Laserfiche WebLink
Underground Storage Tank Monitoring Program <br />�i <br />1, OwneriOperator/Site Kayo Oil Co. Site # 2705447 RE# 05447 a <br />2. Site Address and Phone 1469 E HAMMER LN STOCKTON, CA 95209 ph. (209) 478-1522 <br />4. Frequency of Monitoring Method and location Where Monitoring will be (USTs only): <br />Tanks: Tank(s) 01 02 0304 are monitored continuously using an electronic probe in the interstitial space of theta nk- No <br />T <br />Piping: Pipes) 0102 03 04 are equipped with continuous electronic line leak detectors_ Pipe(s) 01 62 03 04 have lightness tests performed annually capable of detecting a 0.1 MD <br />gallon per hour release. Pipe{s) 01 02 03 04 are monitored continuously by a liquid -detecting probe located in the turbine sump. o <br />z <br />0 <br />Dispenser: Dispenser pans are equipped with continuous mechanical monitoring/mechanical shut -oft device. Electronic sensors are installed to automatically shutoff the dispensers once liquid is o <br />detected. _ <br />5. Names) and title(s) of the persons) responsible for performing the monitoring and/or maintaining the equipment: <br />Operator Name and Number: Kayo Oil Co. - (209) 478-1522 <br />Maintenance: SOIvOne-1-866--215-0965 <br />6. Reporting Format: < <br />The monitor will be certified annually and a report generated and provided to the operator. The operator is to report alt audible or visual alarm conditions that may indicate a potential release <br />to the ConocoPhillips Field Representative, as well as the responsible party for maintenance listed under315_ In the event of a test failure, the specific pieoe(s) of equipment are taken out of r0 <br />service and proper reporting procedures followed. The operator is to report all suspected and confirmed releases to the ConocoPhillips Field Representative, as well as the responsible parry! a <br />for maintenan ce listed under #15. <br />M <br />7. State the Preventative Maintenance Schedule for the Monitoring Equipment: <br />The electronic monitoring system is certified annually to be functioning per manufacturer instructions by a properly trained and certified third -party contractor. Repairs are made by the <br />responsible party listed under #5 upon notification by the station operator. The station operator is responsible for maintaining copies of testing results and repair records on site and available <br />for agency inspectors. The 3rd -party testing requirements and frequencies for the lank system are summarized Mow. <br />\ � m <br />Contractor US T System Testing <br />Contractor testing of the primary tank is not required. <br />Mech apical leak detectors) tested annually. <br />The tank second ary containment is tested per manufactu rens specifications every 3 years in Piping 01 02 03 04 are tested annually. <br />accordance with CCR Title 23 Section 2637. <br />Fuel spill buckets require annual testing. Secondary containment testing for piping, turbine sumps and dispenser pans is <br />conducted every 3 years per manufacturer's speciflcalion under CCR Title 23. <br />8, Describe the Training Needed for the Operation of Both the Tank System and the Monitoring <br />The operator has been trained to check the tank system and/or monitor daily for proper operation. Training topics include performing dailylmonthly inventory reconciliation, inspection of the <br />monitoring system to ensure it is operating properly and not in alarm, periodic inspection of under -dispenser for teaks, inspection of felt and vapor spill buckets, inspection of hoses, nozzles, <br />and other ancillary tank system equipment. ff the lank system andfor monitor is not functioning correctly, the operator has been instructed to repair The equipment (if appropriate) or conlact <br />the responsible party for Maintenance listed under item #5 for repairs. <br />w <br />9. Summary of Site Operator <br />For double wall tanks monitored by interstitial probes, the monitoring equipment must be continously operational with probes in place. Report all nor-invenlory monitoring alarms to the g <br />specified maintenance company and keep a record of alarms and repair work performed. All sites are responsible for maintaining daily and monthly inventory reconciliation records and <br />nolrfying the ConocoPhillips Field Representative and the Regional Environmental Compliance Specialist for inventory variances greater than the regulatory limit_ (for Waste Oil g <br />Tank): <br />T <br />2705447105"7 Kayo Oil Co., 1469 E HAMMIER Ltd, STOCKTON, CA 95209 Date Printed: 0411 612 0 0 4 <br />