Laserfiche WebLink
Z3 <br />MATiAW. AND WORKINIANSHIP <br />L UNLESS OTWMM SPECIFICALLY #01111D N THESE DOC ME NT& ALL <br />BOUIPPIENT MATERIAL AND AR tCLOi INCORPORATED N THE WOR, <br />COVERED BY TESE DOCUMENTS AM TO BE NIBU ATO OF THE MOST SUITABLE <br />GRACE FOR TTME PROCESS INTENC20. <br />2. THE CONTRACTOR SHAT IBURNISH To THE AGEINT FOR H6 <br />APPROVAL "IJAIE OF TE MANUPACTURSK THE MODEL NUMINM AND <br />OTHER IDENTIFY11,13, DATA AND INFORMATION RZSFUCIIIO THE <br />CAPABL.TTY. NATURE , AND RATING OF THE MACHINERY AND <br />MECHANICAL. AND OTHER 5511IP1'1BR WHK3H THE CONTRACTOR CMINPIPLATES <br />114001111 -ORATING, N THE WORK WEEN WAIGIU1111120 BY THE OWN=R* AGSIT. <br />3. U404 MMWAIM> BY THOSE DOCUM04M OR U44 N CALLED FOR BY THE <br />OUNINTS AGENT, THE CONTRACTOR SHALL FURNISH ?OA AGSM FOR <br />APPROVAL PULL INFORMATION CONCERNING THE MATERIAL OR ARTICLES <br />UHCH HE CONTEMPLATES NDOA°ORATINO N THE U O K. UbW SO <br />DIRECTED, SAMPLES MAY BE OUSIP111711110 FOR APPROVAL AT TF* <br />CONTRACTOR'S WOMOMW WITH ALL PREPAID. <br />4. MACHINERY, EdlUIPMENT, MATERIAL, AND ARTICLES NSTALLED OR USED <br />WITHOUT RECAUIlOD AJTR7/AL SHALL BE AT THE RISK OF SIASECLIE NT <br />5. ALL WORK TO oX DONE N ACCORDANCE WITH APPLICABLE COON$ AND <br />REGULATIONS. <br />6. ALL MATERIALS SHALL GE INSTALLED PER PIAHUFACTURER* MTRCTIOS <br />AM THESE OCCU1119476. CONFLICTS SMALL 00 BROUGHT TO THE ATTENTION <br />OF THE OUTER* "ll'am <br />1. P ANY OF THEM DOCUMENTS INDICATE A CONLICT WITH THE STATE OR <br />LOCAL ROMPARIENTS AS ARE CURRENTLY N BTECT AT THE TIME OF THIS <br />T S MIMCTED THAT THE MOOT RESTRICTIVE CODITIOYS) <br />WAD APPLY. <br />L CONTRACTOR EMPLOYEES TO HAVE COMPIJITIND 40 HOURS OSHA TRANM <br />COJM PRIOR TO THE START OF WRC CERTIFICATION OF THIS MAST IX <br />TO ?HE CUM" ENGINEER PRIOR TO THE START CP LOW <br />2. CONTRACTOR EMPLOYEES TO HAVE COMPUIFIND THA PIPlING MANUFACTURE" <br />TRAINING F484XUFRMIDM N ACCORDANCE WITH 1844 CALFORNA LST <br />REGULATIONS . CEMPICAIM SMALL. OR PROVIDED TO OU NWIL <br />CONTRACTOR SHALL COMPLETE THE PIPING INSTALLATION CHlCKLST <br />SUPPLIED PIPING MAMrACTUESR ANO SHALL A58NIS14 THE CHECKLIST TO <br />OUNIM <br />3. CONTRACTOR TO HAVE BEEN TRAINED AND CSRrrZD BY THE TANK <br />"WAr-nMM N CORRECT TANK INSTALLATION N ACCOmANCO MTN 1954 <br />CALW'OWA LST RE4HLATIOS. TES SHALL RX PROVIDED TO <br />OR SHALL COMPLETE THE TANG INSTALLATION CHECKLIST <br />SUPPLIED TANK MANUFAC'4A UEl! A0 $HALL FURNSH THE CHECCLST TO <br />CuNm <br />4. CONTRACTOR TO DEVELOP A SPECIFIC 617E SAFETY PLAN FOR TANK <br />REMOVAL AND TANK WTALLAMN PRIOR TO THE START OF W RK. <br />CONTRACTOR WILL CONDUCT Y919CLY JOD GRE SAFETY MEETINGS WITH ITS <br />E'FLMMO ANO THE MEETING MHz" UULL BE SUPPLIED TO cuam <br />5. CONTRACTOR SHALT. HAVE THE FOLLOWNM LIC21,0E6, <br />A GENERAL W430MMM'A' <br />B MAZARDOUS MATERIAL LNESTANTE HAMOLNG (RAZ•) <br />6. CONTRACTOR $HALL HAVE THE FOLLOWING Imo. CONTRACTOR SHALL <br />HAVE PROOF OP SUCH INSURANCE OI IRLE WITW OWER BY NAMING OAR <br />A6 'ADDITION_ L <br />A STATUTORY LIABILITY <br />IL COMPREHENSIVE GENERAL LASLITY, WITH A COMBINED SMAX <br />LIMIT OF NOT LESS ROAN A3/D00AOo PER OccuRfamcs FOR ODDLY <br />NNUCY AND PROPERTY DA IAM <br />G ALTCMOSILE LIABILITY COVERING UDE OF ALL OWED WSW <br />VEMICLE6 WITH A CCIMISINPID SINGLE LMT OF SINGLE WIT OF LIABLITY <br />OF NOT LESS THAN WOO~ PER OCCURRENCE FOR BODLY INJURY AND <br />PROPERTY DAMAGE:.. <br />1GENERAL CONTRACTOR TO PARNIGH A" LABOR, MATERIAL, RGIUIPMENT. AND <br />SERVICES, NECESSARY FOR OR 1111546CHASLY 11,400ENTAL TO ?HE <br />SATISFACTORY COMPLETION OF ALL LOW SHOWN ON. CALLED POR opt <br />REQUIRED BY THE <br />6. <br />ALL WORK SMALL ES FSPWORPEP N ACCORDANCE WITH THE UNIFORM <br />BUILDING CODE, UNIFOW FIRE CODE, NATIONAL ELECTRICAL CSE. <br />CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS, OSHA <br />CONSTRUCTION SAFETY ORDERS,, ANO ANY OTHER APPLICABLE STATE, CITY, <br />OR COUNTY ORD <br />4 P40WIM TORE SECURED BY OUTER AND SUPPLED TO CONTRACTOR <br />OCNTRACT011% S FOR COMPLYING WITH ALL PERMIT <br />CONDITIONS <br />m GENERAL OMTRACTOR SMALL VST GTE A0 FAMILIARIZE WIPO P OF <br />ALL BASTING PRIOR TO SUMMITTING HSE BD,. <br />IL GENERAL CONTRACTOR SHALL PROTECT ALL 111)GSTNG FACILITIES TO <br />REMAIN UNLESS NOTED OTHININIM CONTRACTOR SMALL REPAIR OR <br />REPLACE TO THE SATISFACTION OF THE CUMMS PMPMSEWArNg ANY <br />EXISTING FACILITIES THAT ARE DAMAGED BY THE CONTRACTOR'S <br />OPE6RATION & <br />E. ASL 07CAVATI" SMALL CE PERFORMED N COMPLIANCE WITH OSHA A0 <br />STATE INIQUILATIONS, THE CONTRACTORS PEFSPUMD TO THA 061" <br />BOOKLET, WCAVATNM APD TRENCHING OPWMTICW, FOR A GAPS WOW <br />FRACTIONS GLIDE FOR PINIPORMING IDCAVATIC4 WORK <br />m UPON CavumCH OF PRM= CONTRACTOR SMALL PROVIDE OGSE4 WITH <br />'AS B1Ar PRANINGS OF ALL TURAS INSTALLED FAY SAME. "AS OftI ° <br />SMALL GE COMPLETED ON -WE MTH INFORMATION NOW DIRECTLY ON <br />AFPPWVW JOB COPT. <br />14. CONTRACTOR SHALL PROVIDE A LST Q ORS, P ANY WHO <br />LILL ISE USED ON ?HE PROJECT. <br />S. CONTRACTOR SMALL COORDINATE ALL &O PECTiOS AD ,APPROVALS AD <br />OSTAI , AT THE COMPLETION OF Ti PROJEC7, ALL TES <br />REQUIRE> TO RUN THE RAGOUT''. <br />S.GOYORNING CODES APO STANDARDS INCLUDE, BUT SMALL NOT CE LP11120 <br />TO, THE STANDARDS OF INE <br />NATIONAL 67ANDAMO INSTITUTE (ANSI) <br />AMMAN PETROLEUM INSTITUTE (API) <br />AMERCAI SOCIETY POR TESTING AO PSA (ASTON <br />UNIFORM 00011 (UNC) <br />NATIONAL SURCTRIC CODE (NNW <br />NATIONAL qE 101110111ICTICH AGENCY (NFPA) <br />LA80RATORM, IC. AL) <br />CALIFORNIA CODE OF REGULATIONS (CCFV <br />LOCAL ORDNACM <br />n. 6AiPETY PLAN. OR SMALL DEVELOP AND MANLAN FOR THE <br />DURATION a A SITE HEALTH A &AIR IY PLAN THAT WILL <br />EFFECTIVELY 1111 ATO i j%m E+NT RECUMD &AFE'TY PROVISIONS. <br />ATO, <br />A. APPOINT .AND EMPLOYEE AS THE SAFETY OFFICER 040 S 0 A.PIND <br />AND AUTHOPMED TO SUPlEQvIbN AND INPQRCE COMPLIANCE WITH THE <br />HEALTH AID SAFETY PLAN. $"" TOA MAPS AID ®LDL. TION OF <br />THE SAFETY OFFICER TO TA AGENT PRIOR TO CdMFEECNG IIIOW <br />ON THE SITE <br />19, THE PLAN SMALL CONTAIN THE NAMES. ADDRESSES AND <br />NUMBERS OF THETHE HOSPITAL FACILITIES <br />THE SITE. A0 A MAP TO THHA OSPHOSPITALITAL PROCEPURS6 SHALL BE <br />WRITTEN N THE PLAN FOR ACTIONS TO BE TAJCJ94 SHOULD STRANGE ODORS <br />OR 4AZARDOUS SUBSTANCES BE UNCOVERED. <br />C. P, DURING, THE COURSE OF THE WORK, UNSAFE COMM" DEVELOP <br />OR ARE ENCOUNTERED, TAKE IMMEDIATE MEASURES TO DORRECT THE <br />COOTIOR P THE CORRECTNC ACTIONS INSUPPICIENT N THE <br />OPINION OF THE OIU4ffftS AGENT, C C STR UCTICN WORK SHALL CEASE WTL <br />COMIRECTIVE ACTIN CAN b IMPLEMENTED. <br />D, PROVIDE A MINIMUM OF TWO FIRE EX114MIONEWS RUTH A MINIMUM <br />CLASS RATING OF 2 -A20 -INC WTNM SO FEET CP THE OPMATI1 <br />S. SERVICE ALERT MLAO) - THE CONTRACTOR SHALL NOTIFY <br />OF USA 2 RLL YORICA43 DAYS IN ADVANCE OF PINIVIORMING <br />ANY W,=AVATION WORK SY CALLING THE TOLL-FREE OE -CALL PROGRAM <br />NUMBER (SOO) 6424441, <br />PKTROLNN WORK SCOPE <br />L PRIOR TO THE START OF WORK; PROVIDE OWNER WITH WOW PLAN AND <br />SCHEDULE THAT ALLOttl THE 6110* STORE TO REMAIN OPEN TO THE <br />FULLEST EXTENT P006FOM <br />2. FENCE OR WORK AREA WITH 6' HIGH CHAIN LINK FENCE. POST 'TMEP <br />OUT• 61ONS ON PENCE 21,2W 30 PONT. AT THE END OF EACH UPOW DAY <br />SECS FENCING PANELS TOGETHER <br />L PLUBM, OUT, AO W40I.S PRODUCT LIES PROM EXISTING TANKS TO <br />ISLANDS. <br />4. REMOVE ALL E>46111N3 RPE,. DISPENSM ISLANDS, ISARRICAMS, REL <br />LINE, CA14OPY ASPHALT AND CONCRETE SURFACES AS REOMIRED, N <br />PI�ARATIM FOR INSTALLATION OF NEE AS SHOWN ON DIRA110,126, ANY <br />SALVAGRAELS OSIUIPPENT TORE REMOVED FROM SITE AS DIRECTED SY <br />MINER REPRESENTATIVE <br />5. PREPARE FOR REMOVAL AND R110401& TWO L0000 GALLON UNDERGROUND <br />(GASMNE) STORAGE TANKS (NST0 N ACCORDANCE WITH THE <br />UNDERGROUND TAMC CLOSURE PLAL OWNER WLL EMPTY TANKS OF <br />PRODUCT. GEMft& CONTRACTOR TO FTOVIDE FOR DRY ICE TO <br />PURGE TASKS, OUT NO LIE" THAN B LBS PER ~ GALLONS CAPACITY, <br />6. CONTRACTOR SMALL PROVIDE POR CLEANING AS <br />TRANSPORTATION. DISPOSAL OF TANK, AND RNN ACCORDANCE CCORDAN CE I ER <br />COUNTY REGULATES, BY APPROVED HALIM CUTTING TANKS ON SITE S <br />NOT MIR ALLOWED. <br />1 OEHOR WILL CONTRACT WITH AND FURNISH COI ULTANTS TO PEPWOP91 SOL <br />AND/OR WATER TESTING UPON TAMC A P1PNG REMOVAL. N ACCORDANCE <br />WITH TANK CLOSURE PLAN AND LOCAL REGULATIONS, (ALLOW Ti14NTY-FOUR <br />HOURS FOR RESULTS OF SOL SAMPLES <br />S CONTRACTOR SMALL PLACE OXGAVATED SOL ON AND SHALL COVER WITH 4 <br />MIL PLASTIC UNTIL SOL 16 REMIOVED. SOL TO GE STOCIQML90 ON <br />5110 FOR SAMPLIKJ PRIOR TO OFF -HAUL BY OTHERS AS DIRECTED BY <br />OWI! <br />S OWER SHALL PROVES FOR TRANSPORTATION AND DISPOSAL OF ALL <br />=XCAVATED SOH. AFTER OF ANY NECESSARY FOR EDIATONL <br />INCLUDINS AERATION. <br />D P IMBOAPtW, BACKFILL THA ABANDONED TANK HO.= ONG'E ALL SAMFLNG <br />A0/0It OVER EXCAVATION IS COMPLETEDWAM97LL MUST GE ENGINEERED <br />FILL CCMIPACTED TO SM. THE CONTRACTOR S RESPONSIBLE FOR <br />CERTIFYING, THE COMPACTION, A THIRD PARTY ENGINEER MAY WITNESS <br />THE PROCESS AND CERTPY THAT THA HOLE WAS COMPACTED PROPERLY TO <br />W11HN 4 FIST OF SURFACE. ONE (U TEST UM.L THEN BE... 0102AED AT <br />4' AD 2' AND O', FOR =A.TOTAL OF IWW 0) COMPACTfON TESTS. <br />PROVEN RESULTS TO OIFER* ATh2. <br />IL CONTRACTOR TO INSTALL HEST CANOPY FOOTINGS PER PLANS, <br />TICS, AND SHOP 01111410420 AND ARRANGE FOR ALL <br />IBPEGTIOS. PMO)VIDE CONDUITS FOR LIGHTING AND INTERCOM. AND <br />COORDINATE RAIN LEADERS AS NECESSARY. <br />D. CONTRACTOR SMALL PLACE SOL FROM FOOTING 0XG4VATION Cly AND SHALL <br />COVER NTN, 4 ML. PLASTIC IML SOLS RNMOlW SOL TO RE <br />STOCKPILED AND SBGVMnATM ON SM FOR SAMPLING PRIOR To OP -HAUL <br />BY OTHERS A6 DIRECTED BY OWNEC <br />S. CONTRACTOR TO OCHROULS APD ARRANGE CANOPY WORtlG PER DRAWINOSAND <br />SPECIFICATIONS CONTRACTOR SHOULD RE PRESENT TO COORIDIMAIE <br />ELECTRICAL. <br />K EXCAVATE AS NECESSARY FOR THE INSTALLATION OF REPLACEPIENT TANKS. <br />S. CONTRACTOR SHALL COVER EXCAVATED SOL LTH 4 ME_ PLASM UNTL <br />SOLS REMOVED. SOU. TO M ST AND SEGREGATED ON SITE <br />FOR 6AMPLNG PRIOR TO OP -MAUL AS 0PIffClSD BY <br />16. INSTALL °IYPAN FILTER PAINUC LI@R N TANK MOLE AND TRENCHES, PER <br />BY WET-NCLO CO NDITIORL PROVIDE TANK <br />HOLD -BOWS A6 FAMISH> BY MANUFACTUPSIR N U IT4 0M CONDITIONS. <br />M INSTALL 2 - 12000 GALLON TANGS PER ONAWINGS AD CURRENT <br />MANUFACTURE" INW1711UMMA UNION SMALL 10 POLLOUIC, AT ALL <br />TREES, A0 SHA" HAR PRECEDENCE OVER OTHER <br />144NJKACTUPSM CHECKLISTS SMALL w COMPLETED BY THE CO{TIRACTOR <br />AS EACH STEPS COMPLETED. TANG !=COMM AND M40WILL TO 00 PW <br />GRAVE-. LUNG JURY S TO ULE MINIMUM 4 ROT, TAMC COMING S TO IDE <br />A MUM" NT, SPACING INITUMN TAW S TO RE A MNIAM OF W. <br />?AMC INTEGRITY TESTING SHALL CONFORM TO MUNFR', <br />S. NSTALLN. 56111AIPMENT AS LISTED N RGIUVIIIINT LST INCLUDING <br />SALVAGEABLE TO BE REINSTALLED, P ANY; PROVIDE AD <br />INSTALL ALL OTHER SCAUFMIM AS REMIXED TO PROVIDE A COMPLETE <br />PETROLEUM SYSTEM <br />16. PROVIDE AND INSTALL NREM PTRODUG4, VEN1', VAPOR AD SECCN CI ARY <br />CONTAINMENT LINES FOR <br />NSTRHCTION& OVER AT ALLMM, AD 6 4 <br />PRINCEDOM=710A CHECKLISTS, <br />SMALL ON COP14JFW DY THE CONTRACTOR AS EACH STEP N COMPLETED. <br />A. 1PRMICT PPNM. 2• M44W PIPING WITH 3• GOT <br />SYSTEM AS BY ALL P ATO COT SY$TDMS <br />SHAH. OR UL FOR NWX METHANOL. CONT SYSTEM SMALL <br />BE BY TAR $AME MMARACnNMK LTN THE $APSE ONtM ADHESIVES <br />APDL FITTING& <br />IN VZNTNAPOR PIPING. FMD THREAD IIA AND RED THREAD 11 WIT4 <br />PITTP106 AND 1000 AO 8000 OR AM IRCH OUALOY <br />WITH ALCOHOL FITTINGS AND RP46 AD:ESIVL DO NOT MIX <br />MANF MA <br />G PERSONS INSTALLING PIPING MST IX CENTRED AS HAVING SM <br />TRAINBP BY <br />D, 57011 PIPE. ALL METAL PMP°ND SHALL GE CLACK IRON 5CA41ECULS <br />40, OR EXTRA STRONG. "VAANi$D PIPE 16 NOT .LLLOWD. FITTINGS <br />SHAD. ES 900 PIN MA.Li,ABLE INCH. <br />0, ALL 6400E PIPE BELOW GRADE 16 TO PIX DOUBLE MAPPED WITH 20 <br />MIL PVC PIPE WRAP. OVER A PPE MAP PRIMER FOR USE WITH VBNYL <br />TAPM AND SMALL RE BY THE SAME MANUFACTURER AS THE WRAP. <br />IN ALL THREADED COAECTI" SHALL BE THREADED UUTM SEALANT <br />W04 SHALL RE CURRENTLY U1141011ANIND BY MAU4FACTWMM FOR IRLL <br />COMPATIBLLITY WITH THE PIPING MATERIAL USED, AND FOUR WE W TN <br />PETAMAIM SOLVENTS REL6, OLS. DEWJ- AND 100% METHANOL. UMICH <br />SHALL RE VERIFIED BY CUNT P~ACTURVW6 PRODUCT DATA SHEET. <br />G. GG SMALL DEMONSTRATE TO COSI M6 REPRESENTATIVE T44AT ALL <br />MATERIALS AUX MSW AND CONFORM TO ADOVE SPECIFICATIONS. <br />20. DO NOT PLACE PRODUCT PIPING UNDER BULODM PIPING RIMING OVER <br />TA" SHALL BE MINIMIZED MAINTAIN MINIPIUPI CLEARANCE AS SHONIN CN <br />DRAUNGG MINIMIZE CROSSING OTHER LIES AND CONDUIT. P PIPING <br />S NOT SHOWN OI SM PLAN, 6C, SMALL RN LITS THE MOST DIRECT <br />ROUT.' SA,lCCT TO APPROVAL BY Owe" ROPRINIENTATIVE <br />21. EXISTING VENT MOM AIX SHOWN ON SITE PLAN INSTALL NOW SUINKr <br />JOINTS AT BOTTOM OF VENT <br />22 PrW &Y&TENS SMALL RE TESTED PER CURRENT MANUFACTURER'S <br />INSTRUCTIONS SMALL RE FOLLOSED AT ALL TIMES, AND SHALL HAVE <br />OVER OTHER ISTRUCTIO & <br />A, AC. TO NOTIFY OUTER* REPRESENTATIVE TWD WORKING, DAYS PR ICR <br />TO LIE TESTIJ4, ClUNIM REPRESENTATIVE SHALL tlUTNE66 ALL LINE <br />TESTNG. MAW T56T PREMIUM& ON GAUGE WITH ELECTRICAL TAF41 AT <br />SNOWING OF ?0846. PRESSURE SMALL HOLD FOR AT LEAST ONE (V <br />HO R AND BE UJITHESSED BY OUNIM S REPRESENTATIVE DO NOT BACKFILL <br />TRANCHIIS WTL AUTHORIZED BY OUTER'® POP442eo4rATPlL <br />S. LEST PRESSURES SHALL OR, <br />2° - 60 PS AND APPLY SOAP SOLUTION, <br />8' • 40 PSI APO APPLY SOAP SOLUTIO. <br />9' -GWCICAWr - 5 PSI AND APPLY SOAP GO.UTIOL <br />C. CAUTION, DISCONNECT FLEX CONNECTOR FROM SPP AND CAP PRIOR <br />TO 7E5TNG. APPLY 4 RELEASE PRINeURE SLONLY. VBNTNAPOR SYSTEM <br />64" ES TESTED FIRM TOP O VENT, THROUGH MANIFOLDS), CQ'RACTOR <br />BASE 40 PUNK STAGE 1 CCNTANMENT MANOLES, STAGE 11 VAPOR <br />LNIN, t0 NILAN06 AND STAGE It FLEX COIECTOR6 At S). <br />D. SLOULY PRESSURIZE PRODUCT LINKS AND VENTNAPOR SYSTEM TO 60 <br />PSL SOAP ENTIRE PPffi SURFACES RNCLIONG JOINTS AND FITTINGS <br />CORRECT ANY LEAKS AND RETEST. <br />L SLORLY IffiEVE PRESSURE FROM VAPORAIM SYSTEM APO REMOVE <br />PLUG PROM EACH EXTRACTOR AFTER TEST. REDUCE PRODUCT LINE <br />PRESSURE TO 6 PSI. MONITOR DAILY UNTIL ALL YARD PAVING 16 <br />C'OMPLLRE. <br />P. WOGODARY PPE MST BE PF40PORLY OUT INSPECT ALL PRIMARY <br />PPE 6. PRESSURIZE SECONDARY PIPE TO 5 PSH AND SOAP ALL <br />PIPE SURFACE AND FITTI NG& PRONNIRE ON THE PIPING SECONDARY <br />SPACE SHALL 00 MAMA W UNTIL AFTER THE PAYING 18 N PLACE OVER <br />I" PEED APD PIPING RN6, AND SHALL BE SY THE <br />FOUNPABSIWATPAL <br />G. AFRI 00NG WITNESSED BY OUTER* REPREOINTATNE, REMOVE <br />PREMIUMS HT6w PRODUCT LINES AND AUR FROM SEOOOARY LINES AFTER <br />PAVING 18 N PLACE <br />23. GAG SMALL PERFORM PRECSON TEST ON PRODUCT LSE& AFTER PAVING <br />10 COPPLETS AND PRIOR TO FINAL PROJECT ACCEPTANCE. PRECISIM <br />LUNE TEST SMALL REN ACCORDANCE WITH MPA 32% LOCA. <br />OR APPMNED EOUA.. TEST SHALL GE CONDUCTED BY A <br />CERTIFIED TESTER G.C. SEAL" PWADS UIRITTBN IMPORT OF PREC16M <br />TEST TO OUR" REPRESENTATIVE PRIOR TO OMNER* ACCEPTANCE OF <br />24. CONTRACTOR SHALL PROVIDE DOCUMENTATION OF A DYRWOC <br />TEST OF ALL VAPOR RETURN LINES A5 INEC U RED BY LOCAL ROMYAT1CN8. <br />25. CONTRACTOR SHALL DO ANY OTHER TROTNG AS REQUIRED BY LOCAL <br />REGULATIONS,. <br />26. CCaSTRUCT NEW RBI. ISLANDS AS SHOWN ON <br />2'L MAY* 00>26 TURBINE SUPS, AND OVERFILL 00>26 ARE TO 00 <br />COMPLETELY SEALED AND WATER TESTED. AS BVIC0400 BY OUNIMS <br />REPRESENTATIVE AS FOLLOM <br />L ILL WIN WATER TO HIGHEST PENETRATION. <br />2. WRRAY PANT TOP OF IVATIM <br />iO PROVEN AND INSTALL CONDUIT ! WIRING FOR PETROLEUM SYSTEMS) TO <br />CANOPY LIGHTINCk PROVIDE CONDUIT FOR FUTURE CARDREADERS A0 <br />OhIGE SITE ELECTRICAL A6 INDICATED ON THE <br />2s ALL GOPDUTT S TO RE 8/41 RU60 CONDUIT. <br />30 DWAL MONITORING; SYSTEM LTH HYDROSTATIC PROBES. TUIRISINS SUMP <br />AND ?ANK QAAUGIL AND MONITOR C4WR OL. PANEL N BUILDING PER <br />3L INSTALL NEW GLDAPICO MPD', SINGLE -HOSE AD CONSOLE <br />AS NPICAMP ON SIE PLAN AND DRSCFtMW N THE S WPP IO NT LST. <br />32. WALL SITE LIGHTING AO ANY OTHER ITEMS AN SOWN ON THE <br />33. INSTALL NREM CONCRETE TANG AND ERNE S.A06 ANO OTHER CONCRETE A$ <br />INDICATED 04 SITE PLAN, CONCRETE SCALL HAVE A MNIIM <br />CCWPRMM STRENGTH AT 20 DAYS OF 2600 PS. CCNCI@TE SMALL <br />CONTAIN 5 POUNDS OF LAMPOLACK PER CUBIC YARD - USE DAVIS 6064. <br />34, REPAIR A NDIM REPLACE AC. PAVNM AND DARE TO MATCH ORWIAL N <br />ARBAb 010ftPMMP BY WORD <br />30. ANY WVPIONMNNTAL WORD REQUIRED OUNINDS TNA AD" SCOPE OF WORD <br />6441 RISE DONE ON A TIME A0 MATERIALS DASb RENTAL ReCNGFT6, <br />OR INVOICE, MATERIAL AND DAILY LABOR TIME <br />SMMM STALL R 0110AND TO SUPPORT G TIROL CONTRACTOR TIME A0 <br />MATENAL INVOICE& SUCH WOW SMALL !11 OLLE D SEPARATELY. <br />2.0 CLOGUX -REMOVAL OF TANKS <br />SAN JOAO UIN COUNTY CEPARPfMENT OF ENV ALL FWAOURCES TANG <br />CLOSURE GUIDELINES 40 SOL AND GROUNDWATER SAMPLING <br />GUIDELINES SHALL GE POLLOSEDM EST WHERE THE POLLOURHG <br />SPROVICAT1O18 ARE MOIRE RESTRICTIVE <br />ROMPYN ALL PRODUCT FROM TANKS. <br />ALL RESIDUAL LICIM, SOLIDS, OR SUDGM <br />PIS ALL VAPORS FROM TANKS WITH A MINIMUM OF THIRTY (90) <br />PONOS OF SOLID CAmDCN DOXOE (DRY I= FOR RAC14 1000 &ALL" <br />OF TANK CAPACITY AND PRESENT SALES SLIPS TO 19Pf=tOR <br />PELLSTIZIND DRY ICE S RECOMMIINDED CAP ALL OPENINGS EXCEPT <br />VENT PIPE AND ALLOW RUO HOUR MI IPUPI ANO SIC HOUR MAXIMUM FOR <br />OXYGEN DISPLACEMENT AFTER PUTTING CAROM DOXDE INTO THE <br />TANKS VENT PIPE OPINING, TO BE 0MCKED LTH A CCAEUOTBLE GAS <br />DETECTOR TO DETERMINE P TANK 16 VAPOR FREE OR P ADDITIONAL <br />DRY ICE AND/OR TIME MAY BE RECURRED. <br />PLUG OR CAP ALL TANK OPENI MS LEAVING AN V8° - V4' PRESSURE <br />REEF HOLE NONE CAP AT THE TOP OF THE TANG <br />VISUALLY INSPECT THE TAMC$ UPON REMOVAL. ALL EXTERNAL TASK <br />SURFACES AND PITTINGS SMALL BE INSPECTED FOR EVIDENCE OF HOLES <br />OR LEAKAGE. THE RESULTS OF SUCii INSPECTION SMALL BE <br />DOCUMENTED N IUNTNG, WITH PUMCGRAPHS ATE. <br />PATCH ANY HOLES UT14 APPROVED MATERIAL BEFORE TRANSPORTING <br />TANKS TO DISPOSAL SITE. <br />TWO SOL SAMPLES SMALL RE ANALYZED FROM BENEATH THE TANG ONE <br />�. <br />MOM DIRECTLY OO EATH THE FILL PIPE. THE OTHER FROM A SIMILAR <br />POSITION AT THE OPPOSITE END OF THE TANK P OBVIOUSLY STALED <br />OR CONTAMINATED AREAS 6'XST N LOCATIONS OTHER THAN THE ABOVE <br />LoCATcHo, THEN ADDITIONAL. SOL SAMPLES SHALL RE AAI.117ED FROM <br />THESE OBYOUSI.Y STAINED OR CONTAMINATED AREAS <br />&OL SAMPLES SHALL GE COLLECTED FROM THE NATIVE SOW. AT OR <br />JUST ISELCYN THE INTERFACE OF THE 0Ap4LL VTM THE NATIVE SOL <br />SAMPLES SHALL BE TAKEN USING A DRIVEN -TUBE TYPE SAMPLER, <br />CAPPED AND SCALED WITH INERT MATERIALS, FORMAL, D CHAIN - <br />OP -CUSTODY RECORDS SHALL BE MAWA94M FOR EACH 6A1-PL.E AND <br />&UBMITTOD LTH THE RESULTS TO THE R IUMATNG AGO4CY. <br />TO Em PEDTE TFE PROCESS OF TANG IEM OVAL, THE FOLLCM2 <br />ALTERNATIVE SAMPLING METHOD MAY GE USED - <br />A. IMMEDIATELY UPON REMOVAL OF THE TAM A BACK BUCKET OF <br />NATIVE SOU. SMALL RE TAKEN FROM THE NATIVE SCOL TWD (2) FRET <br />BEAN THE SOUBAtKFILL INTERFACE . THIS SOL SMALL GE RAPDLY <br />BROUGHT TO THE SURFACE. <br />5 APPROxIMAINLY THM INCHES SHALL BE RAPIDLY SCRAPED AWAY <br />FROM THE SURFACE OF THS SOL. THEN A CLEAN AMASS I (AT <br />LEAST THr1EE ">NO LONG) SHALL ON DRIVEN INTO THE SOL WITH A <br />SUITABLE INSTRUMENT (WOODEN MALLET, ETC,J <br />C. THE BIDS OF CRA66 TIME SHALL BE C42YORED WITH ALUMINUM FOL, <br />THEN PLASTIC 00 CAPE AND SLY WRAPPED WITH A SWA15LZ <br />TAPE. <br />D. THE SAMPLE SHALL RE IMMEDIATELY PLACED 04 ICS, OR ORT CK, <br />FOR TRANSPORT TO A LABORATORY. ACME FORMAL CHAIN-OF-CU6T�Y <br />SHALL BE MAINTAINED AND SUBMITTED FOR EACH SURE. <br />IF THE BOTTOM OF THE TAMC S SELO) THE TER TABLE, THEIN <br />SOIL SAMPLES ARE NOT 140GWUIBO. N TNS CASE, A WATER SAMPLE <br />SMALL LSE COLLECTED AS SOON AD 10086I1B-E PROM THE SURFACE OF <br />THE GROU DUTATER N THE EXCAVATION. A CHECK SMALL INITIALLY BE <br />MADE FOR ANY FM FLOATING PRODUCT. IF NO FLOATING PRROGICT IS <br />DETECTED. T:SEd A WATER SAMPLE SMALL M TAKEN WITH A DEVICE <br />DESIGNED TO REDUCE THE LOW CP VOLATILE COMMCIIIIIINTS A SAILER <br />S A SUITABLE &APPLING DEVICE. THA WATER SAMPLE SMALL BE <br />TELY POURS INTO A VOLATILE ORGANIC ANALYSIS (VOA) VIAL <br />WITH AS LITTLE AGITATION AS POSSIBLE A TEFLON SMALL LSE <br />USED TO 80AL THIS VIAL. <br />SOL AND WATER GAPIPLES, SHALL RE ANALYZED FOR TOTAL <br />WYOROCARSONS BY TIME METHODS OUTLINED N 'UWUDE.NES FOR <br />ADDRESSING FUEL. LEAK&. CALIFORNIA REGIONAL V)AMt Gt1ALIT'Y <br />CONTROL BOARD, 5414 FRANCISCO BAY ROOM - SEPTEMBER MOW <br />LOAD TANKS ON MIGNIIAY CARRIER WITH PRESSURE RELIEF MOLE UIP ON <br />SAME DAY AS REMOVAL. UNLESS THE TAW HAVE BERM TRIPLE MIND, <br />THE CARXllOt MAST SE A LICENSED U14$9E HAULER AND MANIFESTS <br />MUST ACCOMPANY THE TANKS. <br />30 REMOVAL OF PIPING <br />PIING TORE REMOVED SMALL RE EMPTIED OF ALL CONTENTS PF40N 40 <br />REMOVAL "IG, MAA. 06 STOCKPILED ON -STN PRIOR TO DISPOSAL <br />VISUALLY ASPECT PPE TENCH POR INDICATION OF LEAKAGE. A 606 <br />SAMPLE SMALL EU TAKEN A0 ANALYZED FOR EACM TWENTY LINEAL <br />PEST OF TRENCH P INSPECTION OF TRENCH MYRALS BVIDINCE OF <br />LSAKAGL PLOW PROCEDURE LISTED N SECTION 2U FOR OAMPI.IdG <br />AND ANALYSIS. <br />IMIK _ • <br />a 39 <br />2288 E. FREMONT ST. <br />STOCKTON, CA 95205 <br />(209) 464-1038 <br />SAN JOAQUIN COUNTY <br />APN 6141-214-03 <br />Ul nLTON <br />wwE NGINMMG, INC. <br />PUO. Dox wo <br />S43 ROOM LAM <br />U08T O, CA R91 <br />(916) 312 -MM 313-11"12 <br />1FH8 pNWPW Ap AH <br />A1Rf1q,lMA/iAE <br />mx n vw m AUYFMFM <br />OIWt'I/8N AICAIgtiRpHAEY IMDS <br />MFFU®ORF�AI�AEE OR1MW{ <br />58RWRE8Iiia) 9R1G� <br />COPYRIGHT 0 1997 <br />RANK CLOSURS PLAN <br />10 GENERAL INFORMATION <br />U LOCATION! OF TANKS, <br />am STOP 36 <br />7288 E PRIVIEW STREET <br />STOCKTO. CA 16206 <br />(20v 464 -OU <br />12 OUNND6 <br />OUK STOP MARKE", INC. <br />PA. BOX D149 <br />CA 9031 <br />(90) 651-8600 <br />13 PRDUECTED CLOS DATE, <br />TO GE DETS@gNED <br />U TANG DATA, <br />NUMBER GALLONS MATERIAL PRODUCT <br />38-1 0000 STEEL <br />UNLEADED GASOLINE <br />86-7 10~ STEEL. <br />UNLEADED GASOLINE <br />IS HISTORY, <br />INSTALLED M12 <br />A COTRACTOiS, <br />TO DE <br />PRODUCT REMOVAL. <br />QUK STOP MAPIGE'TS, Na <br />BOTTOMS REMOVAL, <br />TO GE DETERMINED <br />TANG MAULEF14 <br />TO GE <br />GOOLOSIST <br />COMM WME ENCU <br />TANG DISPOSAL FACILITY, <br />TO GE 06TEPNMMD <br />A, AC. TO NOTIFY OUTER* REPRESENTATIVE TWD WORKING, DAYS PR ICR <br />TO LIE TESTIJ4, ClUNIM REPRESENTATIVE SHALL tlUTNE66 ALL LINE <br />TESTNG. MAW T56T PREMIUM& ON GAUGE WITH ELECTRICAL TAF41 AT <br />SNOWING OF ?0846. PRESSURE SMALL HOLD FOR AT LEAST ONE (V <br />HO R AND BE UJITHESSED BY OUNIM S REPRESENTATIVE DO NOT BACKFILL <br />TRANCHIIS WTL AUTHORIZED BY OUTER'® POP442eo4rATPlL <br />S. LEST PRESSURES SHALL OR, <br />2° - 60 PS AND APPLY SOAP SOLUTION, <br />8' • 40 PSI APO APPLY SOAP SOLUTIO. <br />9' -GWCICAWr - 5 PSI AND APPLY SOAP GO.UTIOL <br />C. CAUTION, DISCONNECT FLEX CONNECTOR FROM SPP AND CAP PRIOR <br />TO 7E5TNG. APPLY 4 RELEASE PRINeURE SLONLY. VBNTNAPOR SYSTEM <br />64" ES TESTED FIRM TOP O VENT, THROUGH MANIFOLDS), CQ'RACTOR <br />BASE 40 PUNK STAGE 1 CCNTANMENT MANOLES, STAGE 11 VAPOR <br />LNIN, t0 NILAN06 AND STAGE It FLEX COIECTOR6 At S). <br />D. SLOULY PRESSURIZE PRODUCT LINKS AND VENTNAPOR SYSTEM TO 60 <br />PSL SOAP ENTIRE PPffi SURFACES RNCLIONG JOINTS AND FITTINGS <br />CORRECT ANY LEAKS AND RETEST. <br />L SLORLY IffiEVE PRESSURE FROM VAPORAIM SYSTEM APO REMOVE <br />PLUG PROM EACH EXTRACTOR AFTER TEST. REDUCE PRODUCT LINE <br />PRESSURE TO 6 PSI. MONITOR DAILY UNTIL ALL YARD PAVING 16 <br />C'OMPLLRE. <br />P. WOGODARY PPE MST BE PF40PORLY OUT INSPECT ALL PRIMARY <br />PPE 6. PRESSURIZE SECONDARY PIPE TO 5 PSH AND SOAP ALL <br />PIPE SURFACE AND FITTI NG& PRONNIRE ON THE PIPING SECONDARY <br />SPACE SHALL 00 MAMA W UNTIL AFTER THE PAYING 18 N PLACE OVER <br />I" PEED APD PIPING RN6, AND SHALL BE SY THE <br />FOUNPABSIWATPAL <br />G. AFRI 00NG WITNESSED BY OUTER* REPREOINTATNE, REMOVE <br />PREMIUMS HT6w PRODUCT LINES AND AUR FROM SEOOOARY LINES AFTER <br />PAVING 18 N PLACE <br />23. GAG SMALL PERFORM PRECSON TEST ON PRODUCT LSE& AFTER PAVING <br />10 COPPLETS AND PRIOR TO FINAL PROJECT ACCEPTANCE. PRECISIM <br />LUNE TEST SMALL REN ACCORDANCE WITH MPA 32% LOCA. <br />OR APPMNED EOUA.. TEST SHALL GE CONDUCTED BY A <br />CERTIFIED TESTER G.C. SEAL" PWADS UIRITTBN IMPORT OF PREC16M <br />TEST TO OUR" REPRESENTATIVE PRIOR TO OMNER* ACCEPTANCE OF <br />24. CONTRACTOR SHALL PROVIDE DOCUMENTATION OF A DYRWOC <br />TEST OF ALL VAPOR RETURN LINES A5 INEC U RED BY LOCAL ROMYAT1CN8. <br />25. CONTRACTOR SHALL DO ANY OTHER TROTNG AS REQUIRED BY LOCAL <br />REGULATIONS,. <br />26. CCaSTRUCT NEW RBI. ISLANDS AS SHOWN ON <br />2'L MAY* 00>26 TURBINE SUPS, AND OVERFILL 00>26 ARE TO 00 <br />COMPLETELY SEALED AND WATER TESTED. AS BVIC0400 BY OUNIMS <br />REPRESENTATIVE AS FOLLOM <br />L ILL WIN WATER TO HIGHEST PENETRATION. <br />2. WRRAY PANT TOP OF IVATIM <br />iO PROVEN AND INSTALL CONDUIT ! WIRING FOR PETROLEUM SYSTEMS) TO <br />CANOPY LIGHTINCk PROVIDE CONDUIT FOR FUTURE CARDREADERS A0 <br />OhIGE SITE ELECTRICAL A6 INDICATED ON THE <br />2s ALL GOPDUTT S TO RE 8/41 RU60 CONDUIT. <br />30 DWAL MONITORING; SYSTEM LTH HYDROSTATIC PROBES. TUIRISINS SUMP <br />AND ?ANK QAAUGIL AND MONITOR C4WR OL. PANEL N BUILDING PER <br />3L INSTALL NEW GLDAPICO MPD', SINGLE -HOSE AD CONSOLE <br />AS NPICAMP ON SIE PLAN AND DRSCFtMW N THE S WPP IO NT LST. <br />32. WALL SITE LIGHTING AO ANY OTHER ITEMS AN SOWN ON THE <br />33. INSTALL NREM CONCRETE TANG AND ERNE S.A06 ANO OTHER CONCRETE A$ <br />INDICATED 04 SITE PLAN, CONCRETE SCALL HAVE A MNIIM <br />CCWPRMM STRENGTH AT 20 DAYS OF 2600 PS. CCNCI@TE SMALL <br />CONTAIN 5 POUNDS OF LAMPOLACK PER CUBIC YARD - USE DAVIS 6064. <br />34, REPAIR A NDIM REPLACE AC. PAVNM AND DARE TO MATCH ORWIAL N <br />ARBAb 010ftPMMP BY WORD <br />30. ANY WVPIONMNNTAL WORD REQUIRED OUNINDS TNA AD" SCOPE OF WORD <br />6441 RISE DONE ON A TIME A0 MATERIALS DASb RENTAL ReCNGFT6, <br />OR INVOICE, MATERIAL AND DAILY LABOR TIME <br />SMMM STALL R 0110AND TO SUPPORT G TIROL CONTRACTOR TIME A0 <br />MATENAL INVOICE& SUCH WOW SMALL !11 OLLE D SEPARATELY. <br />2.0 CLOGUX -REMOVAL OF TANKS <br />SAN JOAO UIN COUNTY CEPARPfMENT OF ENV ALL FWAOURCES TANG <br />CLOSURE GUIDELINES 40 SOL AND GROUNDWATER SAMPLING <br />GUIDELINES SHALL GE POLLOSEDM EST WHERE THE POLLOURHG <br />SPROVICAT1O18 ARE MOIRE RESTRICTIVE <br />ROMPYN ALL PRODUCT FROM TANKS. <br />ALL RESIDUAL LICIM, SOLIDS, OR SUDGM <br />PIS ALL VAPORS FROM TANKS WITH A MINIMUM OF THIRTY (90) <br />PONOS OF SOLID CAmDCN DOXOE (DRY I= FOR RAC14 1000 &ALL" <br />OF TANK CAPACITY AND PRESENT SALES SLIPS TO 19Pf=tOR <br />PELLSTIZIND DRY ICE S RECOMMIINDED CAP ALL OPENINGS EXCEPT <br />VENT PIPE AND ALLOW RUO HOUR MI IPUPI ANO SIC HOUR MAXIMUM FOR <br />OXYGEN DISPLACEMENT AFTER PUTTING CAROM DOXDE INTO THE <br />TANKS VENT PIPE OPINING, TO BE 0MCKED LTH A CCAEUOTBLE GAS <br />DETECTOR TO DETERMINE P TANK 16 VAPOR FREE OR P ADDITIONAL <br />DRY ICE AND/OR TIME MAY BE RECURRED. <br />PLUG OR CAP ALL TANK OPENI MS LEAVING AN V8° - V4' PRESSURE <br />REEF HOLE NONE CAP AT THE TOP OF THE TANG <br />VISUALLY INSPECT THE TAMC$ UPON REMOVAL. ALL EXTERNAL TASK <br />SURFACES AND PITTINGS SMALL BE INSPECTED FOR EVIDENCE OF HOLES <br />OR LEAKAGE. THE RESULTS OF SUCii INSPECTION SMALL BE <br />DOCUMENTED N IUNTNG, WITH PUMCGRAPHS ATE. <br />PATCH ANY HOLES UT14 APPROVED MATERIAL BEFORE TRANSPORTING <br />TANKS TO DISPOSAL SITE. <br />TWO SOL SAMPLES SMALL RE ANALYZED FROM BENEATH THE TANG ONE <br />�. <br />MOM DIRECTLY OO EATH THE FILL PIPE. THE OTHER FROM A SIMILAR <br />POSITION AT THE OPPOSITE END OF THE TANK P OBVIOUSLY STALED <br />OR CONTAMINATED AREAS 6'XST N LOCATIONS OTHER THAN THE ABOVE <br />LoCATcHo, THEN ADDITIONAL. SOL SAMPLES SHALL RE AAI.117ED FROM <br />THESE OBYOUSI.Y STAINED OR CONTAMINATED AREAS <br />&OL SAMPLES SHALL GE COLLECTED FROM THE NATIVE SOW. AT OR <br />JUST ISELCYN THE INTERFACE OF THE 0Ap4LL VTM THE NATIVE SOL <br />SAMPLES SHALL BE TAKEN USING A DRIVEN -TUBE TYPE SAMPLER, <br />CAPPED AND SCALED WITH INERT MATERIALS, FORMAL, D CHAIN - <br />OP -CUSTODY RECORDS SHALL BE MAWA94M FOR EACH 6A1-PL.E AND <br />&UBMITTOD LTH THE RESULTS TO THE R IUMATNG AGO4CY. <br />TO Em PEDTE TFE PROCESS OF TANG IEM OVAL, THE FOLLCM2 <br />ALTERNATIVE SAMPLING METHOD MAY GE USED - <br />A. IMMEDIATELY UPON REMOVAL OF THE TAM A BACK BUCKET OF <br />NATIVE SOU. SMALL RE TAKEN FROM THE NATIVE SCOL TWD (2) FRET <br />BEAN THE SOUBAtKFILL INTERFACE . THIS SOL SMALL GE RAPDLY <br />BROUGHT TO THE SURFACE. <br />5 APPROxIMAINLY THM INCHES SHALL BE RAPIDLY SCRAPED AWAY <br />FROM THE SURFACE OF THS SOL. THEN A CLEAN AMASS I (AT <br />LEAST THr1EE ">NO LONG) SHALL ON DRIVEN INTO THE SOL WITH A <br />SUITABLE INSTRUMENT (WOODEN MALLET, ETC,J <br />C. THE BIDS OF CRA66 TIME SHALL BE C42YORED WITH ALUMINUM FOL, <br />THEN PLASTIC 00 CAPE AND SLY WRAPPED WITH A SWA15LZ <br />TAPE. <br />D. THE SAMPLE SHALL RE IMMEDIATELY PLACED 04 ICS, OR ORT CK, <br />FOR TRANSPORT TO A LABORATORY. ACME FORMAL CHAIN-OF-CU6T�Y <br />SHALL BE MAINTAINED AND SUBMITTED FOR EACH SURE. <br />IF THE BOTTOM OF THE TAMC S SELO) THE TER TABLE, THEIN <br />SOIL SAMPLES ARE NOT 140GWUIBO. N TNS CASE, A WATER SAMPLE <br />SMALL LSE COLLECTED AS SOON AD 10086I1B-E PROM THE SURFACE OF <br />THE GROU DUTATER N THE EXCAVATION. A CHECK SMALL INITIALLY BE <br />MADE FOR ANY FM FLOATING PRODUCT. IF NO FLOATING PRROGICT IS <br />DETECTED. T:SEd A WATER SAMPLE SMALL M TAKEN WITH A DEVICE <br />DESIGNED TO REDUCE THE LOW CP VOLATILE COMMCIIIIIINTS A SAILER <br />S A SUITABLE &APPLING DEVICE. THA WATER SAMPLE SMALL BE <br />TELY POURS INTO A VOLATILE ORGANIC ANALYSIS (VOA) VIAL <br />WITH AS LITTLE AGITATION AS POSSIBLE A TEFLON SMALL LSE <br />USED TO 80AL THIS VIAL. <br />SOL AND WATER GAPIPLES, SHALL RE ANALYZED FOR TOTAL <br />WYOROCARSONS BY TIME METHODS OUTLINED N 'UWUDE.NES FOR <br />ADDRESSING FUEL. LEAK&. CALIFORNIA REGIONAL V)AMt Gt1ALIT'Y <br />CONTROL BOARD, 5414 FRANCISCO BAY ROOM - SEPTEMBER MOW <br />LOAD TANKS ON MIGNIIAY CARRIER WITH PRESSURE RELIEF MOLE UIP ON <br />SAME DAY AS REMOVAL. UNLESS THE TAW HAVE BERM TRIPLE MIND, <br />THE CARXllOt MAST SE A LICENSED U14$9E HAULER AND MANIFESTS <br />MUST ACCOMPANY THE TANKS. <br />30 REMOVAL OF PIPING <br />PIING TORE REMOVED SMALL RE EMPTIED OF ALL CONTENTS PF40N 40 <br />REMOVAL "IG, MAA. 06 STOCKPILED ON -STN PRIOR TO DISPOSAL <br />VISUALLY ASPECT PPE TENCH POR INDICATION OF LEAKAGE. A 606 <br />SAMPLE SMALL EU TAKEN A0 ANALYZED FOR EACM TWENTY LINEAL <br />PEST OF TRENCH P INSPECTION OF TRENCH MYRALS BVIDINCE OF <br />LSAKAGL PLOW PROCEDURE LISTED N SECTION 2U FOR OAMPI.IdG <br />AND ANALYSIS. <br />IMIK _ • <br />a 39 <br />2288 E. FREMONT ST. <br />STOCKTON, CA 95205 <br />(209) 464-1038 <br />SAN JOAQUIN COUNTY <br />APN 6141-214-03 <br />Ul nLTON <br />wwE NGINMMG, INC. <br />PUO. Dox wo <br />S43 ROOM LAM <br />U08T O, CA R91 <br />(916) 312 -MM 313-11"12 <br />1FH8 pNWPW Ap AH <br />A1Rf1q,lMA/iAE <br />mx n vw m AUYFMFM <br />OIWt'I/8N AICAIgtiRpHAEY IMDS <br />MFFU®ORF�AI�AEE OR1MW{ <br />58RWRE8Iiia) 9R1G� <br />COPYRIGHT 0 1997 <br />