My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2285
>
2300 - Underground Storage Tank Program
>
PR0231111
>
COMPLIANCE INFO_1986-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 8:38:01 AM
Creation date
6/23/2020 6:42:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1999
RECORD_ID
PR0231111
PE
2361
FACILITY_ID
FA0001659
FACILITY_NAME
QUIK STOP MARKET #7039
STREET_NUMBER
2285
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
141-214-03
CURRENT_STATUS
01
SITE_LOCATION
2285 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231111_2285 E FREMONT_1986-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING PROCEDURES <br />Underground Storage Tank Monitoring Program <br />FACILITY NAME: ` It s <br />FACILITY ADDRESS: oy S4,z e e C/c 4d Aj , C ,52 <br />A. Describe the frequency of performing the monitoring: <br />Tank Data recorded daily, analyzed monthly y Statistical Inventory Reconciliation <br />(SIR) precision tested biannually. <br />Piping Monitored hourly (continuously) by mechanical leak detectors, precision tested <br />annually. SIR analysis performed monthly. <br />B. What methods and equipment will be used for performing the monitoring: <br />Tank SIR analysis performed monthly by USTMAN Industries. tank precision testing--- <br />by <br />estingby various State certified tank testing vendors. <br />Piping Red Jacket Model XLD or PLD Mechanical Leak Detectors, SIR and line testing <br />as above. <br />C. Describe the location(s) where the monitoring will be performed (facility plot plan must <br />be attached): Data collected at tanks, recorded and kept at checkout counter, analyzed <br />offsite: Mechanical leak detectors are located in turbine sump. <br />D. List the names and titles of the people responsible for performing the monitoring and/or <br />maintaining the equipment: G et e 4 649,e -i, t 4,zd #t.Franchisee,_ <br />Director of Environmental Affairs, responsible for maintainingthe he equipment. <br />E. Reporting format for monitoring: <br />Tank Monthly Fuel Reports and Monthly SIR Results. <br />Piping Monthly SIR Results. <br />F. Describe the preventive maintenance schedule for the monitoring equipment: <br />Maintenance not required. Mechanical leak detectors tested annually and replaced upon <br />failure. <br />G. Describe the training necessary for UST operation, including the monitoring equipment: <br />Franchisee is trained to operate the complete UST system by Quik Stop personnel at the <br />time the system is installed. Franchisee, thereafter, is responsible for training his or her <br />store employees on the system operation. <br />DATE Z 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.