECTLY ON
<br />AFPPWVW JOB COPT.
<br />14. CONTRACTOR SHALL PROVIDE A LST Q ORS, P ANY WHO
<br />LILL ISE USED ON ?HE PROJECT.
<br />S. CONTRACTOR SMALL COORDINATE ALL &O PECTiOS AD ,APPROVALS AD
<br />OSTAI , AT THE COMPLETION OF Ti PROJEC7, ALL TES
<br />REQUIRE> TO RUN THE RAGOUT''.
<br />S.GOYORNING CODES APO STANDARDS INCLUDE, BUT SMALL NOT CE LP11120
<br />TO, THE STANDARDS OF INE
<br />NATIONAL 67ANDAMO INSTITUTE (ANSI)
<br />AMMAN PETROLEUM INSTITUTE (API)
<br />AMERCAI SOCIETY POR TESTING AO PSA (ASTON
<br />UNIFORM 00011 (UNC)
<br />NATIONAL SURCTRIC CODE (NNW
<br />NATIONAL qE 101110111ICTICH AGENCY (NFPA)
<br />LA80RATORM, IC. AL)
<br />CALIFORNIA CODE OF REGULATIONS (CCFV
<br />LOCAL ORDNACM
<br />n. 6AiPETY PLAN. OR SMALL DEVELOP AND MANLAN FOR THE
<br />DURATION a A SITE HEALTH A &AIR IY PLAN THAT WILL
<br />EFFECTIVELY 1111 ATO i j%m E+NT RECUMD &AFE'TY PROVISIONS.
<br />ATO,
<br />A. APPOINT .AND EMPLOYEE AS THE SAFETY OFFICER 040 S 0 A.PIND
<br />AND AUTHOPMED TO SUPlEQvIbN AND INPQRCE COMPLIANCE WITH THE
<br />HEALTH AID SAFETY PLAN. $"" TOA MAPS AID ®LDL. TION OF
<br />THE SAFETY OFFICER TO TA AGENT PRIOR TO CdMFEECNG IIIOW
<br />ON THE SITE
<br />19, THE PLAN SMALL CONTAIN THE NAMES. ADDRESSES AND
<br />NUMBERS OF THETHE HOSPITAL FACILITIES
<br />THE SITE. A0 A MAP TO THHA OSPHOSPITALITAL PROCEPURS6 SHALL BE
<br />WRITTEN N THE PLAN FOR ACTIONS TO BE TAJCJ94 SHOULD STRANGE ODORS
<br />OR 4AZARDOUS SUBSTANCES BE UNCOVERED.
<br />C. P, DURING, THE COURSE OF THE WORK, UNSAFE COMM" DEVELOP
<br />OR ARE ENCOUNTERED, TAKE IMMEDIATE MEASURES TO DORRECT THE
<br />COOTIOR P THE CORRECTNC ACTIONS INSUPPICIENT N THE
<br />OPINION OF THE OIU4ffftS AGENT, C C STR UCTICN WORK SHALL CEASE WTL
<br />COMIRECTIVE ACTIN CAN b IMPLEMENTED.
<br />D, PROVIDE A MINIMUM OF TWO FIRE EX114MIONEWS RUTH A MINIMUM
<br />CLASS RATING OF 2 -A20 -INC WTNM SO FEET CP THE OPMATI1
<br />S. SERVICE ALERT MLAO) - THE CONTRACTOR SHALL NOTIFY
<br />OF USA 2 RLL YORICA43 DAYS IN ADVANCE OF PINIVIORMING
<br />ANY W,=AVATION WORK SY CALLING THE TOLL-FREE OE -CALL PROGRAM
<br />NUMBER (SOO) 6424441,
<br />PKTROLNN WORK SCOPE
<br />L PRIOR TO THE START OF WORK; PROVIDE OWNER WITH WOW PLAN AND
<br />SCHEDULE THAT ALLOttl THE 6110* STORE TO REMAIN OPEN TO THE
<br />FULLEST EXTENT P006FOM
<br />2. FENCE OR WORK AREA WITH 6' HIGH CHAIN LINK FENCE. POST 'TMEP
<br />OUT• 61ONS ON PENCE 21,2W 30 PONT. AT THE END OF EACH UPOW DAY
<br />SECS FENCING PANELS TOGETHER
<br />L PLUBM, OUT, AO W40I.S PRODUCT LIES PROM EXISTING TANKS TO
<br />ISLANDS.
<br />4. REMOVE ALL E>46111N3 RPE,. DISPENSM ISLANDS, ISARRICAMS, REL
<br />LINE, CA14OPY ASPHALT AND CONCRETE SURFACES AS REOMIRED, N
<br />PI�ARATIM FOR INSTALLATION OF NEE AS SHOWN ON DIRA110,126, ANY
<br />SALVAGRAELS OSIUIPPENT TORE REMOVED FROM SITE AS DIRECTED SY
<br />MINER REPRESENTATIVE
<br />5. PREPARE FOR REMOVAL AND R110401& TWO L0000 GALLON UNDERGROUND
<br />(GASMNE) STORAGE TANKS (NST0 N ACCORDANCE WITH THE
<br />UNDERGROUND TAMC CLOSURE PLAL OWNER WLL EMPTY TANKS OF
<br />PRODUCT. GEMft& CONTRACTOR TO FTOVIDE FOR DRY ICE TO
<br />PURGE TASKS, OUT NO LIE" THAN B LBS PER ~ GALLONS CAPACITY,
<br />6. CONTRACTOR SMALL PROVIDE POR CLEANING AS
<br />TRANSPORTATION. DISPOSAL OF TANK, AND RNN ACCORDANCE CCORDAN CE I ER
<br />COUNTY REGULATES, BY APPROVED HALIM CUTTING TANKS ON SITE S
<br />NOT MIR ALLOWED.
<br />1 OEHOR WILL CONTRACT WITH AND FURNISH COI ULTANTS TO PEPWOP91 SOL
<br />AND/OR WATER TESTING UPON TAMC A P1PNG REMOVAL. N ACCORDANCE
<br />WITH TANK CLOSURE PLAN AND LOCAL REGULATIONS, (ALLOW Ti14NTY-FOUR
<br />HOURS FOR RESULTS OF SOL SAMPLES
<br />S CONTRACTOR SMALL PLACE OXGAVATED SOL ON AND SHALL COVER WITH 4
<br />MIL PLASTIC UNTIL SOL 16 REMIOVED. SOL TO GE STOCIQML90 ON
<br />5110 FOR SAMPLIKJ PRIOR TO OFF -HAUL BY OTHERS AS DIRECTED BY
<br />OWI!
<br />S OWER SHALL PROVES FOR TRANSPORTATION AND DISPOSAL OF ALL
<br />=XCAVATED SOH. AFTER OF ANY NECESSARY FOR EDIATONL
<br />INCLUDINS AERATION.
<br />D P IMBOAPtW, BACKFILL THA ABANDONED TANK HO.= ONG'E ALL SAMFLNG
<br />A0/0It OVER EXCAVATION IS COMPLETEDWAM97LL MUST GE ENGINEERED
<br />FILL CCMIPACTED TO SM. THE CONTRACTOR S RESPONSIBLE FOR
<br />CERTIFYING, THE COMPACTION, A THIRD PARTY ENGINEER MAY WITNESS
<br />THE PROCESS AND CERTPY THAT THA HOLE WAS COMPACTED PROPERLY TO
<br />W11HN 4 FIST OF SURFACE. ONE (U TEST UM.L THEN BE... 0102AED AT
<br />4' AD 2' AND O', FOR =A.TOTAL OF IWW 0) COMPACTfON TESTS.
<br />PROVEN RESULTS TO OIFER* ATh2.
<br />IL CONTRACTOR TO INSTALL HEST CANOPY FOOTINGS PER PLANS,
<br />TICS, AND SHOP 01111410420 AND ARRANGE FOR ALL
<br />IBPEGTIOS. PMO)VIDE CONDUITS FOR LIGHTING AND INTERCOM. AND
<br />COORDINATE RAIN LEADERS AS NECESSARY.
<br />D. CONTRACTOR SMALL PLACE SOL FROM FOOTING 0XG4VATION Cly AND SHALL
<br />COVER NTN, 4 ML. PLASTIC IML SOLS RNMOlW SOL TO RE
<br />STOCKPILED AND SBGVMnATM ON SM FOR SAMPLING PRIOR To OP -HAUL
<br />BY OTHERS A6 DIRECTED BY OWNEC
<br />S. CONTRACTOR TO OCHROULS APD ARRANGE CANOPY WORtlG PER DRAWINOSAND
<br />SPECIFICATIONS CONTRACTOR SHOULD RE PRESENT TO COORIDIMAIE
<br />ELECTRICAL.
<br />K EXCAVATE AS NECESSARY FOR THE INSTALLATION OF REPLACEPIENT TANKS.
<br />S. CONTRACTOR SHALL COVER EXCAVATED SOL LTH 4 ME_ PLASM UNTL
<br />SOLS REMOVED. SOU. TO M ST AND SEGREGATED ON SITE
<br />FOR 6AMPLNG PRIOR TO OP -MAUL AS 0PIffClSD BY
<br />16. INSTALL °IYPAN FILTER PAINUC LI@R N TANK MOLE AND TRENCHES, PER
<br />BY WET-NCLO CO NDITIORL PROVIDE TANK
<br />HOLD -BOWS A6 FAMISH> BY MANUFACTUPSIR N U IT4 0M CONDITIONS.
<br />M INSTALL 2 - 12000 GALLON TANGS PER ONAWINGS AD CURRENT
<br />MANUFACTURE" INW1711UMMA UNION SMALL 10 POLLOUIC, AT ALL
<br />TREES, A0 SHA" HAR PRECEDENCE OVER OTHER
<br />144NJKACTUPSM CHECKLISTS SMALL w COMPLETED BY THE CO{TIRACTOR
<br />AS EACH STEPS COMPLETED. TANG !=COMM AND M40WILL TO 00 PW
<br />GRAVE-. LUNG JURY S TO ULE MINIMUM 4 ROT, TAMC COMING S TO IDE
<br />A MUM" NT, SPACING INITUMN TAW S TO RE A MNIAM OF W.
<br />?AMC INTEGRITY TESTING SHALL CONFORM TO MUNFR',
<br />S. NSTALLN. 56111AIPMENT AS LISTED N RGIUVIIIINT LST INCLUDING
<br />SALVAGEABLE TO BE REINSTALLED, P ANY; PROVIDE AD
<br />INSTALL ALL OTHER SCAUFMIM AS REMIXED TO PROVIDE A COMPLETE
<br />PETROLEUM SYSTEM
<br />16. PROVIDE AND INSTALL NREM PTRODUG4, VEN1', VAPOR AD SECCN CI ARY
<br />CONTAINMENT LINES FOR
<br />NSTRHCTION& OVER AT ALLMM, AD 6 4
<br />PRINCEDOM=710A CHECKLISTS,
<br />SMALL ON COP14JFW DY THE CONTRACTOR AS EACH STEP N COMPLETED.
<br />A. 1PRMICT PPNM. 2• M44W PIPING WITH 3• GOT
<br />SYSTEM AS BY ALL P ATO COT SY$TDMS
<br />SHAH. OR UL FOR NWX METHANOL. CONT SYSTEM SMALL
<br />BE BY TAR $AME MMARACnNMK LTN THE $APSE ONtM ADHESIVES
<br />APDL FITTING&
<br />IN VZNTNAPOR PIPING. FMD THREAD IIA AND RED THREAD 11 WIT4
<br />PITTP106 AND 1000 AO 8000 OR AM IRCH OUALOY
<br />WITH ALCOHOL FITTINGS AND RP46 AD:ESIVL DO NOT MIX
<br />MANF MA
<br />G PERSONS INSTALLING PIPING MST IX CENTRED AS HAVING SM
<br />TRAINBP BY
<br />D, 57011 PIPE. ALL METAL PMP°ND SHALL GE CLACK IRON 5CA41ECULS
<br />40, OR EXTRA STRONG. "VAANi$D PIPE 16 NOT .LLLOWD. FITTINGS
<br />SHAD. ES 900 PIN MA.Li,ABLE INCH.
<br />0, ALL 6400E PIPE BELOW GRADE 16 TO PIX DOUBLE MAPPED WITH 20
<br />MIL PVC PIPE WRAP. OVER A PPE MAP PRIMER FOR USE WITH VBNYL
<br />TAPM AND SMALL RE BY THE SAME MANUFACTURER AS THE WRAP.
<br />IN ALL THREADED COAECTI" SHALL BE THREADED UUTM SEALANT
<br />W04 SHALL RE CURRENTLY U1141011ANIND BY MAU4FACTWMM FOR IRLL
<br />COMPATIBLLITY WITH THE PIPING MATERIAL USED, AND FOUR WE W TN
<br />PETAMAIM SOLVENTS REL6, OLS. DEWJ- AND 100% METHANOL. UMICH
<br />SHALL RE VERIFIED BY CUNT P~ACTURVW6 PRODUCT DATA SHEET.
<br />G. GG SMALL DEMONSTRATE TO COSI M6 REPRESENTATIVE T44AT ALL
<br />MATERIALS AUX MSW AND CONFORM TO ADOVE SPECIFICATIONS.
<br />20. DO NOT PLACE PRODUCT PIPING UNDER BULODM PIPING RIMING OVER
<br />TA" SHALL BE MINIMIZED MAINTAIN MINIPIUPI CLEARANCE AS SHONIN CN
<br />DRAUNGG MINIMIZE CROSSING OTHER LIES AND CONDUIT. P PIPING
<br />S NOT SHOWN OI SM PLAN, 6C, SMALL RN LITS THE MOST DIRECT
<br />ROUT.' SA,lCCT TO APPROVAL BY Owe" ROPRINIENTATIVE
<br />21. EXISTING VENT MOM AIX SHOWN ON SITE PLAN INSTALL NOW SUINKr
<br />JOINTS AT BOTTOM OF VENT
<br />22 PrW &Y&TENS SMALL RE TESTED PER CURRENT MANUFACTURER'S
<br />INSTRUCTIONS SMALL RE FOLLOSED AT ALL TIMES, AND SHALL HAVE
<br />OVER OTHER ISTRUCTIO &
<br />A, AC. TO NOTIFY OUTER* REPRESENTATIVE TWD WORKING, DAYS PR ICR
<br />TO LIE TESTIJ4, ClUNIM REPRESENTATIVE SHALL tlUTNE66 ALL LINE
<br />TESTNG. MAW T56T PREMIUM& ON GAUGE WITH ELECTRICAL TAF41 AT
<br />SNOWING OF ?0846. PRESSURE SMALL HOLD FOR AT LEAST ONE (V
<br />HO R AND BE UJITHESSED BY OUNIM S REPRESENTATIVE DO NOT BACKFILL
<br />TRANCHIIS WTL AUTHORIZED BY OUTER'® POP442eo4rATPlL
<br />S. LEST PRESSURES SHALL OR,
<br />2° - 60 PS AND APPLY SOAP SOLUTION,
<br />8' • 40 PSI APO APPLY SOAP SOLUTIO.
<br />9' -GWCICAWr - 5 PSI AND APPLY SOAP GO.UTIOL
<br />C. CAUTION, DISCONNECT FLEX CONNECTOR FROM SPP AND CAP PRIOR
<br />TO 7E5TNG. APPLY 4 RELEASE PRINeURE SLONLY. VBNTNAPOR SYSTEM
<br />64" ES TESTED FIRM TOP O VENT, THROUGH MANIFOLDS), CQ'RACTOR
<br />BASE 40 PUNK STAGE 1 CCNTANMENT MANOLES, STAGE 11 VAPOR
<br />LNIN, t0 NILAN06 AND STAGE It FLEX COIECTOR6 At S).
<br />D. SLOULY PRESSURIZE PRODUCT LINKS AND VENTNAPOR SYSTEM TO 60
<br />PSL SOAP ENTIRE PPffi SURFACES RNCLIONG JOINTS AND FITTINGS
<br />CORRECT ANY LEAKS AND RETEST.
<br />L SLORLY IffiEVE PRESSURE FROM VAPORAIM SYSTEM APO REMOVE
<br />PLUG PROM EACH EXTRACTOR AFTER TEST. REDUCE PRODUCT LINE
<br />PRESSURE TO 6 PSI. MONITOR DAILY UNTIL ALL YARD PAVING 16
<br />C'OMPLLRE.
<br />P. WOGODARY PPE MST BE PF40PORLY OUT INSPECT ALL PRIMARY
<br />PPE 6. PRESSURIZE SECONDARY PIPE TO 5 PSH AND SOAP ALL
<br />PIPE SURFACE AND FITTI NG& PRONNIRE ON THE PIPING SECONDARY
<br />SPACE SHALL 00 MAMA W UNTIL AFTER THE PAYING 18 N PLACE OVER
<br />I" PEED APD PIPING RN6, AND SHALL BE SY THE
<br />FOUNPABSIWATPAL
<br />G. AFRI 00NG WITNESSED BY OUTER* REPREOINTATNE, REMOVE
<br />PREMIUMS HT6w PRODUCT LINES AND AUR FROM SEOOOARY LINES AFTER
<br />PAVING 18 N PLACE
<br />23. GAG SMALL PERFORM PRECSON TEST ON PRODUCT LSE& AFTER PAVING
<br />10 COPPLETS AND PRIOR TO FINAL PROJECT ACCEPTANCE. PRECISIM
<br />LUNE TEST SMALL REN ACCORDANCE WITH MPA 32% LOCA.
<br />OR APPMNED EOUA.. TEST SHALL GE CONDUCTED BY A
<br />CERTIFIED TESTER G.C. SEAL" PWADS UIRITTBN IMPORT OF PREC16M
<br />TEST TO OUR" REPRESENTATIVE PRIOR TO OMNER* ACCEPTANCE OF
<br />24. CONTRACTOR SHALL PROVIDE DOCUMENTATION OF A DYRWOC
<br />TEST OF ALL VAPOR RETURN LINES A5 INEC U RED BY LOCAL ROMYAT1CN8.
<br />25. CONTRACTOR SHALL DO ANY OTHER TROTNG AS REQUIRED BY LOCAL
<br />REGULATIONS,.
<br />26. CCaSTRUCT NEW RBI. ISLANDS AS SHOWN ON
<br />2'L MAY* 00>26 TURBINE SUPS, AND OVERFILL 00>26 ARE TO 00
<br />COMPLETELY SEALED AND WATER TESTED. AS BVIC0400 BY OUNIMS
<br />REPRESENTATIVE AS FOLLOM
<br />L ILL WIN WATER TO HIGHEST PENETRATION.
<br />2. WRRAY PANT TOP OF IVATIM
<br />iO PROVEN AND INSTALL CONDUIT ! WIRING FOR PETROLEUM SYSTEMS) TO
<br />CANOPY LIGHTINCk PROVIDE CONDUIT FOR FUTURE CARDREADERS A0
<br />OhIGE SITE ELECTRICAL A6 INDICATED ON THE
<br />2s ALL GOPDUTT S TO RE 8/41 RU60 CONDUIT.
<br />30 DWAL MONITORING; SYSTEM LTH HYDROSTATIC PROBES. TUIRISINS SUMP
<br />AND ?ANK QAAUGIL AND MONITOR C4WR OL. PANEL N BUILDING PER
<br />3L INSTALL NEW GLDAPICO MPD', SINGLE -HOSE AD CONSOLE
<br />AS NPICAMP ON SIE PLAN AND DRSCFtMW N THE S WPP IO NT LST.
<br />32. WALL SITE LIGHTING AO ANY OTHER ITEMS AN SOWN ON THE
<br />33. INSTALL NREM CONCRETE TANG AND ERNE S.A06 ANO OTHER CONCRETE A$
<br />INDICATED 04 SITE PLAN, CONCRETE SCALL HAVE A MNIIM
<br />CCWPRMM STRENGTH AT 20 DAYS OF 2600 PS. CCNCI@TE SMALL
<br />CONTAIN 5 POUNDS OF LAMPOLACK PER CUBIC YARD - USE DAVIS 6064.
<br />34, REPAIR A NDIM REPLACE AC. PAVNM AND DARE TO MATCH ORWIAL N
<br />ARBAb 010ftPMMP BY WORD
<br />30. ANY WVPIONMNNTAL WORD REQUIRED OUNINDS TNA AD" SCOPE OF WORD
<br />6441 RISE DONE ON A TIME A0 MATERIALS DASb RENTAL ReCNGFT6,
<br />OR INVOICE, MATERIAL AND DAILY LABOR TIME
<br />SMMM STALL R 0110AND TO SUPPORT G TIROL CONTRACTOR TIME A0
<br />MATENAL INVOICE& SUCH WOW SMALL !11 OLLE D SEPARATELY.
<br />2.0 CLOGUX -REMOVAL OF TANKS
<br />SAN JOAO UIN COUNTY CEPARPfMENT OF ENV ALL FWAOURCES TANG
<br />CLOSURE GUIDELINES 40 SOL AND GROUNDWATER SAMPLING
<br />GUIDELINES SHALL GE POLLOSEDM EST WHERE THE POLLOURHG
<br />SPROVICAT1O18 ARE MOIRE RESTRICTIVE
<br />ROMPYN ALL PRODUCT FROM TANKS.
<br />ALL RESIDUAL LICIM, SOLIDS, OR SUDGM
<br />PIS ALL VAPORS FROM TANKS WITH A MINIMUM OF THIRTY (90)
<br />PONOS OF SOLID CAmDCN DOXOE (DRY I= FOR RAC14 1000 &ALL"
<br />OF TANK CAPACITY AND PRESENT SALES SLIPS TO 19Pf=tOR
<br />PELLSTIZIND DRY ICE S RECOMMIINDED CAP ALL OPENINGS EXCEPT
<br />VENT PIPE AND ALLOW RUO HOUR MI IPUPI ANO SIC HOUR MAXIMUM FOR
<br />OXYGEN DISPLACEMENT AFTER PUTTING CAROM DOXDE INTO THE
<br />TANKS VENT PIPE OPINING, TO BE 0MCKED LTH A CCAEUOTBLE GAS
<br />DETECTOR TO DETERMINE P TANK 16 VAPOR FREE OR P ADDITIONAL
<br />DRY ICE AND/OR TIME MAY BE RECURRED.
<br />PLUG OR CAP ALL TANK OPENI MS LEAVING AN V8° - V4' PRESSURE
<br />REEF HOLE NONE CAP AT THE TOP OF THE TANG
<br />VISUALLY INSPECT THE TAMC$ UPON REMOVAL. ALL EXTERNAL TASK
<br />SURFACES AND PITTINGS SMALL BE INSPECTED FOR EVIDENCE OF HOLES
<br />OR LEAKAGE. THE RESULTS OF SUCii INSPECTION SMALL BE
<br />DOCUMENTED N IUNTNG, WITH PUMCGRAPHS ATE.
<br />PATCH ANY HOLES UT14 APPROVED MATERIAL BEFORE TRANSPORTING
<br />TANKS TO DISPOSAL SITE.
<br />TWO SOL SAMPLES SMALL RE ANALYZED FROM BENEATH THE TANG ONE
<br />�.
<br />MOM DIRECTLY OO EATH THE FILL PIPE. THE OTHER FROM A SIMILAR
<br />POSITION AT THE OPPOSITE END OF THE TANK P OBVIOUSLY STALED
<br />OR CONTAMINATED AREAS 6'XST N LOCATIONS OTHER THAN THE ABOVE
<br />LoCATcHo, THEN ADDITIONAL. SOL SAMPLES SHALL RE AAI.117ED FROM
<br />THESE OBYOUSI.Y STAINED OR CONTAMINATED AREAS
<br />&OL SAMPLES SHALL GE COLLECTED FROM THE NATIVE SOW. AT OR
<br />JUST ISELCYN THE INTERFACE OF THE 0Ap4LL VTM THE NATIVE SOL
<br />SAMPLES SHALL BE TAKEN USING A DRIVEN -TUBE TYPE SAMPLER,
<br />CAPPED AND SCALED WITH INERT MATERIALS, FORMAL, D CHAIN -
<br />OP -CUSTODY RECORDS SHALL BE MAWA94M FOR EACH 6A1-PL.E AND
<br />&UBMITTOD LTH THE RESULTS TO THE R IUMATNG AGO4CY.
<br />TO Em PEDTE TFE PROCESS OF TANG IEM OVAL, THE FOLLCM2
<br />ALTERNATIVE SAMPLING METHOD MAY GE USED -
<br />A. IMMEDIATELY UPON REMOVAL OF THE TAM A BACK BUCKET OF
<br />NATIVE SOU. SMALL RE TAKEN FROM THE NATIVE SCOL TWD (2) FRET
<br />BEAN THE SOUBAtKFILL INTERFACE . THIS SOL SMALL GE RAPDLY
<br />BROUGHT TO THE SURFACE.
<br />5 APPROxIMAINLY THM INCHES SHALL BE RAPIDLY SCRAPED AWAY
<br />FROM THE SURFACE OF THS SOL. THEN A CLEAN AMASS I (AT
<br />LEAST THr1EE ">NO LONG) SHALL ON DRIVEN INTO THE SOL WITH A
<br />SUITABLE INSTRUMENT (WOODEN MALLET, ETC,J
<br />C. THE BIDS OF CRA66 TIME SHALL BE C42YORED WITH ALUMINUM FOL,
<br />THEN PLASTIC 00 CAPE AND SLY WRAPPED WITH A SWA15LZ
<br />TAPE.
<br />D. THE SAMPLE SHALL RE IMMEDIATELY PLACED 04 ICS, OR ORT CK,
<br />FOR TRANSPORT TO A LABORATORY. ACME FORMAL CHAIN-OF-CU6T�Y
<br />SHALL BE MAINTAINED AND SUBMITTED FOR EACH SURE.
<br />IF THE BOTTOM OF THE TAMC S SELO) THE TER TABLE, THEIN
<br />SOIL SAMPLES ARE NOT 140GWUIBO. N TNS CASE, A WATER SAMPLE
<br />SMALL LSE COLLECTED AS SOON AD 10086I1B-E PROM THE SURFACE OF
<br />THE GROU DUTATER N THE EXCAVATION. A CHECK SMALL INITIALLY BE
<br />MADE FOR ANY FM FLOATING PRODUCT. IF NO FLOATING PRROGICT IS
<br />DETECTED. T:SEd A WATER SAMPLE SMALL M TAKEN WITH A DEVICE
<br />DESIGNED TO REDUCE THE LOW CP VOLATILE COMMCIIIIIINTS A SAILER
<br />S A SUITABLE &APPLING DEVICE. THA WATER SAMPLE SMALL BE
<br />TELY POURS INTO A VOLATILE ORGANIC ANALYSIS (VOA) VIAL
<br />WITH AS LITTLE AGITATION AS POSSIBLE A TEFLON SMALL LSE
<br />USED TO 80AL THIS VIAL.
<br />SOL AND WATER GAPIPLES, SHALL RE ANALYZED FOR TOTAL
<br />WYOROCARSONS BY TIME METHODS OUTLINED N 'UWUDE.NES FOR
<br />ADDRESSING FUEL. LEAK&. CALIFORNIA REGIONAL V)AMt Gt1ALIT'Y
<br />CONTROL BOARD, 5414 FRANCISCO BAY ROOM - SEPTEMBER MOW
<br />LOAD TANKS ON MIGNIIAY CARRIER WITH PRESSURE RELIEF MOLE UIP ON
<br />SAME DAY AS REMOVAL. UNLESS THE TAW HAVE BERM TRIPLE MIND,
<br />THE CARXllOt MAST SE A LICENSED U14$9E HAULER AND MANIFESTS
<br />MUST ACCOMPANY THE TANKS.
<br />30 REMOVAL OF PIPING
<br />PIING TORE REMOVED SMALL RE EMPTIED OF ALL CONTENTS PF40N 40
<br />REMOVAL "IG, MAA. 06 STOCKPILED ON -STN PRIOR TO DISPOSAL
<br />VISUALLY ASPECT PPE TENCH POR INDICATION OF LEAKAGE. A 606
<br />SAMPLE SMALL EU TAKEN A0 ANALYZED FOR EACM TWENTY LINEAL
<br />PEST OF TRENCH P INSPECTION OF TRENCH MYRALS BVIDINCE OF
<br />LSAKAGL PLOW PROCEDURE LISTED N SECTION 2U FOR OAMPI.IdG
<br />AND ANALYSIS.
<br />IMIK _ •
<br />a 39
<br />2288 E. FREMONT ST.
<br />STOCKTON, CA 95205
<br />(209) 464-1038
<br />SAN JOAQUIN COUNTY
<br />APN 6141-214-03
<br />Ul nLTON
<br />wwE NGINMMG, INC.
<br />PUO. Dox wo
<br />S43 ROOM LAM
<br />U08T O, CA R91
<br />(916) 312 -MM 313-11"12
<br />1FH8 pNWPW Ap AH
<br />A1Rf1q,lMA/iAE
<br />mx n vw m AUYFMFM
<br />OIWt'I/8N AICAIgtiRpHAEY IMDS
<br />MFFU®ORF�AI�AEE OR1MW{
<br />58RWRE8Iiia) 9R1G�
<br />COPYRIGHT 0 1997
<br />RANK CLOSURS PLAN
<br />10 GENERAL INFORMATION
<br />U LOCATION! OF TANKS,
<br />am STOP 36
<br />7288 E PRIVIEW STREET
<br />STOCKTO. CA 16206
<br />(20v 464 -OU
<br />12 OUNND6
<br />OUK STOP MARKE", INC.
<br />PA. BOX D149
<br />CA 9031
<br />(90) 651-8600
<br />13 PRDUECTED CLOS DATE,
<br />TO GE DETS@gNED
<br />U TANG DATA,
<br />NUMBER GALLONS MATERIAL PRODUCT
<br />38-1 0000 STEEL
<br />UNLEADED GASOLINE
<br />86-7 10~ STEEL.
<br />UNLEADED GASOLINE
<br />IS HISTORY,
<br />INSTALLED M12
<br />A COTRACTOiS,
<br />TO DE
<br />PRODUCT REMOVAL.
<br />QUK STOP MAPIGE'TS, Na
<br />BOTTOMS REMOVAL,
<br />TO GE DETERMINED
<br />TANG MAULEF14
<br />TO GE
<br />GOOLOSIST
<br />COMM WME ENCU
<br />TANG DISPOSAL FACILITY,
<br />TO GE 06TEPNMMD
<br />A, AC. TO NOTIFY OUTER* REPRESENTATIVE TWD WORKING, DAYS PR ICR
<br />TO LIE TESTIJ4, ClUNIM REPRESENTATIVE SHALL tlUTNE66 ALL LINE
<br />TESTNG. MAW T56T PREMIUM& ON GAUGE WITH ELECTRICAL TAF41 AT
<br />SNOWING OF ?0846. PRESSURE SMALL HOLD FOR AT LEAST ONE (V
<br />HO R AND BE UJITHESSED BY OUNIM S REPRESENTATIVE DO NOT BACKFILL
<br />TRANCHIIS WTL AUTHORIZED BY OUTER'® POP442eo4rATPlL
<br />S. LEST PRESSURES SHALL OR,
<br />2° - 60 PS AND APPLY SOAP SOLUTION,
<br />8' • 40 PSI APO APPLY SOAP SOLUTIO.
<br />9' -GWCICAWr - 5 PSI AND APPLY SOAP GO.UTIOL
<br />C. CAUTION, DISCONNECT FLEX CONNECTOR FROM SPP AND CAP PRIOR
<br />TO 7E5TNG. APPLY 4 RELEASE PRINeURE SLONLY. VBNTNAPOR SYSTEM
<br />64" ES TESTED FIRM TOP O VENT, THROUGH MANIFOLDS), CQ'RACTOR
<br />BASE 40 PUNK STAGE 1 CCNTANMENT MANOLES, STAGE 11 VAPOR
<br />LNIN, t0 NILAN06 AND STAGE It FLEX COIECTOR6 At S).
<br />D. SLOULY PRESSURIZE PRODUCT LINKS AND VENTNAPOR SYSTEM TO 60
<br />PSL SOAP ENTIRE PPffi SURFACES RNCLIONG JOINTS AND FITTINGS
<br />CORRECT ANY LEAKS AND RETEST.
<br />L SLORLY IffiEVE PRESSURE FROM VAPORAIM SYSTEM APO REMOVE
<br />PLUG PROM EACH EXTRACTOR AFTER TEST. REDUCE PRODUCT LINE
<br />PRESSURE TO 6 PSI. MONITOR DAILY UNTIL ALL YARD PAVING 16
<br />C'OMPLLRE.
<br />P. WOGODARY PPE MST BE PF40PORLY OUT INSPECT ALL PRIMARY
<br />PPE 6. PRESSURIZE SECONDARY PIPE TO 5 PSH AND SOAP ALL
<br />PIPE SURFACE AND FITTI NG& PRONNIRE ON THE PIPING SECONDARY
<br />SPACE SHALL 00 MAMA W UNTIL AFTER THE PAYING 18 N PLACE OVER
<br />I" PEED APD PIPING RN6, AND SHALL BE SY THE
<br />FOUNPABSIWATPAL
<br />G. AFRI 00NG WITNESSED BY OUTER* REPREOINTATNE, REMOVE
<br />PREMIUMS HT6w PRODUCT LINES AND AUR FROM SEOOOARY LINES AFTER
<br />PAVING 18 N PLACE
<br />23. GAG SMALL PERFORM PRECSON TEST ON PRODUCT LSE& AFTER PAVING
<br />10 COPPLETS AND PRIOR TO FINAL PROJECT ACCEPTANCE. PRECISIM
<br />LUNE TEST SMALL REN ACCORDANCE WITH MPA 32% LOCA.
<br />OR APPMNED EOUA.. TEST SHALL GE CONDUCTED BY A
<br />CERTIFIED TESTER G.C. SEAL" PWADS UIRITTBN IMPORT OF PREC16M
<br />TEST TO OUR" REPRESENTATIVE PRIOR TO OMNER* ACCEPTANCE OF
<br />24. CONTRACTOR SHALL PROVIDE DOCUMENTATION OF A DYRWOC
<br />TEST OF ALL VAPOR RETURN LINES A5 INEC U RED BY LOCAL ROMYAT1CN8.
<br />25. CONTRACTOR SHALL DO ANY OTHER TROTNG AS REQUIRED BY LOCAL
<br />REGULATIONS,.
<br />26. CCaSTRUCT NEW RBI. ISLANDS AS SHOWN ON
<br />2'L MAY* 00>26 TURBINE SUPS, AND OVERFILL 00>26 ARE TO 00
<br />COMPLETELY SEALED AND WATER TESTED. AS BVIC0400 BY OUNIMS
<br />REPRESENTATIVE AS FOLLOM
<br />L ILL WIN WATER TO HIGHEST PENETRATION.
<br />2. WRRAY PANT TOP OF IVATIM
<br />iO PROVEN AND INSTALL CONDUIT ! WIRING FOR PETROLEUM SYSTEMS) TO
<br />CANOPY LIGHTINCk PROVIDE CONDUIT FOR FUTURE CARDREADERS A0
<br />OhIGE SITE ELECTRICAL A6 INDICATED ON THE
<br />2s ALL GOPDUTT S TO RE 8/41 RU60 CONDUIT.
<br />30 DWAL MONITORING; SYSTEM LTH HYDROSTATIC PROBES. TUIRISINS SUMP
<br />AND ?ANK QAAUGIL AND MONITOR C4WR OL. PANEL N BUILDING PER
<br />3L INSTALL NEW GLDAPICO MPD', SINGLE -HOSE AD CONSOLE
<br />AS NPICAMP ON SIE PLAN AND DRSCFtMW N THE S WPP IO NT LST.
<br />32. WALL SITE LIGHTING AO ANY OTHER ITEMS AN SOWN ON THE
<br />33. INSTALL NREM CONCRETE TANG AND ERNE S.A06 ANO OTHER CONCRETE A$
<br />INDICATED 04 SITE PLAN, CONCRETE SCALL HAVE A MNIIM
<br />CCWPRMM STRENGTH AT 20 DAYS OF 2600 PS. CCNCI@TE SMALL
<br />CONTAIN 5 POUNDS OF LAMPOLACK PER CUBIC YARD - USE DAVIS 6064.
<br />34, REPAIR A NDIM REPLACE AC. PAVNM AND DARE TO MATCH ORWIAL N
<br />ARBAb 010ftPMMP BY WORD
<br />30. ANY WVPIONMNNTAL WORD REQUIRED OUNINDS TNA AD" SCOPE OF WORD
<br />6441 RISE DONE ON A TIME A0 MATERIALS DASb RENTAL ReCNGFT6,
<br />OR INVOICE, MATERIAL AND DAILY LABOR TIME
<br />SMMM STALL R 0110AND TO SUPPORT G TIROL CONTRACTOR TIME A0
<br />MATENAL INVOICE& SUCH WOW SMALL !11 OLLE D SEPARATELY.
<br />2.0 CLOGUX -REMOVAL OF TANKS
<br />SAN JOAO UIN COUNTY CEPARPfMENT OF ENV ALL FWAOURCES TANG
<br />CLOSURE GUIDELINES 40 SOL AND GROUNDWATER SAMPLING
<br />GUIDELINES SHALL GE POLLOSEDM EST WHERE THE POLLOURHG
<br />SPROVICAT1O18 ARE MOIRE RESTRICTIVE
<br />ROMPYN ALL PRODUCT FROM TANKS.
<br />ALL RESIDUAL LICIM, SOLIDS, OR SUDGM
<br />PIS ALL VAPORS FROM TANKS WITH A MINIMUM OF THIRTY (90)
<br />PONOS OF SOLID CAmDCN DOXOE (DRY I= FOR RAC14 1000 &ALL"
<br />OF TANK CAPACITY AND PRESENT SALES SLIPS TO 19Pf=tOR
<br />PELLSTIZIND DRY ICE S RECOMMIINDED CAP ALL OPENINGS EXCEPT
<br />VENT PIPE AND ALLOW RUO HOUR MI IPUPI ANO SIC HOUR MAXIMUM FOR
<br />OXYGEN DISPLACEMENT AFTER PUTTING CAROM DOXDE INTO THE
<br />TANKS VENT PIPE OPINING, TO BE 0MCKED LTH A CCAEUOTBLE GAS
<br />DETECTOR TO DETERMINE P TANK 16 VAPOR FREE OR P ADDITIONAL
<br />DRY ICE AND/OR TIME MAY BE RECURRED.
<br />PLUG OR CAP ALL TANK OPENI MS LEAVING AN V8° - V4' PRESSURE
<br />REEF HOLE NONE CAP AT THE TOP OF THE TANG
<br />VISUALLY INSPECT THE TAMC$ UPON REMOVAL. ALL EXTERNAL TASK
<br />SURFACES AND PITTINGS SMALL BE INSPECTED FOR EVIDENCE OF HOLES
<br />OR LEAKAGE. THE RESULTS OF SUCii INSPECTION SMALL BE
<br />DOCUMENTED N IUNTNG, WITH PUMCGRAPHS ATE.
<br />PATCH ANY HOLES UT14 APPROVED MATERIAL BEFORE TRANSPORTING
<br />TANKS TO DISPOSAL SITE.
<br />TWO SOL SAMPLES SMALL RE ANALYZED FROM BENEATH THE TANG ONE
<br />�.
<br />MOM DIRECTLY OO EATH THE FILL PIPE. THE OTHER FROM A SIMILAR
<br />POSITION AT THE OPPOSITE END OF THE TANK P OBVIOUSLY STALED
<br />OR CONTAMINATED AREAS 6'XST N LOCATIONS OTHER THAN THE ABOVE
<br />LoCATcHo, THEN ADDITIONAL. SOL SAMPLES SHALL RE AAI.117ED FROM
<br />THESE OBYOUSI.Y STAINED OR CONTAMINATED AREAS
<br />&OL SAMPLES SHALL GE COLLECTED FROM THE NATIVE SOW. AT OR
<br />JUST ISELCYN THE INTERFACE OF THE 0Ap4LL VTM THE NATIVE SOL
<br />SAMPLES SHALL BE TAKEN USING A DRIVEN -TUBE TYPE SAMPLER,
<br />CAPPED AND SCALED WITH INERT MATERIALS, FORMAL, D CHAIN -
<br />OP -CUSTODY RECORDS SHALL BE MAWA94M FOR EACH 6A1-PL.E AND
<br />&UBMITTOD LTH THE RESULTS TO THE R IUMATNG AGO4CY.
<br />TO Em PEDTE TFE PROCESS OF TANG IEM OVAL, THE FOLLCM2
<br />ALTERNATIVE SAMPLING METHOD MAY GE USED -
<br />A. IMMEDIATELY UPON REMOVAL OF THE TAM A BACK BUCKET OF
<br />NATIVE SOU. SMALL RE TAKEN FROM THE NATIVE SCOL TWD (2) FRET
<br />BEAN THE SOUBAtKFILL INTERFACE . THIS SOL SMALL GE RAPDLY
<br />BROUGHT TO THE SURFACE.
<br />5 APPROxIMAINLY THM INCHES SHALL BE RAPIDLY SCRAPED AWAY
<br />FROM THE SURFACE OF THS SOL. THEN A CLEAN AMASS I (AT
<br />LEAST THr1EE ">NO LONG) SHALL ON DRIVEN INTO THE SOL WITH A
<br />SUITABLE INSTRUMENT (WOODEN MALLET, ETC,J
<br />C. THE BIDS OF CRA66 TIME SHALL BE C42YORED WITH ALUMINUM FOL,
<br />THEN PLASTIC 00 CAPE AND SLY WRAPPED WITH A SWA15LZ
<br />TAPE.
<br />D. THE SAMPLE SHALL RE IMMEDIATELY PLACED 04 ICS, OR ORT CK,
<br />FOR TRANSPORT TO A LABORATORY. ACME FORMAL CHAIN-OF-CU6T�Y
<br />SHALL BE MAINTAINED AND SUBMITTED FOR EACH SURE.
<br />IF THE BOTTOM OF THE TAMC S SELO) THE TER TABLE, THEIN
<br />SOIL SAMPLES ARE NOT 140GWUIBO. N TNS CASE, A WATER SAMPLE
<br />SMALL LSE COLLECTED AS SOON AD 10086I1B-E PROM THE SURFACE OF
<br />THE GROU DUTATER N THE EXCAVATION. A CHECK SMALL INITIALLY BE
<br />MADE FOR ANY FM FLOATING PRODUCT. IF NO FLOATING PRROGICT IS
<br />DETECTED. T:SEd A WATER SAMPLE SMALL M TAKEN WITH A DEVICE
<br />DESIGNED TO REDUCE THE LOW CP VOLATILE COMMCIIIIIINTS A SAILER
<br />S A SUITABLE &APPLING DEVICE. THA WATER SAMPLE SMALL BE
<br />TELY POURS INTO A VOLATILE ORGANIC ANALYSIS (VOA) VIAL
<br />WITH AS LITTLE AGITATION AS POSSIBLE A TEFLON SMALL LSE
<br />USED TO 80AL THIS VIAL.
<br />SOL AND WATER GAPIPLES, SHALL RE ANALYZED FOR TOTAL
<br />WYOROCARSONS BY TIME METHODS OUTLINED N 'UWUDE.NES FOR
<br />ADDRESSING FUEL. LEAK&. CALIFORNIA REGIONAL V)AMt Gt1ALIT'Y
<br />CONTROL BOARD, 5414 FRANCISCO BAY ROOM - SEPTEMBER MOW
<br />LOAD TANKS ON MIGNIIAY CARRIER WITH PRESSURE RELIEF MOLE UIP ON
<br />SAME DAY AS REMOVAL. UNLESS THE TAW HAVE BERM TRIPLE MIND,
<br />THE CARXllOt MAST SE A LICENSED U14$9E HAULER AND MANIFESTS
<br />MUST ACCOMPANY THE TANKS.
<br />30 REMOVAL OF PIPING
<br />PIING TORE REMOVED SMALL RE EMPTIED OF ALL CONTENTS PF40N 40
<br />REMOVAL "IG, MAA. 06 STOCKPILED ON -STN PRIOR TO DISPOSAL
<br />VISUALLY ASPECT PPE TENCH POR INDICATION OF LEAKAGE. A 606
<br />SAMPLE SMALL EU TAKEN A0 ANALYZED FOR EACM TWENTY LINEAL
<br />PEST OF TRENCH P INSPECTION OF TRENCH MYRALS BVIDINCE OF
<br />LSAKAGL PLOW PROCEDURE LISTED N SECTION 2U FOR OAMPI.IdG
<br />AND ANALYSIS.
<br />IMIK _ •
<br />a 39
<br />2288 E. FREMONT ST.
<br />STOCKTON, CA 95205
<br />(209) 464-1038
<br />SAN JOAQUIN COUNTY
<br />APN 6141-214-03
<br />Ul nLTON
<br />wwE NGINMMG, INC.
<br />PUO. Dox wo
<br />S43 ROOM LAM
<br />U08T O, CA R91
<br />(916) 312 -MM 313-11"12
<br />1FH8 pNWPW Ap AH
<br />A1Rf1q,lMA/iAE
<br />mx n vw m AUYFMFM
<br />OIWt'I/8N AICAIgtiRpHAEY IMDS
<br />MFFU®ORF�AI�AEE OR1MW{
<br />58RWRE8Iiia) 9R1G�
<br />COPYRIGHT 0 1997
<br />
|