Laserfiche WebLink
10 <br />11 <br />April 8, 1997 <br />To All Unit III Inspectors, <br />Recently, we held an office hearing with Quik Stop Markets, Inc., regarding the need <br />to obtain permits for all work done on the underground storage tanks and monitoring <br />systems, this includes leak detector replacement and monitoring probe replacement. <br />Mr. Karvelot assured me that he will have his contractor obtain permits for every <br />facility where work is performed. The work can be performed with a permit being <br />obtained the moment the work is done at the site (if it is a failed leak detector). In all <br />other cases the permit should be obtained in advance (unless approved by your <br />supervisor). <br />Mr. Karvelot requested that -a copy of every inspection report be sent to him so that <br />he can guarantee the facility obtains compliance. Please be sure to send him a copy <br />of every inspection report, in addition to leaving one for the operator. <br />Please address the correspondence to: <br />Mike Karvelot <br />Quik Stop Markets, Inc. <br />PO Box 5745 <br />Fremont, CA 94537 <br />Thanks, <br />Kasey <br />