My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_1996-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 11:40:15 AM
Creation date
6/23/2020 6:43:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2004
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231125_1210 E HAMMER_1996-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW UST INSTALLATION INSPECTION RECORD <br />INITIAL INSPECTIONS <br />�3 L <br />D <br />A <br />P <br />I <br />N <br />!�► <br />ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br />S, <br />VACUUM: // SOAP: PSI: HRS/141W:_36BRINE(LIGUID ANNULAR): OTHER: <br />P <br />I <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS <br />b <br />5. <br />R <br />T <br />/ <br />a <br />1V1 <br />4-7. <br />1 <br />0 <br />I <br />j <br />( <br />( 8. <br />V <br />A <br />Lf -16v <br />E <br />L <br />7—fo <br />6) <br />D <br />S <br />OVERSPILL PERFORMANCE TEST <br />(CCR 2635 (b) (1) (C)) <br />_ <br />6 <br />✓ <br />ITEM OR EQUIPMENT INSPECT ED <br />ALL PIPING AND FITTINGS CORROSION PROTECTED <br />oATE <br />7-2�1 <br />1 12. <br />® 6 <br />(CCR 2636 (c)(t)) <br />1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287) <br />�1 <br />UST INSTALLATION PLANS APPROVED <br />INITIAL INSPECTIONS <br />�3 L <br />D <br />V1 <br />INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />�vl 6. <br />PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) 7s, . ` 3 7 <br />VACUUM: // SOAP: PSI: HRS/141W:_36BRINE(LIGUID ANNULAR): OTHER: <br />.7 � y� 6 <br />� 4. <br />PRIMARY TANK TEST: PSI: .-3 HRS/MIN: 3c) <br />b <br />5. <br />TANK APPROPRIATELY PLACED WITH APPROVED SACXFILL (API/PEI) <br />PIPING INSPECTIONS <br />FINAL INSPECTION <br />�,�� <br />✓ <br />(t/ <br />�vl 6. <br />PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) 7s, . ` 3 7 <br />(ccR 2636 (e)) <br />1 15. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2643 (c) (1)) <br />b <br />1 16. PERFORMANCE TEST OF AUT04ATIC PUMP SYSTEM SHUT-OFF (CCR 2636 (Q)) <br />/ <br />a <br />1V1 <br />4-7. <br />1 <br />SECONDARY PIPING CONTAINMENT TEST PSI ;�, HRS/MIN:/ Z.7 OTHER: <br />(CCR 2636 (e)) <br />j <br />( <br />( 8. <br />L4KE TEST ON ALL SUMPS (24 HR. MINIMUM) HRS: Ez <br />(CCR 2535 (a) (4)) <br />Lf -16v <br />J 9. <br />UNUSED TANK OPENINGS LED ROSION PROTECTEDPEI <br />7—fo <br />6) <br />I �10. <br />OVERSPILL PERFORMANCE TEST <br />(CCR 2635 (b) (1) (C)) <br />_ <br />6 <br />✓ <br />i11. <br />ALL PIPING AND FITTINGS CORROSION PROTECTED <br />(CGt 2636 (b)) <br />7-2�1 <br />1 12. <br />PIPING SLOPES TO COLLECTION SUMP <br />(CCR 2636 (c)(t)) <br />FINAL INSPECTION <br />�,�� <br />✓ <br />1--413- PERFORMANCE TEST FOR "ALL" MONITORING PROBES (CCR 2632 (c) (2)) <br />Y <br />I4 <br />1 14. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (c) (2)) <br />1 15. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2643 (c) (1)) <br />b <br />1 16. PERFORMANCE TEST OF AUT04ATIC PUMP SYSTEM SHUT-OFF (CCR 2636 (Q)) <br />17. BALL HAAT VALVES INSTALLED <br />18. OVERFILL PROTECTION INSTALLED APPROVED (CCR 2635 (b) (2)) <br />119. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) API <br />Y �7_ <br />120. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (a) (5)) <br />MONITORING PLAN, ,RESPONSE PLAN AND LOG 300K ON SITE (CCR 2632 (d)) <br />122-t- FORM COMPLETED AND SUBMITTED (CCR 2635 (d)) <br />I123 MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2630-2536) <br />124. ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H+S CODE 25284) <br />_' _ �.� � it I �+►< " ' / � ' : . � � .� <br />EH23406 9/95 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.