My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2285
>
2300 - Underground Storage Tank Program
>
PR0231111
>
COMPLIANCE INFO_2013-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2021 9:48:20 AM
Creation date
6/23/2020 6:43:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2017
RECORD_ID
PR0231111
PE
2361
FACILITY_ID
FA0001659
FACILITY_NAME
QUIK STOP MARKET #7039
STREET_NUMBER
2285
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
141-214-03
CURRENT_STATUS
01
SITE_LOCATION
2285 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231111_2285 E FREMONT_2013-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IWIITTIM:455121 �' • <br />+ � f <br />G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />CERTIFICATION / TEST <br />DATE: Au ust 8, 2016 <br />Al. FACILITY <br />A2. OWNER ;117. <br />❑ <br />Name Quik Stop Market # 39 <br />Name Quik Stop Markets, Inc. <br />Address 2285 E. Fremont Street, Stockton, CA 95205 <br />Address 4567 Enterprise Street, Fremont, CA 94538 <br />Phone # 510-657-8500 <br />g Phone # 510-657-8500 <br />(check all that apply) Simulated leak rate: 3 h.; ❑ 0.1 h.; ❑ 0.2 h. <br />PP Y) 9•P• 9•P• 9•P• <br />Contact Roger Batra <br />Contact Debbie Markovich <br />:=.. 477✓-'-,'. .t„2...n.: <br />F. IN -TANK GAUGING / SIR EQUIPMENT: ■ Check this box if tank gauging is used only for inventory control. <br />❑ <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />This section must be completed if in -tank gaugung equipment is used to perform leak detection monitoring. <br />Yes <br />❑ <br />No* <br />Complete the following checklist: <br />1n �.- <br />■ <br />❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ <br />❑ Yes ❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes ❑ No* <br />Was accuracy of system product level readings tested? <br />❑ <br />N/A <br />❑ Yes ❑ No* <br />Was accuracy of system water level readings tested? <br />' ❑ <br />❑ Yes ❑ No *Were <br />all probes reinstalled properly? <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />I°t <br />❑ Yes ❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />�M" Er.» �,, . :,. , .., .: i <br />❑ <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />r, <br />No* <br />G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />"M °TMi:,#�'v'*ym''... "e.t:f: �i,,. FV- .T'. ab1�S.,:r „�.�:x.;.'3 .u..s$5��. 5... <br />® 2016 Walton Engineering, Inc. <br />Page 3 of 3 <br />■ <br />Yes <br />❑ <br />No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />_' <br />❑ <br />NIA <br />(check all that apply) Simulated leak rate: 3 h.; ❑ 0.1 h.; ❑ 0.2 h. <br />PP Y) 9•P• 9•P• 9•P• <br />■ <br />Yes <br />❑ <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />■ <br />Yes <br />❑ <br />No* <br />Was the testing apparatus properly calibrated? <br />■ <br />Yes <br />❑ <br />No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ <br />N/A <br />' ❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />I°t <br />■ <br />NIA <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />f <br />■ <br />NIA <br />or disconnected? <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />x <br />re <br />■ <br />N/A <br />or fails a test? <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />■ <br />N/A <br />■ <br />Yes <br />❑ <br />No * <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />E L: T, <br />2m�- <br />* In <br />Section <br />H below, describe <br />how and when these deficiencies were or will be corrected. <br />-77 7 <br />H. COMMENTS <br />ch <br />t <br />y, <br />�4 <br />i <br />"M °TMi:,#�'v'*ym''... "e.t:f: �i,,. FV- .T'. ab1�S.,:r „�.�:x.;.'3 .u..s$5��. 5... <br />® 2016 Walton Engineering, Inc. <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.