Laserfiche WebLink
IWIITTIM:455121 �' • <br />+ � f <br />G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />CERTIFICATION / TEST <br />DATE: Au ust 8, 2016 <br />Al. FACILITY <br />A2. OWNER ;117. <br />❑ <br />Name Quik Stop Market # 39 <br />Name Quik Stop Markets, Inc. <br />Address 2285 E. Fremont Street, Stockton, CA 95205 <br />Address 4567 Enterprise Street, Fremont, CA 94538 <br />Phone # 510-657-8500 <br />g Phone # 510-657-8500 <br />(check all that apply) Simulated leak rate: 3 h.; ❑ 0.1 h.; ❑ 0.2 h. <br />PP Y) 9•P• 9•P• 9•P• <br />Contact Roger Batra <br />Contact Debbie Markovich <br />:=.. 477✓-'-,'. .t„2...n.: <br />F. IN -TANK GAUGING / SIR EQUIPMENT: ■ Check this box if tank gauging is used only for inventory control. <br />❑ <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />This section must be completed if in -tank gaugung equipment is used to perform leak detection monitoring. <br />Yes <br />❑ <br />No* <br />Complete the following checklist: <br />1n �.- <br />■ <br />❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ <br />❑ Yes ❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes ❑ No* <br />Was accuracy of system product level readings tested? <br />❑ <br />N/A <br />❑ Yes ❑ No* <br />Was accuracy of system water level readings tested? <br />' ❑ <br />❑ Yes ❑ No *Were <br />all probes reinstalled properly? <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />I°t <br />❑ Yes ❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />�M" Er.» �,, . :,. , .., .: i <br />❑ <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />r, <br />No* <br />G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />"M °TMi:,#�'v'*ym''... "e.t:f: �i,,. FV- .T'. ab1�S.,:r „�.�:x.;.'3 .u..s$5��. 5... <br />® 2016 Walton Engineering, Inc. <br />Page 3 of 3 <br />■ <br />Yes <br />❑ <br />No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />_' <br />❑ <br />NIA <br />(check all that apply) Simulated leak rate: 3 h.; ❑ 0.1 h.; ❑ 0.2 h. <br />PP Y) 9•P• 9•P• 9•P• <br />■ <br />Yes <br />❑ <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />■ <br />Yes <br />❑ <br />No* <br />Was the testing apparatus properly calibrated? <br />■ <br />Yes <br />❑ <br />No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ <br />N/A <br />' ❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />I°t <br />■ <br />NIA <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />f <br />■ <br />NIA <br />or disconnected? <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />x <br />re <br />■ <br />N/A <br />or fails a test? <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />■ <br />N/A <br />■ <br />Yes <br />❑ <br />No * <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />E L: T, <br />2m�- <br />* In <br />Section <br />H below, describe <br />how and when these deficiencies were or will be corrected. <br />-77 7 <br />H. COMMENTS <br />ch <br />t <br />y, <br />�4 <br />i <br />"M °TMi:,#�'v'*ym''... "e.t:f: �i,,. FV- .T'. ab1�S.,:r „�.�:x.;.'3 .u..s$5��. 5... <br />® 2016 Walton Engineering, Inc. <br />Page 3 of 3 <br />