My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2004-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 1:03:59 PM
Creation date
6/23/2020 6:44:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2007
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2004-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />F. ln-'Tank Gauging / SIR Equipment: <br />❑ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />♦,oju ICIC <br />1A Yes <br />LIM lVA-ar. <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />No* I <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />-No * <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these aenctenctes were or win ue cvrrecum <br />G. Line Leak Detectors (LLD): <br />rn4„niple the following checklist: <br />❑ Check this box if LLDs are not installed. <br />Yes <br />❑ No*For <br />equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance'! <br />❑ N/A <br />(Check all that apply) Simulated leak rate: 53 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />V <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />OL N/A <br />❑ Yes <br />IJ No* <br />For electronic LEDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />14 N/A <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />6 N/A <br />or fails a test? <br />O Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />L5. N/A <br />Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how ana when mese uenc,enciev,. w -c v, will uv ---- <br />H. Comments: <br />Page 3 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.