Laserfiche WebLink
- L <br /> WRITTEN MONITORING PROCEDURES <br /> FOR <br /> DOUBLE CONTAINMENT UNDERGROUND STORAGE TANK SYSTEMS <br /> These written procedures are required by California UST Regulations, Section 2632(d)(1), must <br /> be maintained at the UST location at all times, and are a condition of the operating permit. <br /> Quik Stop Market#39 <br /> 2285 East Fremont Street <br /> Stockton, California 95205 <br /> The gasoline storage and dispensing system at this location consists of two (2) 12,000 gallon, <br /> double-wall fiberglass,brine-filled interstitial, underground storage tanks serving two (2) double- <br /> sided blend dispensers (3 product). Product lines are double wall fiberglass. <br /> A. The interstitial space of each tank and product line is monitored continuously by probes <br /> within the brine reservoir and turbine sump, respectively. <br /> B. The Gilbarco EMC 3.1 tank and line monitoring system is manufactured by Veeder- <br /> Root. Leak conditions (except in dispensers)trigger visual and audible alarms located in <br /> the monitoring system control panel, as well as shut off power to turbines. <br /> C. The monitor control panel is located in the market storeroom. The monitor is placed in <br /> test mode daily to check alarm function. Results are recorded on a"Daily Monitoring <br /> System Inspection Log". <br /> D. Monitoring is the responsibility of Sital &Kuljit Gill, Franchisees, or their designated <br /> duty clerk. Maintenance of the monitoring equipment is the responsibility of Quik Stop <br /> Markets, Inc. Required work will be authorized by Mike Karvelot, Director of <br /> Environmental Affairs. <br /> E. If an alarm occurs, the Store Manager will immediately contact the Quik Stop Gasoline <br /> Department, which will in turn dispatch a qualified service contractor to the site. The <br /> service contractor will determine the cause of alarm and advise Quik Stop of site <br /> conditions. If an unauthorized release to secondary containment has occurred, action will <br /> be immediately taken to implement the Written Response Plan. <br /> F. The monitoring panel and interstitial probes are checked and certified annually. <br /> Preventive maintenance is scheduled annually in conjunction with certification. <br /> G. A description of the gasoline system operation and operator's responsibilities are included <br /> in the Franchise Agreement. Initial training in operation of the tank system and <br /> monitoring equipment is conducted "on the job" under the supervision of Quik Stop <br /> personnel. <br />