My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2285
>
2300 - Underground Storage Tank Program
>
PR0231111
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2023 4:39:57 PM
Creation date
6/23/2020 6:43:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231111
PE
2361
FACILITY_ID
FA0001659
FACILITY_NAME
QUIK STOP MARKET #7039
STREET_NUMBER
2285
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
141-214-03
CURRENT_STATUS
01
SITE_LOCATION
2285 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231111_2285 E FREMONT_2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERTIFICATION /TEST DATE: Auqust 08, 2018 <br />Page 2 of 3 <br />Al. FACILITY <br />A2. OWNER <br />Name Quik Stop Market #39 <br />Name Quik Stop MarkejsNPARONN1ENTAL IIEAU <br />Address 2285 E. Fremont Street, Stockton, CA 95205 <br />Address 4567 Enterprise Street, FremjX jip IMId EN I <br />Phone # 510-657-8500 <br />Phone # 510-657-8500 <br />Contact Roger Batra <br />Contact Debbie Markovich <br />D. RESULTS OF TESTING / <br />SERVICING <br />Make / Model of Monitoring System: Gilbarco EMC SN# 8085011235001 <br />Software Version Installed: 327.04 <br />{ <br />Complete the following checklist: <br />■ Yes ❑ No* Is the audible alarm operational? <br />■ Yes ❑ No* Is the visual alarm operational? <br />■ Yes <br />❑ No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />■ Yes <br />❑ No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment <br />will not interfere with their proper operation? <br />❑ Yes <br />❑ No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modems) <br />■ N/A <br />operational? <br />x. <br />■ Yes <br />❑ No * <br />For pressurized piping systems, does the turbine automatically shut down if the piping seconds containment <br />P p�p� 9 Y y P�P� 9 rY <br />❑ N/A <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shutdown? (check all that apply) 0 Sump/Trench sensors; ❑ Dispenser Containment Sensors. <br />■ Yes <br />❑ No* <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? <br />❑ Yes <br />❑ No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br />t <br />■ N/A <br />mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br />fill point(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger? _ % <br />❑ Yes * <br />■ No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement parts in Section E, below. <br />■ Yes * <br />❑ No <br />Was any liquid found inside any secondary containment systems designed as dry systems? <br />s <br />(Check all that apply) ❑ Product; 0 Water. If yes, describe causes in Section E, below. <br />■ Yes <br />❑ No* <br />Was monitoring system set-up reviewed to insure proper settings? Attach set-up reports, if applicable. <br />■ Yes <br />❑ No* <br />Is all monitoring equipment operational per manufacturer's specifications? <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. COMMENTS <br />Removed a small amount of water from the 91 STP sump. <br />Removed 5 gallons of water from the 87 fill sump. <br />Site has stand alone sensors monitoring the UDC's. <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.