Laserfiche WebLink
j Dynamic Back Pressure " �t <br /> AhordaTeV <br /> t� 416 2na ,3treet ® Tr 201.4 <br /> Galt)Ca.95632 <br /> (209)744-0112(800)524-9087 FAX(209)744-0116 ® Static Pressure Decay Test <br /> _ TP 2013 <br /> Owner/Contractor/Eng: TEST DATE: 9-•22-15 UST ® AST [] <br /> TECHNMAN NAW: <br /> SITE NAME, TIWANA GAS ❑ PT ❑Startup Test® Compliance Test <br /> DAVE WINKLER S.1 V #0082 <br /> Address: 1210 14AMMER AGENCY: SJV <br /> /declare, under penalty of perjury under the laws of the state <br /> o Ci STOCKTON CA o California that based on information and belie ormed ° <br /> City; ff o f Inspector: <br /> after reasonable inquiry, the statements and information <br /> Phone: provided in the document are true,accurate,and complete. <br /> 0 <br /> TECHsIGNATLrU-: p Present ❑ Not Present® Cn <br /> " o <br /> Confirmation 15-21001Permit or Facility 9 <br /> z <br /> 0 <br /> #r`DISPENSF,RS 4 DISPENSER Make. GILRARCO NOZZLE Make: VST PV Valve Make: HUSKY <br /> ff TOTAL NOZZLES 8 Model: Model: Model:5885 <br /> MANJI oLDED: Yes ® No❑ BALANCE M ASSIST ❑ Assist Type: <br /> Tank Tank Tank3 Tank TOTAL <br /> Initial pressure before testing- "we <br /> Fuel Grade 87 91 9 ALL <br /> 0 Nozzles per Tank 8 $ 8 8 EQMPMENT <br /> Actual Tank Capacity 12041 10118 10118 32277 Decay: Blockage; <br /> Gasoline Volume 6891 1593 1667 10151 Incline Manometer ❑ Incline Manometer ❑ <br /> Ullage(Capneity minuo volume) 5150 8525 8451 22126 <br /> MagnchclicCivage ❑ MagnehelicGuage <br /> Phase I System Type:2pt EVR Coaxial �i �7 Et1R co <br /> Digital Manometer ® Digital Manometer Co <br /> OD <br /> Initial Test Pressure(inrhes water)2t0 2,0 El quiprnent Calibration Date: 8-1-15 cc <br /> 2.0 Drift Check End Value: 0 PASS v, <br /> PSI I Minute pnd,e,water) Nitrogen Intro.Point: P � <br /> PSI@2Mlnutes 1.99 FTI M <br /> Allowable Fill Time @ 2 scfm 14. <br /> PSI @ 3 Mlnutes 1.99 1:5. �- <br /> 56 ��, r� <br /> PSI @ 4 Minutes 1.99 Time s <br /> Final Pressure @ 5 Minutes pnrhes water) 1.99 Time 2: <br /> 1.87 <br /> c� <br /> Allowable Final Pressure(CARR) Time 3: W <br /> Liquid Removal Check,Dynaik Back <br /> pressure(if due),and re <br /> ------- - ___w__ .......a PASS Re airs Are Listed on Page 2. <br />