Laserfiche WebLink
SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> r <br /> 1.PC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-s4, <br /> �" 490-34b <br /> 1.CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS _❑_99.OTHER(Specify): <br /> _PANEL MANUFACTURER: VEEDER-ROOT(GILBARCO BRANDED) e 490-33 MODEL#:EMC(TLS-350 EQUIV.) 490-56. <br /> LEAK SENSOR MANUFACTURER: VEEDER-ROOT 490'57 MO (S):0847990-001 Y 490-58 <br /> DEL# <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS Era.YES ❑b.NO 490.59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES b.NO 490.60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ YES b.NO 490.61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. a YE O 490-62 <br /> 4963 <br /> 2.UDC CONSTRUCTION IS Erl.SINGLE-WALLED ❑2.DOUBLE-WALLED ' i' <br /> IF DOUBLE WALLED: 490-64a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: [11.LIgUID ❑2.PRESSURE ❑3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 490 64b <br /> _ t <br /> ❑ 1. ELD TESTING. THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49"5 <br /> _LEAK DETECTION(ELD) BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR§2644.1 <br /> SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 4M66 <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490.67 <br /> f <br /> The ollowing monitormg/TT .nance records are kept for this facility: <br /> (0 Alarm logs 490-689 WrVisual Inspection Records 49048b ❑Tank integrity testing results 490-68C <br /> ❑SIR testing results(and supporting documentation records). 490-68d ❑ Tank gauging results(and supporting documentation records). 4w6se <br /> ❑ATG Testing results(and supporting documentation records).490-6af ❑ Corrosion Protection 60-day logs 490-68a <br /> Equipment maintenance and calibration records. 490-68b <br /> a;7777777 <br /> 02�5 <br /> vt„ <br /> ersonnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490.69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> P HIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490.69b <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490.690 <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-690 <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICALINVENTORY RECONCILIATION"490-69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-698 <br /> ff'OTHER(Specify):b469h,n46m "Written Procedures&BestManagement Practices for Monitoring Double Containment UST Systems" <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> Names of contact person(s)for emergencies and monitoring alarms.49o-7o <br /> Provide additions!commends here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> TANK OVERFILL PREVENTION(OR PROTECTION)IS ACCOMPLISHED BY THE FOL OING TWO(2)METHODS: <br /> 1. MECHANICAL OVERFILL VALVES INSTALLED IN DROP TUBES. e S' <br /> 2. ALL SERVICE PENETRATIONS TO THE PRIMARY CONTAINMENT ARE CONTAINED WITHIN SUMPS <br /> XI.PE L __ <br /> _ �SIBIL <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME SITAL&KULJPT GILL 490-72 TITLE FRANCHISEES 490-73 <br /> NAME SAMI ALKOUSSA 49o-74 TITTLE DISTRICT ADVISOR 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> .'f' :x Y.. „ 3F�. ,.,.,�..». n.,5.,.,.°„':',�w®rt 1/./ 471T # .f T'jg �aS f •.1 au, ,F,,.. <br /> d'.✓i��3 F o <br /> ON <br /> CERTIFICATION:I certify that the info tion provi d herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE 490-76 DATE: 490 77 <br /> AUGUST 28,2009 <br /> REP L T F '1' 0 3 'v <br /> APPLICANT NAME(print): 4110-711APPLICANT TITLE: 490-79 <br /> MIKE KARVELOT,for QUIK STOP MARKETS,INC. DIRECTOR,ENVIRONMENTAL AFFAIRS <br /> UPCF UST-D(12/2007)3/4 <br />