My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_1996-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 11:40:15 AM
Creation date
6/23/2020 6:43:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2004
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231125_1210 E HAMMER_1996-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> Page of <br /> 7.UNDER-DISPENSER CONTAINMENT C TESTING <br /> Test Method Developed By: X UDC Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Uses: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Measuring Equipment Used for Testing: UST 2000P <br /> UDC#7/8 <br /> UDC Manufacturer: BRAVO <br /> UDC Material: STEEL <br /> UDC Depth: 12" <br /> Height from UDC Bottom to Bottom of Box <br /> Highest Piping Penetration: <br /> Height from UDC Bottom to Bottom of Box <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to FAIR <br /> testing: <br /> Portion of UDC Tested ENTIRE BOX <br /> Wait time between applying @10 MIN <br /> pressure/vacuum/water and starting <br /> test: <br /> Test Start Time: 1127 <br /> Initial Reading(RI): .8906 <br /> Test End Time: 1133 <br /> Flrial Readin (RF): .8900 <br /> Test Duration: 6IN <br /> Change in Reading(RF-R,): -.0006 <br /> Pass/Fail Threshold: +/-.001 <br /> Test Result: PASS <br /> Was sensor removed for YES <br /> testing? <br /> Was sensor properly replaced YES <br /> after testing? <br /> Comments— (include information on repairs made prior to testing) <br /> Floats removed for testiny- and then replaced <br /> All UDC's Pans 12 x 14 x 40 <br /> 55 iiallon drum of Water left on site <br /> SWRCB December 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.