My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2285
>
2300 - Underground Storage Tank Program
>
PR0231111
>
COMPLIANCE INFO_2013-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2021 9:48:20 AM
Creation date
6/23/2020 6:43:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2017
RECORD_ID
PR0231111
PE
2361
FACILITY_ID
FA0001659
FACILITY_NAME
QUIK STOP MARKET #7039
STREET_NUMBER
2285
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
141-214-03
CURRENT_STATUS
01
SITE_LOCATION
2285 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231111_2285 E FREMONT_2013-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vaporless manufacturing, Inc. <br />ky rx— <br />Quality Petroleum Equipment Solutions For Over 20 Yeam <br />'""'ECEIVED, <br />S9 �20001 <br />Highest Performance, FEB 0 9 2017 <br />Most Requested Mechanical Line Leak Detector Built Todayl <br />ENVIRONMENTAL HEAL <br />• Any Fuel* QEPAQ-rMEN <br />- Alcohols, Biodieselq Aviation, Gasoline, blese <br />• Any Pump* <br />• Electronic Interface Available <br />• Longest Length Pipeline System* <br />• Largest Volume Pipeline System* <br />• Integrated Check Valve / Pressure Relief <br />• Field Adjustable LeakThreshold <br />• Now Available! Factory Certifications for Installation <br />and Annual Testing" <br />I <br />The 99 LD -2000 is the most requested mechanical line leak detector built today. New <br />engineering and the Vrni 2 -year warranty (after installation) make the 99 LD -2000 more <br />attractive to station operators today than ever before. Not only is the 99 LD -2000 less <br />expensive to own, it is faster and less subject to field and line variables than ever before! <br />Integrated In -Line Check Valve / Pressure Relief relief, or a defective <br />A leaking check valve in the turbine, defective submersible pump pressure <br />bypass valve will allow the line system to depressurize., resetting the leak detector. Drain - <br />back into the tank and thermal contraction will cause vapor pockets to form. Vapor pockets <br />increase the length of time it takes for a leak detector to open to full flow. Pump problems <br />such as these result in slow flow and technical support calls. The resulting service costs and <br />customer dissatisfaction all take away from the bottom line - making money. <br />The 99 LD -2000 Is The Only 2" Mechanical Line Leak Detector <br />Capable Of Holding Line Pressure After The Pump Is Off, <br />Even With pump Component Wear Or Failure. <br />*See Technical Specifications on last page. <br />"Contact factory for details <br />MEMBER <br />M <br />vPEI. Wfimmil j U.S. Patent No. 4,966,190 - Designed and Manufactured in U.S.A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.