My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2285
>
2300 - Underground Storage Tank Program
>
PR0231111
>
COMPLIANCE INFO_1986-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 8:38:01 AM
Creation date
6/23/2020 6:42:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1999
RECORD_ID
PR0231111
PE
2361
FACILITY_ID
FA0001659
FACILITY_NAME
QUIK STOP MARKET #7039
STREET_NUMBER
2285
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
141-214-03
CURRENT_STATUS
01
SITE_LOCATION
2285 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231111_2285 E FREMONT_1986-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L] <br />• <br />SITE EALTH & SAFETY PLAN <br />All personnel assigned to this project will be required <br />to demonstrate that they have completed the Initial <br />Training Requirements (40-hrs.), according to Federal <br />OSHA Standards under 39 CFR 1910.120. <br />Field personnel from Walton Engineering, Inc., <br />1°Environmental Consultant" and their subcontractors will <br />attend a project -specific training program for safety <br />issues and project work task review before beginning <br />work. The meeting will also be attended by the Project <br />Superintendent and the Project Safety Officer. <br />A. All Walton Engineering, Inc. and "Environmental <br />Consultant" site personnel shall have completed <br />training relative to the project operations plans, <br />and the materials to be encountered during the <br />project. This training shall be conducted by the <br />"Environmental Consultant" Project Safety Officer, <br />and shall include practical application exercises <br />regarding the hazards to be expected and the <br />protective equipment to be utilized. <br />This formal training is supplemented by daily safety <br />briefings and site specific training as required. <br />All subcontractor personnel will be required to <br />complete the same basic training, and to attend all <br />safety briefings. <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.