My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2004-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 1:03:59 PM
Creation date
6/23/2020 6:44:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2007
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2004-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
US■ SYSTEM STE RETROFIT OB\ REPAIR <br /> AI <br /> (Submit minimum of 2 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed YES[] NO[I <br /> 2 Manufacturer's spec sheets attached for all equipment to be installed YES[] NO[ <br /> 3. Description of work to be completed(If adding piping,UDC's,or other UST equipment, or performing tank top upgrade, <br /> use the UST Installation Application pages 4-8 as necessary for a timely plan review): <br /> to�rsL ecQ k � A'e 41W ®s1 1�.eesa_Q <br /> 4. Description of equipment to be used(Attach drawingstblueprints as necessary): <br /> (tag 2r1n® 52 It ®!2Q2. 1a2`7 <br /> 5. All equipment is State certified or approved. YES[] NO[I <br /> 8. Decontamination Procedures: <br /> a. Will piping be decontaminated prior to removal? YES[] NO[] <br /> b. Identify contractor performing decontamination: <br /> Name Phone( <br /> Address City Zp <br /> c. Describe method to be used for decontamination: <br /> d. Describe how rinsate material will be stored onsite prior to mariffesting of[site: <br /> e. Rirmte Hauler and pennitted Treatin6rit,Storage&Disposal Facility. <br /> Hauler Name PhorreC__J_ Hauler Reg# <br /> Address Cily zip <br /> Permitted Disposal Site <br /> 7. a. Describe the method that will be uttT¢ed to purge andlor inert the piping: <br /> b. Piping Hauler. <br /> Name Phone�} <br /> Address City Zip <br /> Hauler Registration#(if hauled as hazardous) <br /> c. Piping Disposal Site: <br /> Name Phone <br /> Address City. Zip <br /> EPA ID#f(if transported to a permitted TSD fac Wq) <br /> 8. Is the sampling firm an independent third party from the contractor?YES[] NO[j <br /> 9. Descrbe,in detail,how the soil and/or water samples)beneath the piping or dispenser will be obtained: <br /> 10. Handing of excavated soil(Confaminated'Soil Hazardous waste Hart: <br /> Name Hauler Regintration g Phone <br /> Address Crly Zip <br /> b) If soil is not to be hauled,describe what will be done with it <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.