My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2285
>
2300 - Underground Storage Tank Program
>
PR0231111
>
COMPLIANCE INFO_2006-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2021 9:09:52 AM
Creation date
6/23/2020 6:43:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2013
RECORD_ID
PR0231111
PE
2361
FACILITY_ID
FA0001659
FACILITY_NAME
QUIK STOP MARKET #7039
STREET_NUMBER
2285
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
141-214-03
CURRENT_STATUS
01
SITE_LOCATION
2285 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231111_2285 E FREMONT_2006-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a4�!ly. <br />?°L—•'�P SAN JOAQUIN COUNTY <br />?< ENVIRONMENTAL HEALTH DEPARTMENT <br />600 East Main Street, Stockton, CA 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />ray/FOR�`� <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />Inspection Date: <br />Quik Stop Markets #39 <br />Monday, September 20, 2010 <br />Facility Address: <br />Service Request* <br />2285 E. Fremont, Stockton <br />SR0060875 <br />Onsite Service Technician's Name: <br />ICC Service Technician/Installer Exp. Date: <br />Manufacturer Training: <br />Brian Roth (Walton Engineering) <br />5093199 -UT (4/18/2011) <br />SERVICE <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ <br />❑ electronic Serial #: <br />❑ line test programmed <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />13 fail safe Serial #: <br />❑ <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ <br />❑fail safe Serial #: <br />❑ <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />I Overfill prevention (see LG letter 150-1) <br />SERVICE <br />87 Spill bucket ❑ minimum 5 gallon <br />® <br />®1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />O Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 2° containment components are required to be tested upon <br />installation, 6 months atter, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />Observed 1 -hour hydrostatic test of the newly installed 87 octane fill sump OPW Model #511/521 spill <br />container. Passed. Deposition of petroleum fuel to this tank may resume. <br />*"Note: Conditions of the spill container replacement permit, SR0060875, required facility to cease <br />deposition of petroleum to the 87 octane tank (tank) until inspection of the spill container test and <br />approval by EHD. Inventory printout indicated fuel was deposited in the tank on 9/192010 at 11:58pm <br />to 9/20/2010 at 12:16am increasing from 5954 gallons recorded on 8/12/2010 to 7346 gallons. The <br />spill container was replaced on 8/13/2010 according to Walton technician and Walton invoice on site. <br />THP FACILITY IS SUB CT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />EHD r._ /I Received By: �I ^� 6 Title: <br />EHD 215-04 VV / l I UST SERVICE REQUEST INSPECTION REPORT <br />Rev 06/01/10 v <br />
The URL can be used to link to this page
Your browser does not support the video tag.